BLD-Final | 7/13/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Jim Storey
|
|
|
screened // David Phone #: ###-####
|
DOC - Permit Finaled | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 7/17/2020 | 7/17/2020 | 7/17/2020 | P | DONE |
Jim Storey
|
|
|
screened // David Phone #: ###-#### 3.6
|
BLD-Energy code compliance | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | PASS |
Tony Young
|
|
|
David Phone #: ###-####// pssed per 301 via phone call
|
BLD-Conference | 4/2/2020 | 4/3/2020 | 4/3/2020 | A | PART |
Tony Young
|
|
|
David- **Cleared** Phone #: ###-####,, needs electrical 1st,, then..,, frame ok to insulate,, need to verify seal pack and furr downs for ducting,, fire blocking
|
BLD-Wall Bracing | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Wall Bracing | 2/19/2020 | 2/19/2020 | 2/19/2020 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Hunter
|
CHANGE STATUS TO (ISS) | | | 2/19/2020 | | DONE |
|
|
|
Fees Paid
|
OVERRIDE | | | 2/14/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 1/17/2020 | 1/17/2020 | 2/14/2020 | | DONE |
Rob Patrick
|
|
|
1st Review Complete: 02/05 Townhouse L2 ePlan; passed blding review but Failed for Mechanical review
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/14/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 2/14/2020 | | DONE |
|
|
|
**PLAN MOD - DO NOT RE-ISSUE**
|
Routing - MECHANICAL | 2/13/2020 | | 2/13/2020 | | PASS |
Troy James
|
|
|
|
BLD-Wall Bracing | 2/11/2020 | 2/12/2020 | 2/12/2020 | A | PART |
Jim Storey
|
|
|
shear // David Phone #: ###-#### hd/ north wall nailling
|
Routing - Design Review | 1/24/2020 | | 1/24/2020 | | PASS |
Josh Wilson
|
|
|
|
Routing - MECHANICAL | 1/24/2020 | | 1/24/2020 | | FAIL |
Troy James
|
|
|
Emailed corrections to applicant to have the mechanical engineer to make the same changes to building E and F as was discussed for the changes for building D.
|
Routing - PLAN CHECK | 1/23/2020 | | 1/23/2020 | | PASS |
Rob Patrick
|
|
|
01/23 Passed blding review but; Failed for Mechanical's review
|
Plan Modification Accepted | | | 1/17/2020 | | DONE |
|
|
|
the width of the rooftop stair enclosure was increased by 4'-0". this creates a closet for relocating the air handler in the garage, which resolves several issues that came up while constructing the first phase of the project. this effects the mechanical duct layout, truss layout and causes some structural adjustments.
|
BLD-Foundation | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Jim Storey
|
|
|
Request early inspection about 1 Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 8/5/2019 | 8/5/2019 | 8/5/2019 | A | PASS |
Jim Storey
|
|
|
Would like to pour at 10 Phone #: ###-#### Inspection requested via web by Ben Sears
|
Telephone call | | | 7/10/2019 | | DONE |
|
|
|
called Bob to verify that all emails for all 17 permits were recieved and informed him that we need all permits signed and returned to be able to release plans.
|
Telephone call | | | 7/9/2019 | | DONE |
|
|
|
Email permits bld19-01933, 01962 & 01963 to bobh@visserbuilding.com
|
Issue PAID IN FULL permit | | | 7/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/3/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 6/4/2019 | 6/4/2019 | 7/3/2019 | | DONE |
Rob Patrick
|
|
|
06/21 sfd L2 ePlan Townhouse...06/19 Failed...06/25 Failed...06/26 Failed
|
Routing - PLAN CHECK | 7/3/2019 | | 7/3/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/3/2019 | | DONE |
|
|
|
3 PERMITS- DO NOT ISSUE WITHOUT BLD19-01933, BLD19-01962 AND BLD19-01963
ALL MET- NEED RP
|
Routing - MECHANICAL | 7/2/2019 | | 7/2/2019 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 6/27/2019 | | 6/27/2019 | | FAIL |
Troy James
|
|
|
Mechanical engineered stamp needs to be signed.
|
Routing - PLAN CHECK | 6/26/2019 | | 6/26/2019 | | FAIL |
Rob Patrick
|
|
|
Waiting for Mechanical to review.
|
Routing - MECHANICAL | 6/25/2019 | | 6/25/2019 | | FAIL |
Troy James
|
|
|
Previous correction has not been addressed.
|
Routing - PLAN CHECK | 6/25/2019 | | 6/25/2019 | | FAIL |
Rob Patrick
|
|
|
|
Routing - Design Review | 6/21/2019 | | 6/21/2019 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 6/21/2019 | | 6/21/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLANNING | 6/4/2019 | | 6/20/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 6/4/2019 | | 6/19/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
1st review completed | | | 6/19/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Route to Impact Fee Review | 6/4/2019 | 6/7/2019 | 6/5/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/4/2019 | | 6/4/2019 | | FAIL |
Troy James
|
|
|
See eplan
|
Routing - Addressing | 6/4/2019 | | 6/4/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/4/2019 | | 6/4/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/4/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/4/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/4/2019 | | DONE |
|
|
|
|
Intake Approval | | | 5/31/2019 | | FAIL |
|
|
|
Please provide a Manual J for each unit. Please leave the bottom right corner open for the City Approved Stamp on all plans (E1-00_Site Electrical Plan for example)
|
Intake Approval | | | 5/30/2019 | | FAIL |
|
|
|
Per the conversation through email, please fill out new applications for each address with the correct information for each townhome and re upload them to the documents folder. Please provide a Site Plan: Show location of the structure including balconies, decks, driveways, and walkways with dimensions and distances to the property lines.
|
Application received | | | 5/29/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 29 2019 9:44AM
|