Permit Information
Permit NumberBLD19-01933
StatusFinaled
Name VISSER BUILDING CO
Site Address 1184 S MARIETTA SPUR LN
Project NameKootenai Townhomes - Bldg E
Customer NumberBLD19-0193, 01962-01963
ePlanReviewYes
Description
(THREE BUILDING PERMITS FILED UNDER BLD19-01933) Permit for the construction of a new 1673 sq. ft., three story (first story 310 sq. ft., second story 682 sq. ft., third story 682 sq. ft.) single family dwelling with 3 bedrooms, 3.5 bathrooms, approximately 293 sq. ft. of covered patio/porch and a 372 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-3D zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/13/20207/17/20207/17/2020PPASS
DetailsJim Storey
screened // David Phone #: ###-####
DOC - Permit Finaled7/17/20207/17/20207/17/2020PPASS
DetailsJim Storey
BLD-Blower Door Test Results7/17/20207/17/20207/17/2020PDONE
DetailsJim Storey
screened // David Phone #: ###-#### 3.6
BLD-Energy code compliance4/13/20204/14/20204/14/2020APASS
DetailsTony Young
David Phone #: ###-####// pssed per 301 via phone call
BLD-Conference4/2/20204/3/20204/3/2020APART
DetailsTony Young
David- **Cleared** Phone #: ###-####,, needs electrical 1st,, then..,, frame ok to insulate,, need to verify seal pack and furr downs for ducting,, fire blocking
BLD-Wall Bracing2/19/20202/19/20202/19/2020PPASS
DetailsJim Storey
David Phone #: ###-####
BLD-Wall Bracing2/19/20202/19/20202/19/2020PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Robert Hunter
CHANGE STATUS TO (ISS)  2/19/2020 DONE
Fees Paid
OVERRIDE  2/14/2020  
Plan assigned to (RDP)1/17/20201/17/20202/14/2020 DONE
DetailsRob Patrick
1st Review Complete: 02/05 Townhouse L2 ePlan; passed blding review but Failed for Mechanical review
PLANS/APPL TAKEN TO FRONT DESK  2/14/2020 DONE
DetailsRob Patrick
Permit Ready to Issue  2/14/2020 DONE
**PLAN MOD - DO NOT RE-ISSUE**
Routing - MECHANICAL2/13/2020 2/13/2020 PASS
DetailsTroy James
BLD-Wall Bracing2/11/20202/12/20202/12/2020APART
DetailsJim Storey
shear // David Phone #: ###-#### hd/ north wall nailling
Routing - Design Review1/24/2020 1/24/2020 PASS
DetailsJosh Wilson
Routing - MECHANICAL1/24/2020 1/24/2020 FAIL
DetailsTroy James
Emailed corrections to applicant to have the mechanical engineer to make the same changes to building E and F as was discussed for the changes for building D.
Routing - PLAN CHECK1/23/2020 1/23/2020 PASS
DetailsRob Patrick
01/23 Passed blding review but; Failed for Mechanical's review
Plan Modification Accepted  1/17/2020 DONE
the width of the rooftop stair enclosure was increased by 4'-0". this creates a closet for relocating the air handler in the garage, which resolves several issues that came up while constructing the first phase of the project. this effects the mechanical duct layout, truss layout and causes some structural adjustments.
BLD-Foundation8/7/20198/7/20198/7/2019PPASS
DetailsJim Storey
Request early inspection about 1 Phone #: ###-#### Inspection requested via web by Ben Sears
BLD-Footing8/5/20198/5/20198/5/2019APASS
DetailsJim Storey
Would like to pour at 10 Phone #: ###-#### Inspection requested via web by Ben Sears
Telephone call  7/10/2019 DONE
called Bob to verify that all emails for all 17 permits were recieved and informed him that we need all permits signed and returned to be able to release plans.
Telephone call  7/9/2019 DONE
Email permits bld19-01933, 01962 & 01963 to bobh@visserbuilding.com
Issue PAID IN FULL permit  7/9/2019 DONE
Inspection Record Card- Bld  7/9/2019 DONE
OVERRIDE  7/3/2019  
Plan assigned to (RDP)6/4/20196/4/20197/3/2019 DONE
DetailsRob Patrick
06/21 sfd L2 ePlan Townhouse...06/19 Failed...06/25 Failed...06/26 Failed
Routing - PLAN CHECK7/3/2019 7/3/2019 PASS
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  7/3/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  7/3/2019 DONE
3 PERMITS- DO NOT ISSUE WITHOUT BLD19-01933, BLD19-01962 AND BLD19-01963
ALL MET- NEED RP
Routing - MECHANICAL7/2/2019 7/2/2019 PASS
DetailsTroy James
Routing - MECHANICAL6/27/2019 6/27/2019 FAIL
DetailsTroy James
Mechanical engineered stamp needs to be signed.
Routing - PLAN CHECK6/26/2019 6/26/2019 FAIL
DetailsRob Patrick
Waiting for Mechanical to review.
Routing - MECHANICAL6/25/2019 6/25/2019 FAIL
DetailsTroy James
Previous correction has not been addressed.
Routing - PLAN CHECK6/25/2019 6/25/2019 FAIL
DetailsRob Patrick
Routing - Design Review6/21/2019 6/21/2019 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK6/21/2019 6/21/2019 FAIL
DetailsRob Patrick
Corrections Req'd
Routing - PLANNING6/4/2019 6/20/2019 PASS
DetailsLeon Letson
Routing - PLAN CHECK6/4/2019 6/19/2019 FAIL
DetailsRob Patrick
Corrections Req'd
1st review completed  6/19/2019 FAIL
DetailsRob Patrick
Corrections Req'd
Route to Impact Fee Review6/4/20196/7/20196/5/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL6/4/2019 6/4/2019 FAIL
DetailsTroy James
See eplan
Routing - Addressing6/4/2019 6/4/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/4/2019 6/4/2019 PASS
DetailsAngela Hardy
Plans ACCEPTED BY PLAN TECH  6/4/2019 DONE
Intake Approval  6/4/2019 PASS
Recd Pcfee & Taken To Pln CK  6/4/2019 DONE
Intake Approval  5/31/2019 FAIL
Please provide a Manual J for each unit. Please leave the bottom right corner open for the City Approved Stamp on all plans (E1-00_Site Electrical Plan for example)
Intake Approval  5/30/2019 FAIL
Per the conversation through email, please fill out new applications for each address with the correct information for each townhome and re upload them to the documents folder. Please provide a Site Plan: Show location of the structure including balconies, decks, driveways, and walkways with dimensions and distances to the property lines.
Application received  5/29/2019 DONE
Application submitted via PDS Online on May 29 2019 9:44AM