Information based on query as of Sunday, November 10, 2024.
Permit Information
Permit NumberBLD19-01944
StatusFinaled
Name HAUCK GENE
Site Address 6119 W CASTLE DR
Project NameHauck ADU
Customer Number 
ePlanReviewNo
Description
Permit to build an accesory structure that includes 600sq' of 1bd/1bth ADU, 400sq' of garage, & 196sq' of covered porch. All work per plans, notations, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/1/201911/4/201911/4/2019APASS
DetailsTony Young
call for access // Kevin Phone #: ###-####
DOC - Permit Finaled11/4/201911/4/201911/4/2019PPASS
DetailsTony Young
BLD-Energy code compliance9/10/20199/11/20199/11/2019APASS
DetailsTony Young
Kevin Phone #: ###-####
BLD-Framing/Rough-in9/6/20199/9/20199/9/2019PPASS
DetailsDave Hannah
Resch to PM for 9-6-19, Kevin will be calling inspector- Kevin Phone #: ###-####
BLD-Wall Bracing8/21/20198/22/20198/22/2019APASS
DetailsTony Young
Kevin Phone #: ###-####
BLD-Foundation7/25/20197/26/20197/26/2019APASS
DetailsTony Young
late morning // Kevin Phone #: ###-####
BLD-Footing7/24/20197/24/20197/24/2019PPASS
DetailsDave Hannah
Kevin Phone #: ###-####
Inspection Record Card- Bld  7/24/2019 DONE
BLD-Conference7/17/20197/17/20197/18/2019PDONE
DetailsDave Hannah
Kevin- please give call for access Phone #: ###-#### talked about elev of ftgs for drainage away from structure
Routing Walk-In (BLD)7/17/20197/17/20197/17/2019APASS
DetailsBrian McGowan
Gene had a quaestion on what elevation to set the top of foundation at. I refered him to his inspector. IRC only specifies grading away from the home.
OVERRIDE  6/7/2019  
Telephone call  6/7/2019 DONE
Left voicemail for parcel owner to inform them the permit is ready and what fees are due.
Issue PAID IN FULL permit  6/7/2019 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/7/2019 DONE
DetailsJosh Bogle
Permit Ready to Issue  6/7/2019 DONE
Need
GC Form
Routing - PLANNING6/6/2019 6/6/2019 PASS
DetailsJeff Lowe
deed restriction recorded
CHANGE STATUS TO (REV)  6/4/2019 DONE
planning has not passed
Plan assigned to (JAB) Josh5/29/20195/29/20196/3/2019 PASS
DetailsJosh Bogle
6/4 ADU, paper
Routing - PLAN CHECK6/3/2019 6/3/2019 PASS
DetailsJosh Bogle
Routing - MECHANICAL6/3/2019 6/3/2019 PASS
DetailsTroy James
Stamped plans with mechanical ventilation note. Mechanical inspector shall verify mechanical ventilation has been installed.
Routing - PLANNING5/31/2019 6/3/2019 FAIL
DetailsJeff Lowe
WILL PASS upon submittal of recorded deed restricition
1st review completed  6/3/2019 DONE
DetailsJosh Bogle
Inspection Record Card- Bld  6/3/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  6/3/2019 DONE
DetailsJosh Bogle
Routing - Addressing5/29/2019 5/31/2019 PASS
DetailsDoug Chausow
ADU Address: 6119 W Castle Dr
Routing - PUBLIC WORKS5/29/2019 5/31/2019 PASS
DetailsAngela Hardy
Route to Impact Fee Review5/29/20196/3/20195/30/2019 PASS
DetailsShannon Cade
Route to Impact Fee Review5/29/20196/1/20195/30/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Plans ACCEPTED BY PLAN TECH  5/29/2019 DONE
Intake Approval  5/29/2019 PASS
Override - Parcel Holds  5/29/2019  
Recd Pcfee & Taken To Pln CK  5/29/2019 DONE
Application received 5/29/2019