Permit Information
Permit NumberBLD19-01952
StatusFinaled
Name WAYNCO CONSTRUCTION CO
Site Address 1185 S VISTA AVE
Project NameMcDonald's #4289
Customer Number 
ePlanReviewYes
Description
(MCDONALD’S #4289) ""PLAN MODIFICATION TO ADD A GREASE INTERCEPTOR"" Permit is to remodel the interior and exterior of an existing 4,471 sq. ft. assembly restaurant and new construction of exterior wall framing to create a total of 320 sq. ft. building addition (175 sq. ft. on the west end of the existing building between the existing drive-thru windows and 145 sq. ft. cooler building on the north end creating a building that is 4,791 sq. ft. (3,086 sq. ft. existing main floor + 175 sq. ft. new addition + 145 sq. ft. cooler addition + 1,385 sq. ft. basement). Approval is contingent upon adhering to the approved plans on file, plan review report and attached engineering. Work to include: removal of select site work, removal of drive-thru structural canopy, removal of select storefront windows, removal of select exterior finish, removal of select exterior walls, removal of select exterior storefront doors, removal of select mansard roof assembly, removal of select interior nonbearing walls, removal of interior menu boards and relocate, removal of dining area seating/tables/counters, select removal of select kitchen equipment and select replacement of kitchen equipment, select new site work, new exterior site concrete sidewalk, replace guardrail leading to basement, select new footing for addition, select new exterior wall infill, select new exterior wall assembly, select new exterior storefronts window and doors, select new interior nonbearing walls, relocate beverage bar counter, restroom remodel, new dining room fixture, millwork, select new kitchen equipment, select new exterior walk-in cooler, exterior roof access ladder to be in the interior of the building and adding a new roof hatch, new exterior TPO roof, select new gypsum and suspended acoustic ceiling, select new light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. Note: special inspection required, see attached form 310. Note 2: A separate sign permit is required. This building is Not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/19/20208/11/2020 DONE
MAILED 8-14-2020
First Notice 7/3/20207/9/2020 DONE
mailed 7-9-2020
Permanent Occupancy  6/23/2020 DONE
PubWorks Occupancy Approval6/19/20206/19/20206/19/2020 DONE
DetailsMike Sheppard
Print Occupancy Form  6/18/2020 DONE
BLD-Final3/27/20203/27/20203/27/2020PPASS
DetailsJim Storey
no card on site.
FIRE-Final Inspection3/26/20203/26/20203/26/2020PPASS
DetailsTroy Cobbley
Life safety passed.

Phone #: ###-#### Inspection requested via web by Dan Ryan
BLD-Aging Inspection3/25/20203/25/20203/25/2020 PASS
DetailsJim Storey
Life safety will be ok to final when the exit discharge lighting is installed and tested. fire permit open
BLD-Final11/7/201911/8/201911/12/2019PPASS
DetailsJim Storey
Justin Phone #: ###-####
BLD-Final11/7/201911/8/201911/12/2019PNR
DetailsJim Storey
Justin Phone #: ###-####
FIRE-Final Inspection11/7/201911/8/201911/8/2019AFAIL
DetailsTroy Cobbley
Life safety will be ok to final when the exit discharge lighting is installed and tested.

Justin Phone #: ###-####
BLD-Framing/Rough-in11/7/201911/7/201911/7/2019PPASS
DetailsJim Storey
Justin Phone #: ###-####
BLD-Ceiling Grid Inspection10/28/201910/28/201910/28/2019PPART
DetailsJim Storey
Justin Phone #: ###-#### grid ok pending trades.
BLD-Framing/Rough-in10/9/201910/9/201910/9/2019PPASS
DetailsJim Storey
Justin-partial Phone #: ###-#### restarooms ok to cover.
OVERRIDE  9/12/2019  
CHANGE STATUS TO (ISS)  9/12/2019 DONE
Permit Ready to Issue  9/12/2019 DONE
CHANGE STATUS TO (FEE)  8/30/2019 DONE
additional fees due to change in valuation on plan mod
BLD-Framing/Rough-in8/28/20198/28/20198/28/2019PPASS
DetailsJim Storey
Justin Phone #: ###-####
CHANGE STATUS TO (ISS)  8/22/2019 DONE
OVERRIDE  8/20/2019  
BLD-Framing/Rough-in8/20/20198/20/20198/20/2019PPART
DetailsBrandon Shaw
Parapet walls and exterior sheeting...
Plan assigned to (JG)8/6/20198/6/20198/20/2019 PASS
DetailsJavier Guzman
Plan mod McDonald's #4289 ePlan, pend envior
Telephone call  8/20/2019 DONE
left VM with Dan Ryan at Waynco asking for new 306 for plan mod that was started on 8/6/2019
Permit Ready to Issue  8/20/2019 DONE
plan mod

Need
Revised Value(application states the value is affected by the plan mod)
Routing PW Environmental8/12/2019 8/19/2019 PASS
DetailsRick Christenson
Routing - PLAN CHECK8/12/2019 8/17/2019 PASS
DetailsJavier Guzman
Routing - PUBLIC WORKS8/12/2019 8/17/2019 PASS
DetailsMorgan Webb
signed off in ePlan by PW General Morgan Webb

BLD-Footing8/15/20198/16/20198/16/2019PPASS
DetailsJim Storey
foundation and rebar // Justin Phone #: ###-####
BLD-Foundation8/14/20198/15/20198/15/2019APART
DetailsJim Storey
Justin Phone #: ###-#### wip// si pending
Routing - Design Review8/12/2019 8/12/2019 PASS
DetailsKatelyn Menuge
Plan Mod
Routing - PLUMBING8/12/2019 8/12/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC
Routing - Erosion and Sediment8/12/2019 8/12/2019 PASS
DetailsMichael Zawacki
Plan Modification Accepted  8/6/2019 DONE
plan mod in e plan-changes are addition of grease interceptor to the project-sheest SP1.0, P0.0, P1.1, P1.2, P2.1, P2.2 & {Copy of signed permit 8-6-19 and P3.1-assigned to JG-valuation will be increased
Issue PAID IN FULL permit  8/1/2019 DONE
Print Occupancy Form  8/1/2019 DONE
OVERRIDE  7/16/2019  
Plan assigned to (JG)6/4/20196/4/20197/16/2019 PASS
DetailsJavier Guzman
2nd rev comp, 07/01 L3 McDonalds ePlan
Routing - PLAN CHECK7/11/2019 7/16/2019 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL7/11/2019 7/16/2019 PASS
DetailsJavier Guzman
Signed off in ePlan by KPFF Engineer Sidney Gold
PLANS/APPL TAKEN TO FRONT DESK  7/16/2019 DONE
Permit Ready to Issue  7/16/2019 DONE
Need RP-met
all met-7-31-19 emailed dan@waynco.net the fees due CAN-
Need
GC Form
Revised Cert of Value
Routing - Design Review7/11/2019 7/11/2019 PASS
DetailsKatelyn Menuge
DRH19-00151
Route to Impact Fee Review7/5/20197/8/20197/8/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  7/5/2019 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK6/4/2019 7/5/2019 FAIL
DetailsJavier Guzman
Routing - FIRE6/4/20196/4/20197/2/2019 PASS
DetailsErika Akin
Attached comments to case
Routing Off Site - STRUCTURAL6/4/2019 6/27/2019 FAIL
DetailsJavier Guzman
Failed in ePlan by KPFF Engineer Sidney Gold

Routing - MECHANICAL6/4/2019 6/7/2019 PASS
DetailsChad Schwendiman
Routing - Design Review6/4/2019 6/6/2019 FAIL
DetailsKatelyn Menuge
Condenser
Routing - PLANNING6/4/2019 6/5/2019 PASS
DetailsDavid Moser
See CUP19-00021 and DRH19-00151
Routing - Addressing6/4/2019 6/5/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/4/2019 6/4/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment6/4/2019 6/4/2019 PASS
DetailsMichael Zawacki
RP needed
Routing - PLUMBING6/4/2019 6/4/2019 PASS
DetailsDaryl Spivey
Provide limitation of hot water on public lavs as required by ISPC 407.3
Plan Reviewer's activity  6/4/2019 PASS
Plan intake review approved
Intake Approval  6/4/2019 PASS
Intake Approval  5/31/2019 FAIL
(5-31-19) Refer to the circled items in the plan intake checklist. Resolve each item as directed. CJW
Application received  5/30/2019 DONE
Application submitted via PDS Online on May 30 2019 9:18AM
Third Notice 8/16/2020