BLD-Concrete | 7/6/2020 | 7/6/2020 | 7/6/2020 | P | PASS |
Jim Storey
|
|
|
rebar- late please- Derek *screened* Phone #: ###-#### vappor barriopr and rebar ok on slab
|
BLD-Energy code compliance | 6/22/2020 | 6/22/2020 | 6/22/2020 | P | PART |
Dave Hannah
|
|
|
Paul Phone #: ###-#### foundation insulation slab on grade
|
BLD-Foundation | 6/19/2020 | 6/19/2020 | 6/19/2020 | P | PASS |
Dave Hannah
|
|
|
Derek Phone #: ###-####
|
BLD-Footing | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PASS |
Dave Hannah
|
|
|
late morning if possible... screened // Paul Phone #: ###-####
|
Inspection Record Card- Bld | | | 6/12/2020 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/11/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 5/7/2020 | | |
|
|
|
|
Plan assigned to (RDP) | 4/3/2020 | 4/3/2020 | 5/7/2020 | | DONE |
Rob Patrick
|
|
|
1st Review Complete 04/22 Failed. 04/22 L2 ePlan Townhouse
|
Routing - PLAN CHECK | 5/7/2020 | | 5/7/2020 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/7/2020 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 5/7/2020 | | DONE |
|
|
|
7 PERMITS MET-
|
Routing - Design Review | 5/6/2020 | | 5/6/2020 | | PASS |
Josh Wilson
|
|
|
|
Plan Reviewer's activity | | | 5/1/2020 | | |
Rob Patrick
|
|
|
These 7 townhouses are ready to Pass pending Planning review.
|
1st review completed | | | 4/22/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 4/3/2020 | | 4/22/2020 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - Design Review | 4/13/2020 | | 4/13/2020 | | FAIL |
Josh Wilson
|
|
|
Upload landscape plan
|
Route to Impact Fee Review | 4/3/2020 | 4/6/2020 | 4/6/2020 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 4/3/2020 | | 4/6/2020 | | DONE |
Sue Cummings
|
|
|
Sent to Josh Wilson
|
Routing - Addressing | 4/3/2020 | | 4/3/2020 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 4/3/2020 | | 4/3/2020 | | PASS |
Candy A. Nichols
|
|
|
TOWNHOUSE
|
Routing - MECHANICAL | 4/3/2020 | | 4/3/2020 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/3/2020 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/3/2020 | | DONE |
|
|
|
|
Intake Approval | | | 4/3/2020 | | PASS |
|
|
|
|
Intake Approval | | | 3/11/2020 | | FAIL |
|
|
|
1. Manual J or HVAC calculations prepared by an engineer are required for each unit, per address.
2. Need location of bathroom exhaust fans
3. Need location of smoke alarm and carbon monoxide detectors
4. Need location of stairway lighting
|
Extend Review Timeline | | | 3/2/2020 | | DONE |
|
|
|
1st approved 180 day extension per joe. see documents
|
Meeting | | | 2/26/2020 | | DONE |
|
|
|
sent in request for extension
|
Telephone call | | | 1/6/2020 | | DONE |
|
|
|
per michael and Blane ALL plans deleted
|
Telephone call | | | 7/29/2019 | | DONE |
|
|
|
Spoke with Michael, he stated HVAC system are on the plans. we went over the application will need to have the indiviual address once the final plat is completed and I will delete all applications from the documents on eplan. went over that there would need to be a 506 and (4) 402 applications uploaded with BLD19-02196 once the final plat is completed as well
|
Intake Approval | | | 7/26/2019 | | FAIL |
|
|
|
Informed michael that he cannot apply for building permits until final plat is completed and will have to apply for a separate 506 application (and add four 402 applications in documents for the townhomes) for the building with restaurant, condos above and town homes attached. Recommended that he also apply for the other three buildings (townhomes w/individual lots) separately
|
Telephone call | | | 7/1/2019 | | |
|
|
|
left a message to Michael regarding the reason why the prescreen was fail and send him an email suggesting that he apply for each bulding instead of all 21 units at once.
|
Plans ACCEPTED BY PLAN TECH | | | 7/1/2019 | | FAIL |
|
|
|
1. Need to provided an application for each of the townhomes.
2. Stair section detail showing dimensions of treads, risers, headroom, handrails, & guard requirements.
|
Application received | | | 5/30/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 30 2019 10:33AM
|