BLD-Final | 3/11/2020 | 3/13/2020 | 3/13/2020 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 12/31/2019 | 1/3/2020 | 1/3/2020 | P | PASS |
Dave Hannah
|
|
|
david Phone #: ###-####
|
BLD-Framing/Rough-in | 12/24/2019 | 12/26/2019 | 12/26/2019 | A | PASS |
Tell Riley
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 12/18/2019 | 12/19/2019 | 12/19/2019 | P | PART |
Dave Hannah
|
|
|
David Phone #: ###-#### ok to spray insulation on underside of roof framing ok needs to finish plmb r/i and air seal
|
BLD-Wall Bracing | 10/1/2019 | 10/4/2019 | 10/4/2019 | P | PART |
Jim Storey
|
|
|
shear // david Phone #: ###-#### exterior ok to cover/ hd at back pannel needs installed.
|
BLD-Conference | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | DONE |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Conference | 8/21/2019 | 8/21/2019 | 8/21/2019 | A | DONE |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Hunter plans do not have ul 2hr base and face layers with atchament requirments. ref wp 2h soundwall and supplied info. unless arch. to provide dif.
|
BLD-Footing | 7/24/2019 | 7/24/2019 | 7/24/2019 | P | PASS |
Jim Storey
|
|
|
Darren Phone #: ###-####
|
Telephone call | | | 7/10/2019 | | DONE |
|
|
|
called Bob to verify that all emails for all 17 permits were recieved and informed him that we need all permits signed and returned to be able to release plans.
|
Issue PAID IN FULL permit | | | 7/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2019 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2019 | | DONE |
|
|
|
Emailed permtis BLD19-01957, 01956 & 01928 to bobh@visserbuilding.com
|
OVERRIDE | | | 7/1/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 7/1/2019 | | DONE |
|
|
|
3 PERMITS- ALL MET NEED RP
|
Plan assigned to (J_N) | 6/3/2019 | 6/3/2019 | 6/28/2019 | | DONE |
Jenny Nelson
|
|
|
06/20 L2 Townhomes ePlan. 2nd reveiw, failed mech. 1st complete 6/17, waiting for planning, lot lines, code year
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - MECHANICAL | 6/27/2019 | | 6/27/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 6/26/2019 | | 6/26/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 6/20/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 6/3/2019 | | 6/20/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 6/3/2019 | | 6/17/2019 | | FAIL |
Jenny Nelson
|
|
|
Footing size for three story building, code year
|
Routing - Design Review | 6/13/2019 | | 6/14/2019 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 6/3/2019 | 6/6/2019 | 6/4/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/3/2019 | | 6/4/2019 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 6/3/2019 | | 6/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/3/2019 | | 6/3/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/3/2019 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2019 | | |
|
|
|
|
Intake Approval | | | 6/3/2019 | | PASS |
|
|
|
|
Intake Approval | | | 5/31/2019 | | FAIL |
|
|
|
5-31-19 Please provide Manual J for each unit. Please leave bottom right corner open for City Approved Stamps (E1-00_Site Electrical Plan for example)
|
Intake Approval | | | 5/30/2019 | | FAIL |
|
|
|
Per the conversation through email, please fill out new applications for each address with the correct information for each townhome and re upload them to the documents folder. Please provide a Site Plan: Show location of the structure including balconies, decks, driveways, and walkways with dimensions and distances to the property lines.
|
Application received | | 5/30/2019 | | | |
|
|
|
|