BLD-Final | 2/28/2020 | 3/2/2020 | 3/2/2020 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 3/2/2020 | 3/2/2020 | 3/2/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Blower Door Test Results | 3/2/2020 | 3/2/2020 | 3/2/2020 | P | DONE |
Jim Storey
|
|
|
David Phone #: ###-#### 5.3
|
BLD-Final | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | FAIL |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Energy code compliance | 11/27/2019 | 11/29/2019 | 11/29/2019 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2019 | 11/22/2019 | 11/22/2019 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Conference | 10/25/2019 | 10/28/2019 | 10/28/2019 | A | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Conference | 10/10/2019 | 10/11/2019 | 10/16/2019 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Conference | 10/2/2019 | 10/2/2019 | 10/2/2019 | P | PEND |
Jim Storey
|
|
|
david Phone #: ###-#### david Phone #: ###-#### aproved plan missing p/l protection at above roof at top of stair enclosers and roof protection. pending arch responce.
|
BLD-Conference | 10/1/2019 | 10/2/2019 | 10/2/2019 | A | DEFR |
Jim Storey
|
|
|
david \ Phone #: ###-####
|
BLD-Wall Bracing | 9/25/2019 | 9/27/2019 | 9/27/2019 | P | PASS |
Brandon Shaw
|
|
|
shear // David Phone #: ###-####
|
BLD-Footing | 7/25/2019 | 7/26/2019 | 7/26/2019 | A | PASS |
Jim Storey
|
|
|
Daren Phone #: ###-####
|
Telephone call | | | 7/10/2019 | | DONE |
|
|
|
called Bob to verify that all emails for all 17 permits were recieved and informed him that we need all permits signed and returned to be able to release plans.
|
Issue PAID IN FULL permit | | | 7/8/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/8/2019 | | DONE |
|
|
|
|
Telephone call | | | 7/8/2019 | | DONE |
|
|
|
email to bobh@hvisserbuilding.com all three permits bld19-01929, 01959 & 01958
|
OVERRIDE | | | 6/28/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
DO NOT ISSUE WITHOUT BLD19-01929, BLD19-01958 & BLD19-01959
ALL MET-NEED RP
|
Plan assigned to (J_N) | 6/3/2019 | 6/3/2019 | 6/27/2019 | | DONE |
Jenny Nelson
|
|
|
06/20 L2 Townhomes ePlan. 2nd review, failed mech. 1st complete 6/17, waiting for planning, lot lines. code year
|
Routing - MECHANICAL | 6/27/2019 | | 6/27/2019 | | PASS |
Troy James
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 6/26/2019 | | 6/26/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 6/20/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 6/3/2019 | | 6/20/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 6/3/2019 | | 6/17/2019 | | FAIL |
Jenny Nelson
|
|
|
Footing size, code year
|
Routing - Design Review | 6/13/2019 | | 6/14/2019 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 6/3/2019 | 6/6/2019 | 6/4/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/3/2019 | | 6/4/2019 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 6/3/2019 | | 6/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/3/2019 | | 6/3/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/3/2019 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2019 | | |
|
|
|
|
Intake Approval | | | 6/3/2019 | | PASS |
|
|
|
|
Intake Approval | | | 5/31/2019 | | FAIL |
|
|
|
5-31-19 Please provide a Manual J for each unit. Please leave bottom right corner open on the plan sheets for City Approved Stamps (E0-01_Electrical Specifications for example)
|
Intake Approval | | | 5/30/2019 | | FAIL |
|
|
|
Per the conversation through email, please fill out new applications for each address with the correct information for each townhome and re upload them to the documents folder. Please provide a Site Plan: Show location of the structure including balconies, decks, driveways, and walkways with dimensions and distances to the property lines.
|
Application received | | 5/30/2019 | | | |
|
|
|
|