BLD-Energy code compliance | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | PASS |
Jim Storey
|
|
|
David *screened* Phone #: ###-####
|
BLD-Framing/Rough-in | 5/21/2020 | 5/22/2020 | 5/22/2020 | A | PASS |
Jim Storey
|
|
|
screened // David Phone #: ###-####
|
BLD-Conference | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | DONE |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Wall Bracing | 3/19/2020 | 3/20/2020 | 3/20/2020 | P | PASS |
Jim Storey
|
|
|
shear // David Phone #: ###-####
|
Permit Ready to Issue | | | 2/12/2020 | | DONE |
|
|
|
DO NOT ISSUE- plan mod approved
|
CHANGE STATUS TO (ISS) | | | 2/12/2020 | | DONE |
|
|
|
plan mod approved
|
Plan assigned to (J_N) | 1/17/2020 | 1/17/2020 | 1/27/2020 | | DONE |
Jenny Nelson
|
|
|
plan mod
|
Routing - MECHANICAL | 1/21/2020 | | 1/27/2020 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 1/17/2020 | | 1/22/2020 | | PASS |
Jenny Nelson
|
|
|
|
Routing - Design Review | 1/21/2020 | | 1/22/2020 | | PASS |
Josh Wilson
|
|
|
|
Plan Modification Accepted | | | 1/17/2020 | | DONE |
|
|
|
the width of the rooftop stair enclosure was increased by 4'-0". this creates a closet for relocating the air handler in the garage, which resolves several issues that came up while constructing the first phase of the project. this effects the mechanical duct layout, truss layout and causes some structural adjustments.
|
Telephone call | | | 7/10/2019 | | DONE |
|
|
|
called Bob to verify that all emails for all 17 permits were recieved and informed him that we need all permits signed and returned to be able to release plans.
|
Issue PAID IN FULL permit | | | 7/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2019 | | DONE |
|
|
|
|
Telephone call | | | 7/9/2019 | | DONE |
|
|
|
Emailed permits bld19-01967, 01968 & 01934 to bobh@visserbuilding.com
|
OVERRIDE | | | 6/28/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 6/3/2019 | 6/3/2019 | 6/28/2019 | | DONE |
Jenny Nelson
|
|
|
06/20 L2 Townhomes ePlan. 1st complete 6/19, Show lot lines, footing size, code year
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
all met-Need
RP - one listed not in our system
|
Routing - MECHANICAL | 6/27/2019 | | 6/27/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 6/26/2019 | | 6/26/2019 | | PASS |
Jenny Nelson
|
|
|
|
1st review completed | | | 6/20/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLANNING | 6/3/2019 | | 6/20/2019 | | PASS |
Leon Letson
|
|
|
|
Routing - PLAN CHECK | 6/3/2019 | | 6/19/2019 | | FAIL |
Jenny Nelson
|
|
|
Show lot lines, footing size, code year
|
Routing - Design Review | 6/13/2019 | | 6/14/2019 | | PASS |
Andrea Tuning
|
|
|
|
Route to Impact Fee Review | 6/3/2019 | 6/6/2019 | 6/4/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/3/2019 | | 6/4/2019 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 6/3/2019 | | 6/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/3/2019 | | 6/3/2019 | | PASS |
Angela Hardy
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/3/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/3/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/3/2019 | | PASS |
|
|
|
|
Intake Approval | | | 5/31/2019 | | FAIL |
|
|
|
Please provide a Manual J for each unit. Please leave the bottom right corner open for the City Approved Stamp on all plans (E1-00_Site Electrical Plan for example)
|
Intake Approval | | | 5/30/2019 | | FAIL |
|
|
|
Per the conversation through email, please fill out new applications for each address with the correct information for each townhome and re upload them to the documents folder. Please provide a Site Plan: Show location of the structure including balconies, decks, driveways, and walkways with dimensions and distances to the property lines.
|
Application received | | 5/30/2019 | | | |
|
|
|
|