BLD-Framing/Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Dave Hannah
|
|
|
Pat Phone #: ###-####
|
BLD-Framing/Rough-in | 7/16/2019 | 7/17/2019 | 7/17/2019 | A | PEND |
Dave Hannah
|
|
|
Pat Phone #: ###-#### ok to cover after mec rough in is signed of
|
Plan assigned to (J_N) | 6/12/2019 | 6/12/2019 | 6/13/2019 | | DONE |
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 6/13/2019 | | 6/13/2019 | | PASS |
Jenny Nelson
|
|
|
1 hour plan mod fee
|
Case Summary (BLD) | | | 6/13/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/13/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/13/2019 | | DONE |
|
|
|
Plan Mod
|
Plan assigned to (JAB) Josh | 6/12/2019 | 6/12/2019 | 6/12/2019 | | DEFR |
Jenny Nelson
|
|
|
modification - JJN did original permit
|
Plan Modification Accepted | | | 6/12/2019 | | DONE |
|
|
|
plan mod walk in-sent to JAB to see if he'll do the review
|
Routing Walk-In (BLD) | 6/7/2019 | 6/7/2019 | 6/7/2019 | A | PASS |
Jenny Nelson
|
|
|
|
Inspection Record Card- Bld | | | 6/7/2019 | | DONE |
Jenny Nelson
|
|
|
|
Case Summary (BLD) | | | 6/7/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 6/7/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/7/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/5/2019 | 6/5/2019 | 6/5/2019 | A | FAIL |
Josh Bogle
|
|
|
needs engineering
|
1st review completed | | | 6/5/2019 | | FAIL |
Rob Patrick
|
|
|
needs engineering
|
Routing Walk-In (BLD) | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | FAIL |
Josh Bogle
|
|
|
drawings lacked any structural information
|
Routing Walk-In (BLD) | 5/31/2019 | 5/31/2019 | 5/31/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 5/31/2019 | | 5/31/2019 | | FAIL |
Josh Bogle
|
|
|
no plans
|
1st review completed | | | 5/31/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 5/31/2019 | | | |
|
|
|
|