Third Notice | | 7/14/2020 | 8/11/2020 | | DONE |
|
|
|
mailed 8-11-2020
|
Second Notice | | 5/17/2020 | 7/9/2020 | | DONE |
|
|
|
mailed 7-9-2020
|
First Notice | | 4/27/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020
|
Permanent Occupancy | | | 4/17/2020 | | DONE |
|
|
|
|
BLD-Final | 4/16/2020 | 4/16/2020 | 4/16/2020 | P | PASS |
Tony Young
|
|
|
Call ahead for access - Kent screened for COVID 19 symptoms Phone #: ###-####,, ok for c of o
|
FIRE-Final Inspection | 4/15/2020 | 4/16/2020 | 4/16/2020 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarm modifications, fire extinguisher is placed with current inspection tag. Final life fire safety inspection for area of work is complete, signature provided on permit sign off card.
*screened* Please call ahead for access, space unoccupied - Kent Phone #: ###-####
|
BLD-Framing/Rough-in | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | PASS |
Dave Hannah
|
|
|
Kent Phone #: ###-#### ok to cover shaft
|
BLD-Wall cover | 12/19/2019 | 12/20/2019 | 12/20/2019 | A | DONE |
Dave Hannah
|
|
|
Kent Phone #: ###-####
|
BLD-Framing/Rough-in | 12/9/2019 | 12/10/2019 | 12/10/2019 | A | PASS |
Tony Young
|
|
|
Kent Phone #: ###-####.. ok to cover walls
|
CHANGE STATUS TO (ISS) | | | 12/6/2019 | | DONE |
|
|
|
plan mod
|
Plan assigned to (BJM) | 11/27/2019 | 11/27/2019 | 12/5/2019 | | DONE |
Brian McGowan
|
|
|
12/06- Plan Mod
|
Routing - PLAN CHECK | 12/3/2019 | | 12/5/2019 | | PASS |
Brian McGowan
|
|
|
Only HVAC alterations
|
Permit Ready to Issue | | | 12/5/2019 | | DONE |
|
|
|
Plan mod
|
Routing - MECHANICAL | 12/3/2019 | | 12/3/2019 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 11/27/2019 | | DONE |
|
|
|
HVAC designhas been modified to eleminate the need for a mini split. the existing HVAC unit that feeds focus physical therapy will have additional feeds to support the yoga studio
|
Print Occupancy Form | | | 10/23/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/23/2019 | | DONE |
|
|
|
|
Telephone call | | | 10/22/2019 | | DONE |
|
|
|
Architec was notify that permit is ready to be picked up by GC
|
Telephone call | | | 10/15/2019 | | DONE |
|
|
|
Informed the owner that we can not issue the permit until we get a letter or receipt from ACHD and if an inspection is required.
|
Plan assigned to (BJM) | 6/3/2019 | 6/3/2019 | 10/4/2019 | | DONE |
Brian McGowan
|
|
|
09/19- 3rd Review Complete- L1 Hot Yoga Studio Suite #302 ePlan
|
Routing - PLAN CHECK | 10/4/2019 | | 10/4/2019 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/4/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/4/2019 | | DONE |
|
|
|
MET
Need
ACHD
MET
GC FORM (walk in)
Revised Cert of Value (owner emailed the value from GC)
|
Routing - MECHANICAL | 9/17/2019 | | 9/17/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 8/22/2019 | | 8/22/2019 | | FAIL |
Brian McGowan
|
|
|
|
Routing - MECHANICAL | 8/15/2019 | | 8/19/2019 | | FAIL |
Troy James
|
|
|
They are relocating existing Mechanical on this floor for this TI. I don't think they addressed the relocation of the existing chase but just did the TI Mechanical.
Let me know what you think.
|
Routing - PLAN CHECK | 6/25/2019 | | 6/25/2019 | | FAIL |
Brian McGowan
|
|
|
Sent email to Mechanical for insight and if I should request a Mechanical Plan.
|
Route to Impact Fee Review | 6/7/2019 | 6/10/2019 | 6/12/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 6/7/2019 | | FAIL |
Brian McGowan
|
|
|
Relocating chase, need to know why and what it is.
Will send Review out Mnday
|
Routing - PLAN CHECK | 6/3/2019 | | 6/7/2019 | | FAIL |
Brian McGowan
|
|
|
Relocating chase, need to know why and what it is.
|
Routing - Addressing | 6/3/2019 | | 6/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/3/2019 | | 6/3/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 6/3/2019 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 5/31/2019 | | DONE |
|
|
|
Application submitted via PDS Online on May 31 2019 2:08PM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|