Permit Information
Permit NumberBLD19-01996
StatusExpired
Name GOLDEN WEST ADVERTISING
Site Address 711 N CURTIS RD
Project NameSign -St.Al's Rehabilitation
Customer Number 
ePlanReviewNo
Description
(ST. AL'S REHABILITATION HOSPITAL) (CSN19-00151) ***UPDATED ENGINEERING AND FOOTING PLANS - MDH 09/12/2019*** Permit to install (2) pylon 15'-0" x 10'-0", (1) monument 8'-4" x 8'-0", (3) wall signs 5'-0" x 26'-2", (3) addresses 2'-0" x 3'-8", (1) directional sign 4'-0" x 2'-6". Structural engineering provided. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired3/16/20203/16/20203/16/2020 PASS
Details
Residential-R105.5 or Commercial 105.5 Expiration. Every permit issued by the building official under the provisions of this chapter shall expire by limitation and become null and void if the building or work authorized by such permit is not
commenced within one calendar year from the date of issuance of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work is commenced for a period of 180 calendar days.
BLD-Footing9/16/20199/16/20199/16/2019PPASS
DetailsMike Jordan
Call prior to going Phone #: 2083425188 >> Inspection requested via mobile web by Chris Hopkins
Routing - PLAN CHECK9/12/2019 9/12/2019 PASS
DetailsMichael Hanson
received minor modification to engineered footings for monument and pylon signs via email.
MISC ACTIONS  9/12/2019 DONE
batch stamped and uploaded approved modificaiton documents into Approved Documents folder in ePlan
CHANGE STATUS TO (ISS)  9/12/2019 DONE
BLD-Footing7/23/20197/24/20197/24/2019APASS
DetailsTell Riley
Call prior to going Phone #: 2083425188 >> Inspection requested via mobile web by Chris Hopkins//ok per plans//
Permit Ready to Issue  6/7/2019 DONE
Issue PAID IN FULL permit  6/7/2019 DONE
Plan assigned to (M_H)5/31/2019 6/3/2019 DONE
DetailsMichael Hanson
CSN19-00151
Intake Approval  6/3/2019 PASS
DetailsMichael Hanson
Routing - PLAN CHECK6/3/2019 6/3/2019 PASS
DetailsMichael Hanson
1st review completed  6/3/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  6/3/2019 DONE
DetailsMichael Hanson
Application received  5/31/2019 DONE
Application submitted via PDS Online on May 31 2019 2:53PM