Permit Information
Permit NumberBLD19-02011
StatusFinaled
Name CBH HOMES
Site Address 5900 S STURGEON WAY
Project NameLOT 15 BLK 03 FORK SOUTH SUB
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 2484 sq. ft., two story (1218 sq ft main floor, 1266 sq ft upper floor) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 59 sq. ft. of covered patio/porch and a 707 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/31/20204/1/20203/31/2020APASS
DetailsMike Jordan
Garge door code is 2468, Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Blower Door Test Results3/31/20203/31/20203/31/2020PDONE
DetailsMike Jordan
3.2
DOC - Permit Finaled3/31/20203/31/20203/31/2020PPASS
DetailsMike Jordan
BLD-Energy code compliance12/2/201912/2/201912/2/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in12/2/201912/2/201912/2/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in11/26/201911/27/201911/27/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Nail 2 ply B1G truss per the engineering. Ok to insulate.
BLD-Wall Bracing11/15/201911/15/201911/15/2019APASS
DetailsMike Jordan
BLD-Wall Bracing11/14/201911/15/201911/15/2019ACANC
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Foundation10/11/201910/14/201910/14/2019PPASS
DetailsMike Jordan
wall //dane Phone #: ###-####
BLD-Foundation10/10/201910/11/201910/11/2019PCANC
DetailsTell Riley
Dane Phone #: ###-####//wall not set//will re-schedule//
BLD-Footing10/9/201910/10/201910/10/2019PPASS
DetailsTell Riley
Dane Phone #: ###-####//setbacks ok//rebar installed per plans//
Fees Due Hold9/27/2019 9/27/2019 DONE
Details
Routing - MECHANICAL9/25/2019 9/26/2019 PASS
DetailsTroy James
New manual j report
Plan Modification Accepted  9/25/2019 DONE
start workflow for plan mod-manual J per Gloria at CBH
Issue PAID IN FULL permit  9/24/2019 DONE
Inspection Record Card- Bld  9/24/2019 DONE
Plan assigned to (J_N)6/3/20196/3/20196/7/2019 DONE
DetailsJenny Nelson
06/14 sfd L1 ePlan
Routing - PLAN CHECK6/3/2019 6/7/2019 PASS
DetailsJenny Nelson
1st review completed  6/7/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  6/7/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  6/7/2019 DONE
Route to Impact Fee Review6/3/20196/6/20196/4/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL6/3/2019 6/4/2019 PASS
DetailsChad Schwendiman
Application received  6/3/2019 DONE
Application submitted via PDS Online on Jun 3 2019 8:36AM
Plans ACCEPTED BY PLAN TECH  6/3/2019 DONE
Intake Approval  6/3/2019 PASS
Recd Pcfee & Taken To Pln CK  6/3/2019 DONE
Routing - PLANNING6/3/2019 6/3/2019 PASS
DetailsSue Cummings
Routing - Addressing6/3/2019 6/3/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/3/2019 6/3/2019 PASS
DetailsAngela Hardy