BLD-Final | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | PASS |
Tell Riley
|
|
|
Elton Phone #: ###-####//ok when newel post is less than 4 3/8s from wall//
|
DOC - Permit Finaled | 2/25/2020 | 2/25/2020 | 2/25/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 2/14/2020 | 2/18/2020 | 2/18/2020 | A | PART |
Tell Riley
|
|
|
Elton Phone #: ###-####//treads and widths ok//need to return the handrails//add smoke CO detectors per plans//call for final//
|
Routing Walk-In (BLD) | 6/21/2019 | 6/21/2019 | 6/21/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/21/2019 | | 6/21/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/21/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/21/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 6/3/2019 | 6/3/2019 | 6/3/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/3/2019 | | 6/3/2019 | | FAIL |
Josh Bogle
|
|
|
needs floor plans
|
1st review completed | | | 6/3/2019 | | FAIL |
Josh Bogle
|
|
|
|
Application received | | 6/3/2019 | | | |
|
|
|
|