Permit Information
Permit NumberBLD19-02029
StatusFinaled
Name STEED CONSTRUCTION
Site Address 110 N 27TH ST
Project NameGravity Payments
Customer Number 
ePlanReviewYes
Description
(GRAVITY PAYMENTS - STEEL CANOPY ADDITION) **Note: Approved code alternate to add dry pendent sprinkler head at main entry steel canopy location, see approved letter in agency comment file** Permit is to add four new exterior steel canopies per design (totaling 409 sq. ft. in area). Approval contingent upon adhering to the approved plans on file, structural engineering and plan review report. Work to include: installation of footings, columns and canopies. Note: special inspection required, see attached 310 form. This basement and the east main entry canopy only are Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/13/20202/14/20202/14/2020APASS
DetailsJim Storey
Call half hour before // Mike Phone #: ###-####
DOC - Permit Finaled2/14/20202/14/20202/14/2020PPASS
DetailsJim Storey
FIRE-Final Inspection8/30/20198/30/20198/30/2019APASS
DetailsJim Page
No fire sprinklers, no fire alarms, final life fire safety inspection for area of work complete, card has been signed.
BLD-Foundation8/12/20198/13/20198/13/2019PPART
DetailsTony Young
concrete at 3 // Mike Phone #: ###-####//
8 piers ,, work in progress,, pending special inspection report
Issue PAID IN FULL permit  8/9/2019 DONE
emailed kevin.raymes@steedconstruction.com to sign the building and ESC permits and send back. Email came back with an out of the office reply so sent another one to chris.steed@steedconstruction.com in case they need it before the 12th
Inspection Record Card- Bld  8/9/2019 DONE
Telephone call  7/31/2019 DONE
Victor emailed wanting to know what was needed-I told him the GC needed to get us the RP, 302 & 306 forms
OVERRIDE  7/25/2019  
Plan assigned to (JG)6/13/20196/13/20197/25/2019 PASS
DetailsJavier Guzman
2nd rev comp, 06/25 L2 - Gravity Payments ePlan
Routing - PLAN CHECK7/17/2019 7/25/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  7/25/2019 DONE
Permit Ready to Issue  7/25/2019 DONE
MET NATE.WALRATH@STEEDCONSTRUCTION.COM
Need GC
Need rev cert of val
Need RP-met
Routing Off Site - STRUCTURAL7/17/2019 7/24/2019 PASS
DetailsJavier Guzman
signed off in eplan by KPFF Sidney Gold
Route to Impact Fee Review6/25/20196/28/20196/27/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - PLAN CHECK6/13/2019 6/25/2019 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL6/13/2019 6/25/2019 FAIL
DetailsJavier Guzman
Failed in eplan by KPFF Sidney Gold

1st review completed  6/25/2019 FAIL
DetailsJavier Guzman
Routing - FIRE6/13/20196/13/20196/21/2019 PASS
DetailsMark Scharfen
06.21.2019-Completed fire review. No report needed. Approved.
Routing PW Drainage6/14/2019 6/14/2019 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS6/13/2019 6/14/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment6/13/2019 6/14/2019 PASS
DetailsMichael Zawacki
Waiver approved
Routing - Design Review6/13/2019 6/14/2019 PASS
DetailsAndrea Tuning
Intake Approval  6/12/2019 PASS
DetailsJoe Bruce
Prescreen approved by JHB.
Intake Approval  6/5/2019 FAIL
DetailsJoe Bruce
Provide the following items to complete the prescreen process:
1) Provide form #310 - “Statement of Special Inspections” completed by the design engineer for the items noted in the structural notes which require a special inspector to perform inspection per chapter 17 of the 2015 IBC. Sheet S001 notes (7) seven different special inspections required for this project.
Application received  6/4/2019 DONE
Application submitted via PDS Online on Jun 4 2019 6:56AM