BLD-Final | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 12/30/2019 | 12/30/2019 | 12/30/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 12/30/2019 | 12/30/2019 | 12/30/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.92
|
PubWorks Occupancy Approval | 12/27/2019 | 12/27/2019 | 12/27/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s design professional indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Other | 10/2/2019 | 10/2/2019 | 10/2/2019 | P | PASS |
Brandon Shaw
|
|
|
Les-fire soffit Phone #: ###-####
|
BLD-Energy code compliance | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Brandon Shaw
|
|
|
les Phone #: ###-####
|
BLD-Framing/Rough-in | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Brandon Shaw
|
|
|
Les Phone #: ###-####
|
BLD-Framing/Rough-in | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Wall Bracing | 8/20/2019 | 8/21/2019 | 8/20/2019 | A | PART |
Brandon Shaw
|
|
|
First floor only...
|
BLD-Foundation | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 7/22/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 7/22/2019 | 7/22/2019 | 7/22/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 7/19/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 6/10/2019 | 6/10/2019 | 7/19/2019 | | DONE |
Rob Patrick
|
|
|
06/27 sfd L2 ePlan...06/27 Failed
|
Issue PAID IN FULL permit | | | 7/19/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/19/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/19/2019 | | 7/19/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/19/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/19/2019 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 7/18/2019 | | 7/18/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
1st review completed | | | 6/27/2019 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 6/10/2019 | | 6/27/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing PW Grading-Hillside | 6/10/2019 | | 6/18/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in ePlan
|
Route to Impact Fee Review | 6/10/2019 | 6/13/2019 | 6/11/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/10/2019 | 6/10/2019 | 6/11/2019 | | PASS |
Lee G Meredith
|
|
|
06/24-2421 S Trapper Pl Residential ePlan 404
Sprinklers are not required.
|
Routing - MECHANICAL | 6/10/2019 | | 6/11/2019 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 6/10/2019 | | 6/11/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/10/2019 | | 6/10/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/10/2019 | | 6/10/2019 | | PASS |
Michael Zawacki
|
|
|
Harris North, foothills lot.
|
Intake Approval | | | 6/10/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/10/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 6/10/2019 | | 6/10/2019 | | PASS |
Jeff Lowe
|
|
|
|
Application received | | | 6/4/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 4 2019 10:26AM
|