BLD-Framing/Rough-in | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PART |
Tony Young
|
|
|
Pavel Phone #: ###-####,, ok pending trades
|
Plan Reviewer's activity | | | 6/12/2019 | | |
Brian McGowan
|
|
|
Pavel came in to discuss leaving the bearing point under the stairs as is in order to avoid major structural alterations to support the upper floor and stair structure. The cabinet by the MW will be shortened in depth as needed and a smaller door to the pantry installed.
|
Routing Walk-In (BLD) | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 6/4/2019 | | 6/4/2019 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 6/4/2019 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 6/4/2019 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 6/4/2019 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2019 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 6/4/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/4/2019 | | DONE |
|
|
|
|
Application received | | 6/4/2019 | | | |
|
|
|
|