BLD-Final | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
DOC - Permit Finaled | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 1/8/2020 | 1/8/2020 | 1/8/2020 | P | DONE |
Mike Jordan
|
|
|
5.8
|
BLD-Energy code compliance | 10/24/2019 | 10/25/2019 | 10/25/2019 | A | PASS |
Mike Jordan
|
|
|
Sam Phone #: ###-####
|
BLD-Framing/Rough-in | 10/21/2019 | 10/22/2019 | 10/22/2019 | A | PASS |
Mike Jordan
|
|
|
SAM Phone #: ###-####. All framing issues have been resolved. ok to insulate.
|
BLD-Framing/Rough-in | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | FAIL |
Mike Jordan
|
|
|
sam Phone #: ###-####. Complete lateral bracing on A01, A02, and A03 trusses. Fire block above and either side of archway in hallway. Provide additional 2x4 studs on east garage wall at locations so that trusses above are within 5 inches of a stud. Provide the approved set of plans. Ok to insulate. Correction notice posted.
|
BLD-Wall Bracing | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Mike Jordan
|
|
|
shear // Sam Phone #: ###-####
|
Routing - MECHANICAL | 9/16/2019 | | 9/16/2019 | | PASS |
Troy James
|
|
|
Revised manual j
|
BLD-Foundation | 8/8/2019 | 8/9/2019 | 8/9/2019 | A | PART |
Mike Jordan
|
|
|
Erme-stem wall Phone #: ###-####
|
BLD-Footing | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PART |
Mike Jordan
|
|
|
Erme Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/12/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/10/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 6/6/2019 | 6/6/2019 | 7/10/2019 | | DONE |
Rob Patrick
|
|
|
06/19 sfd L1 PAPER...06/26 Failed
|
Telephone call | | | 7/10/2019 | | DONE |
|
|
|
called Jackie at ###-#### to inform her that permit is ready for pick up and the fees due
|
Routing - PLANNING | 7/10/2019 | | 7/10/2019 | | FAIL |
Sue Cummings
|
|
|
no 8 1/2 X 11 site plan to scan into the computer
|
Routing - PLANNING | 7/10/2019 | | 7/10/2019 | | PASS |
Sue Cummings
|
|
|
recieved site plan 7/10/19
|
Routing - PLAN CHECK | 7/10/2019 | | 7/10/2019 | | PASS |
Rob Patrick
|
|
|
|
Case Summary (BLD) | | | 7/10/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2019 | | DONE |
Rob Patrick
|
|
|
|
Inspection Record Card- Bld | | | 7/10/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/10/2019 | | DONE |
|
|
|
met
|
Plan resubmittals received | | | 7/8/2019 | | DONE |
|
|
|
Two copies of sheets CS, D1A and D2 taken to Rob
|
1st review completed | | | 6/26/2019 | | FAIL |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 6/12/2019 | | 6/26/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - MECHANICAL | 6/10/2019 | | 6/12/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLANNING | 6/6/2019 | | 6/10/2019 | | FAIL |
Sue Cummings
|
|
|
Site plan not to scale. Can't measure everything I need.
|
Routing - PUBLIC WORKS | 6/6/2019 | | 6/10/2019 | | PASS |
Morgan Webb
|
|
|
|
Route to Impact Fee Review | 6/6/2019 | 6/9/2019 | 6/7/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - Addressing | 6/6/2019 | | 6/7/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 6/6/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/6/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/6/2019 | | DONE |
|
|
|
|
Application received | | 6/5/2019 | | | |
|
|
|
|