BLD-Aging Inspection | 7/30/2020 | 7/30/2020 | 7/31/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Conference | 7/30/2020 | 7/30/2020 | 7/30/2020 | P | DONE |
Tony Young
|
|
|
Zach *screened* Phone #: ###-####// walk through
|
BLD-Aging Inspection | 7/29/2020 | 7/29/2020 | 7/30/2020 | | PASS |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Dave Hannah
|
|
|
Zach Phone #: ###-#### front drive canopy ok
|
BLD-Wall cover | 2/21/2020 | 2/24/2020 | 2/24/2020 | A | PASS |
Jim Storey
|
|
|
Zach Phone #: ###-####
|
BLD-Foundation | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Frost protection is required...
|
BLD-Framing/Rough-in | 2/5/2020 | 2/6/2020 | 2/7/2020 | P | PASS |
Tony Young
|
|
|
Zach Phone #: ###-####,, ok to cover
|
BLD-Framing/Rough-in | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PEND |
Tony Young
|
|
|
Zach Phone #: ###-####
|
BLD-Conference | 2/4/2020 | 2/5/2020 | 2/5/2020 | A | PART |
Tony Young
|
|
|
Zach Phone #: ###-####,, ok to cover interior walls without mechanical
|
OVERRIDE | | | 2/4/2020 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/4/2020 | | DONE |
|
|
|
plan mod
|
Permit Ready to Issue | | | 2/4/2020 | | DONE |
|
|
|
DO NOT ISSUE- plan mod approved
|
Plan assigned to (Joe) | 12/10/2019 | 12/10/2019 | 2/3/2020 | | PASS |
Joe Bruce
|
|
|
(plan mod) Big Automotive
|
Routing - PLAN CHECK | 2/3/2020 | | 2/3/2020 | | PASS |
Joe Bruce
|
|
|
plan mod passed.
|
BLD-Footing | 1/27/2020 | 1/28/2020 | 1/28/2020 | P | PASS |
Dave Hannah
|
|
|
Zack Phone #: ###-####
|
Intake Approval | | | 1/27/2020 | | FAIL |
Joe Bruce
|
|
|
The PEMB drawings are missing an engineers stamp. Sent drawings back for upload.
|
BLD-Framing/Rough-in | 1/16/2020 | 1/16/2020 | 1/17/2020 | P | NR |
Tony Young
|
|
|
Donavin Phone #: ###-####// frame walk through only,, needs trades, seal pack etc.
|
Plan resubmittals received | | | 1/7/2020 | | FAIL |
Joe Bruce
|
|
|
The pre-engineered metal building drawings still have references to the firewall.
|
Plan resubmittals received | | | 1/2/2020 | | FAIL |
Joe Bruce
|
|
|
There are still multiple locations I am seeing references to the fire wall on this set of plans. Sheet A-0.0 - Project Narrative still references the shop and office to be separated by a firewall, Sheet A2.4 - Wall type 2A still references the UL fire wall assembly. The PEMB drawings have a firewall listed on most of the drawings. - There might be other references to this firewall on the plans that I have not found. Please have all these references to the firewall removed. I am mostly concerned with these drawings being referenced in the future and seeing the firewall reference on the plans will confuse the plans examiner and require the firewall rating to be maintained.
|
Routing - FIRE | 12/18/2019 | 12/18/2019 | 12/27/2019 | | PASS |
Joe Bruce
|
|
|
See email for alternate agreement to providing a fire alarm system throughout building in lieu of fire canisters. Applicant is removing fire wall since fire alarm system is being provided throughout. **JHB**
|
Plan resubmittals requested | | | 12/27/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 12/18/2019 | | 12/27/2019 | | FAIL |
Joe Bruce
|
|
|
Plan Mod failed since all plans sheets have not been updated to remove the fire wall.
|
Intake Approval | | | 12/16/2019 | | FAIL |
Joe Bruce
|
|
|
Please provide the following to complete your prescreen:
1) Sheets A3.2 and A3.3 are missing a stamp by the registered design professional. Provide the architects stamp on these sheets.
|
Plan Modification Accepted | | | 12/10/2019 | | DONE |
|
|
|
plan mod -removing the fire wall between the residence/office and shop
|
Issue PAID IN FULL permit | | | 11/20/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/20/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/20/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/20/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 11/19/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 6/19/2019 | 6/21/2019 | 11/19/2019 | | PASS |
Joe Bruce
|
|
|
(4th Rev Comp) 07/30 - 502 Big Automotive Addition and Remodel
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2019 | | DONE |
Joe Bruce
|
|
|
Addtional plan review fees for 5th plan review from structural engineer.
|
Permit Ready to Issue | | | 11/19/2019 | | |
|
|
|
ALL MET NEED
RP
MET-
GC
Revised Certificate of Value
|
Routing Off Site - STRUCTURAL | 11/12/2019 | | 11/18/2019 | | PASS |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 11/12/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 10/21/2019 | | DONE |
Joe Bruce
|
|
|
ePlan task sent back to Architect.
|
Routing Off Site - STRUCTURAL | 10/15/2019 | | 10/21/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ - Chris Holladay
|
Routing PW Drainage | 10/15/2019 | | 10/17/2019 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 10/15/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 9/12/2019 | | DONE |
Joe Bruce
|
|
|
ePlan task sent back to architect.
|
Routing PW Drainage | 9/5/2019 | | 9/12/2019 | | FAIL |
Jason C. Taylor
|
|
|
see changemarks in ePlan. JCT
|
Routing Off Site - STRUCTURAL | 9/5/2019 | | 9/9/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ - Corrections Required.
|
Routing - PLAN CHECK | 9/5/2019 | | 9/9/2019 | | PASS |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 9/5/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 8/12/2019 | | 8/20/2019 | | FAIL |
Joe Bruce
|
|
|
See 2nd Plan Review report for additional items required for a resubmittal.
|
Plan resubmittals requested | | | 8/20/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with Glenn on the phone about resubmittal items. JHB
|
Routing - FIRE | 8/12/2019 | 8/12/2019 | 8/19/2019 | | PASS |
Mark Scharfen
|
|
|
08/23-Big Automotive resubmittal MS review complete. UPloaded and emailed rev_fire 08.19.2019.pdf to architect. Architect provided information. Resolved.
|
Routing Off Site - STRUCTURAL | 8/12/2019 | | 8/14/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing PW Drainage | 8/12/2019 | | 8/14/2019 | | FAIL |
|
|
|
NEED VARIANCE OK
|
Routing - MECHANICAL | 8/12/2019 | | 8/13/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLUMBING | 8/12/2019 | | 8/13/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing - PUBLIC WORKS | 8/12/2019 | | 8/13/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing PW Street Lights | 8/12/2019 | | 8/12/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 8/12/2019 | | 8/12/2019 | | PASS |
DeAnn Brown
|
|
|
Additional plumbing fixtures will connect to existing on-site sewer service outside the building.
|
Plan resubmittals received | | | 8/12/2019 | | DONE |
Joe Bruce
|
|
|
|
Route to Impact Fee Review | 7/29/2019 | 8/1/2019 | 8/9/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 6/19/2019 | 6/21/2019 | 7/29/2019 | | FAIL |
Mark Scharfen
|
|
|
07.29.2019-Completed fire review. Uploaded and emailed to architect and applicant rev_fire 07.29.2019.pdf
|
1st review completed | | | 7/29/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 7/29/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 6/19/2019 | | 7/26/2019 | | FAIL |
Joe Bruce
|
|
|
Added plan review report with corrections required in the agency comments folder in ePlan.
|
Routing Off Site - STRUCTURAL | 6/19/2019 | | 7/17/2019 | | FAIL |
Joe Bruce
|
|
|
AHJ - Chris Holladay
|
Routing PW Environmental | 6/21/2019 | | 7/16/2019 | | PASS |
Rick Christenson
|
|
|
Approved for office/storage
|
Meeting | | | 7/16/2019 | | DONE |
|
|
|
Submitted a Revised Certificate of Value without interior Demo
|
Routing - MECHANICAL | 7/8/2019 | | 7/8/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 6/21/2019 | | 7/5/2019 | | FAIL |
|
|
|
geotech sidewall infiltration, less tan3 ft to gwand apendex j
|
Routing PW Solid Waste | 6/21/2019 | | 7/2/2019 | | PASS |
Peter J. McCullough
|
|
|
Approved for Commercial carts only.
|
Routing - MECHANICAL | 6/19/2019 | | 6/27/2019 | | FAIL |
Troy James
|
|
|
Emailed the applicant
|
Routing - Erosion and Sediment | 6/19/2019 | | 6/25/2019 | | PASS |
Michael Zawacki
|
|
|
RP needs valid con #
|
Routing - PLUMBING | 6/19/2019 | | 6/24/2019 | | FAIL |
Dan Ediger
|
|
|
1. Requires a 4" building drain.
2. Install a backflow assembly.
|
Routing - PLANNING | 6/19/2019 | | 6/21/2019 | | PASS |
Brent Moore
|
|
|
|
Routing - Addressing | | | 6/21/2019 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/19/2019 | | 6/21/2019 | | FAIL |
Morgan Webb
|
|
|
NEED DETAILED PLUMBING PLANS FOR ENTIRE PROJECT.
|
Routing PW Street Lights | 6/21/2019 | | 6/21/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 6/21/2019 | | 6/21/2019 | | FAIL |
DeAnn Brown
|
|
|
Show how new waste piping for bathroom in shop addition will connect to existing sewer service or the sewer main in State Street.
|
Intake Approval | | | 6/19/2019 | | PASS |
Brian McGowan
|
|
|
|
Intake Approval | | | 6/12/2019 | | FAIL |
Brian McGowan
|
|
|
The drawings for the steel building must be a minimum 18"x24".
The City of Boise Approval Stamp must be legible when applied as well.
I think the stamp should work when the sheets are 18"x24" or 24"x36" like the other drawing sheets. Please verify prior to resubmitting.
|
Intake Approval | | | 6/10/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following documents or information for your Prescreen to be approved;
1. Provide all sheets for Form #310.
2. Provide a Landscape Plan and Plant schedule.
3. Provide an ESC Plan
4. Sheet A-10.0 was not provided as specified in the Checklist.
5. No Plumbing Fixture Schedule on Sheet P-1
6. Please provide the drawings, energy compliance and details for the proposed shop.
|
Application received | | | 6/6/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 6 2019 1:45PM
|