Second Notice | | 7/19/2020 | 8/11/2020 | | DONE |
|
|
|
MAILED 8-14-2020
|
First Notice | 5/29/2020 | 5/29/2020 | 7/9/2020 | | DONE |
Brandon Shaw
|
|
|
mailed 7-9-2020
|
BLD-Aging Inspection | 5/29/2020 | 5/29/2020 | 5/29/2020 | | DEFR |
Brandon Shaw
|
|
|
|
DOC - Permit Finaled | 5/29/2020 | 5/29/2020 | 5/29/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 1/16/2020 | 1/16/2020 | 1/16/2020 | P | NR |
Jim Storey
|
|
|
open ele permit
|
BLD-Final | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | NR |
Jim Storey
|
|
|
Nate Phone #: ###-#### open ele permit
|
FIRE-Final Inspection | 1/16/2020 | 1/16/2020 | 1/16/2020 | A | PASS |
Jim Page
|
|
|
Fire alarm inspection complete, no fire sprinklers, fire extinguishers not required for this scope, final life fire safety inspection for scope of work complete, signature card not available at time of inspection, no signatures provided.
|
Zoning Approval | 1/6/2020 | 1/6/2020 | 1/6/2020 | | PASS |
Katelyn Menuge
|
|
|
|
PubWorks Occupancy Approval | 12/11/2019 | 12/11/2019 | 12/11/2019 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PART |
Brandon Shaw
|
|
|
Temp C of O is approved for store only... All permits to be finaled when canopy and fuel island are fininshed...
|
FIRE-Final Inspection | 12/9/2019 | 12/9/2019 | 12/9/2019 | P | PART |
Troy Cobbley
|
|
|
A temp for life safety is ok'd by Joe Bruce until the gas islands have been completed/inspected. Previous corrections have been addressed. Nate Phone #: ###-####
|
Print Occupancy Form | | | 12/5/2019 | | DONE |
|
|
|
|
Zoning Approval Temp | 12/4/2019 | 12/4/2019 | 12/4/2019 | | PASS |
Katelyn Menuge
|
|
|
Bond for Landscape
|
Inspection Record Card- Bld | | | 12/2/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 9/20/2019 | | 11/14/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed for PLAN MOD - 09/27 plan mod - Jacksons HVAC
|
CHANGE STATUS TO (ISS) | | | 10/17/2019 | | DONE |
|
|
|
plan mod approved
|
OVERRIDE | | | 10/16/2019 | | |
|
|
|
|
Routing - PLAN CHECK | 10/8/2019 | | 10/16/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing Off Site - STRUCTURAL | 10/8/2019 | | 10/16/2019 | | PASS |
Michael Hanson
|
|
|
KPFF
|
Routing - PLAN CHECK | 10/15/2019 | | 10/16/2019 | | PASS |
Michael Hanson
|
|
|
1 HOUR PLAN MOD REVIEW FEE
|
Permit Ready to Issue | | | 10/16/2019 | | DONE |
|
|
|
PLAN MOD
MET office@pnccontractors.com
Need Rev Val for plan mod
|
Routing - Design Review | 10/15/2019 | | 10/15/2019 | | PASS |
Katelyn Menuge
|
|
|
|
Routing - Design Review | 10/8/2019 | | 10/10/2019 | | FAIL |
Katelyn Menuge
|
|
|
Waiting on letter from BRS justifying painting of rtus rather than screening.
|
Routing - MECHANICAL | 10/9/2019 | | 10/9/2019 | | PASS |
Troy James
|
|
|
|
Routing - MECHANICAL | 10/1/2019 | | 10/1/2019 | | FAIL |
Troy James
|
|
|
Need mechanical engineered plans submitted for review. Left voicemail to applicant.
|
Routing Off Site - STRUCTURAL | 10/1/2019 | | 10/1/2019 | | FAIL |
Michael Hanson
|
|
|
See changemark in ePLan for corrections required per KPFF.
|
Routing - PLAN CHECK | 10/1/2019 | | 10/1/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks from structural, design review, and mechanical for corrections required.
|
Routing - Design Review | 9/25/2019 | | 9/25/2019 | | FAIL |
Katelyn Menuge
|
|
|
Demonstrate how rooftop equipment will be screened from all streets / public view.
|
Intake Approval | | | 9/23/2019 | | FAIL |
Michael Hanson
|
|
|
Provide updated engineering for new RTU locations.
|
Plan Modification Accepted | | | 9/20/2019 | | DONE |
|
|
|
Added (2) new roof top units to building with structural calculations
|
BLD-Framing/Rough-in | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PASS |
Jim Storey
|
|
|
N side wall - Nate Phone #: ###-#### north wall ok/ need si for welds on east wall
|
Issue PAID IN FULL permit | | | 7/31/2019 | | DONE |
|
|
|
sent email to officePNC
|
Inspection Record Card- Bld | | | 7/31/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/31/2019 | | DONE |
|
|
|
Resend permits because customer did not received email- office@pnccontractors.com
|
Inspection Record Card- Bld | | | 7/31/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/26/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 7/26/2019 | | DONE |
|
|
|
all met
NEED RP-met
GC FORM-met
REVISED VALUE-met
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2019 | | DONE |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 7/17/2019 | | 7/25/2019 | | PASS |
Michael Hanson
|
|
|
|
Routing Off Site - STRUCTURAL | 7/17/2019 | | 7/25/2019 | | PASS |
Michael Hanson
|
|
|
Approval per Nickolas Pena @ KPFF.
|
Plan assigned to (M_H) | 6/19/2019 | | 7/25/2019 | | DONE |
Michael Hanson
|
|
|
1st review completed - 07/11 #520 L3 ePlan - Jacksons remodel
|
Routing - Design Review | 7/18/2019 | | 7/18/2019 | | PASS |
Katelyn Menuge
|
|
|
DRH19-00113
|
Route to Impact Fee Review | 7/10/2019 | 7/13/2019 | 7/11/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 6/19/2019 | 6/19/2019 | 7/11/2019 | | PASS |
Mark Scharfen
|
|
|
07.11.2019-Completed fire review. Uploaded rev_fire 07.11.2019.pdf.
|
Routing Off Site - STRUCTURAL | 6/19/2019 | | 7/10/2019 | | FAIL |
Michael Hanson
|
|
|
See changemarks in ePlan from KPFF
|
Routing - PLAN CHECK | 6/19/2019 | | 7/10/2019 | | FAIL |
Michael Hanson
|
|
|
See changemark in ePlan for corrections required.
|
1st review completed | | | 7/10/2019 | | FAIL |
Michael Hanson
|
|
|
|
Routing PW Solid Waste | 6/19/2019 | | 6/21/2019 | | PASS |
Peter J. McCullough
|
|
|
|
Routing - Addressing | 6/19/2019 | | 6/21/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLANNING | 6/19/2019 | | 6/20/2019 | | PASS |
|
|
|
|
Routing PW Drainage | 6/19/2019 | | 6/20/2019 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Street Lights | 6/19/2019 | | 6/20/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing - Design Review | 6/19/2019 | | 6/20/2019 | | FAIL |
Katelyn Menuge
|
|
|
Need additional tree at east end of northernmost parking row.
|
Routing - PUBLIC WORKS | 6/19/2019 | | 6/19/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 6/19/2019 | | 6/19/2019 | | PASS |
Michael Zawacki
|
|
|
RP needed, site prep inspection required.
|
Intake Approval | | | 6/14/2019 | | PASS |
|
|
|
|
Intake Approval | | | 6/13/2019 | | FAIL |
Brian McGowan
|
|
|
06/13/19
Please relocate the copyright notation from the electrical sheets.
Thank you,
|
Intake Approval | | | 6/12/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following documents or information in order to approve your Prescreen;
1. Completed Form #304-
2. Letter from SUEZ concerning fire flow.
3. ESC Waiver Letter or ESC Plans
4. Soils and Geotech Report
5. The original signed and notarized O and M Agreement.
6. Dimensions on the Site Plan showing the building location from the property line.
7. Many of the drawing sheets have your Copyright notation located where the City Stamp will need to be placed. Please relocate this note.
Thank you,
|
Intake Approval | | | 6/10/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following information or documents for your Prescreen to be approved;
1. A Submittal Checklist must be provided. Provide all the required/requested information and drawings as specified on this form.
2. Only the cover sheet of Form #310 was provided in the Documents and (2) Sheets in the Drawing File. Please provide all the sheets in the Document File.
3. Planning and Zoning Approval Letters must be provided with the submittal.
The Submittal Checklist must be provided with the Prescreen. I cannot verify all the required information without you filling it out as required.
Thank you,
|
Application received | | | 6/7/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2019 8:25AM
|
Third Notice | | 8/16/2020 | | | |
|
|
|
|