BLD-Wall cover | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | DEFR |
Jim Storey
|
|
|
please come inspect the daft stop on the roof for the parapet. Roof line. Phone #: ###-#### Inspection requested via web by Andy Pense
bld19-02339
|
BLD-Framing/Rough-in | 5/7/2020 | 5/7/2020 | 5/7/2020 | P | PASS |
Dave Hannah
|
|
|
Framing inspection on the SE corner soffit on the first floor. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 5/4/2020 | 5/5/2020 | 5/6/2020 | P | PASS |
Brandon Shaw
|
|
|
North East corner framing inspection to cover. 6th floor to 8th. Also the soffit on the first floor North elevation. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/30/2020 | 4/30/2020 | 4/30/2020 | P | PART |
Dave Hannah
|
|
|
please get with Jake ISI when on site. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/28/2020 | 4/29/2020 | 4/30/2020 | A | PASS |
Dave Hannah
|
|
|
Please come inspect the North East exterior framing from GL, 8-11 levels 6-10. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/21/2020 | 4/22/2020 | 4/30/2020 | P | PASS |
Dave Hannah
|
|
|
Inspection on the Framing to cover. West elevations to the roof. South West corner to the roof. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/23/2020 | 4/23/2020 | 4/30/2020 | A | PASS |
Dave Hannah
|
|
|
Inspection on the Framing to cover. West elevations to the roof. South West corner to the roof. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/16/2020 | 4/20/2020 | 4/20/2020 | A | PASS |
Dave Hannah
|
|
|
First floor North Exterior soffit. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/13/2020 | 4/14/2020 | 4/14/2020 | A | PASS |
Dave Hannah
|
|
|
Inspection for exterior soffit North-West elevation floors 6, 7, 8. Call Mike when your on site. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 4/6/2020 | 4/6/2020 | 4/8/2020 | P | PART |
Dave Hannah
|
|
|
Framing inspection for the 2nd 3rd 4th floor interior. south side soffit first floor south side ; first floor east side. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 3/31/2020 | 4/1/2020 | 4/1/2020 | P | PART |
Dave Hannah
|
|
|
Framing inspections on the first floor South and West elevations for the ribbon framing to get sheeted. Phone #: ###-#### Inspection requested via web by Andy Pense sw corner of 2,3 &4 ok
|
BLD-Framing/Rough-in | 3/27/2020 | 3/30/2020 | 3/30/2020 | A | PART |
Dave Hannah
|
|
|
Please inspected the West side of the building framing. Call Andy when on site. Phone #: ###-#### Inspection requested via web by Andy Pense nw corner levels 2,3and 4 ok
|
BLD-Framing/Rough-in | 3/25/2020 | 3/26/2020 | 3/26/2020 | A | PART |
Dave Hannah
|
|
|
Framing inspection please get with Andy Pense/ Mike Koci Phone #: ###-#### Inspection requested via web by Andy Pense first floor ok to start one siding top of walls
|
BLD-Framing/Rough-in | 3/25/2020 | 3/25/2020 | 3/25/2020 | A | PART |
Dave Hannah
|
|
|
Framing inspection on the north elevations. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 3/16/2020 | 3/16/2020 | 3/16/2020 | P | PART |
Dave Hannah
|
|
|
PM inspection for the East end framing. Please get with Mike Koci or Andy Pense. Phone #: ###-#### Inspection requested via web by Andy Pense ok to cover
|
BLD-Framing/Rough-in | 3/9/2020 | 3/10/2020 | 3/10/2020 | A | PART |
Dave Hannah
|
|
|
Please come visit to view the framing on the South East elevation. Phone #: ###-#### Inspection requested via web by Andy Pense FLOORS 2,3 & 4 EAST end south wall ok to cover
|
BLD-Framing/Rough-in | 3/6/2020 | 3/9/2020 | 3/9/2020 | A | CANC |
Dave Hannah
|
|
|
Framing clip inspection. Please get with Mike Koci and or Andy Pense Phone #: ###-#### >> Inspection requested via web by Andy Pense Inspection cancelled from web by: Andy Pense
|
BLD-Framing/Rough-in | 3/2/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Dave Hannah
|
|
|
Please come out and inspect the screw and attachment of clips prior to sheeting. Please see Mike Koci or Andy Pense for comments. Thank you. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 2/19/2020 | 2/21/2020 | 2/21/2020 | A | PART |
Dave Hannah
|
|
|
please stop by and check out installation of the clips on 3rd-5th. Get with Mike Koci while on site. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Wall Bracing | 2/5/2020 | 2/6/2020 | 2/6/2020 | A | PASS |
Dave Hannah
|
|
|
Can we get an inspector to check out our clips attached to the bent plate levels 2 and 3. Please reach out to Mike Koci or Andy Pense Superintendents on site. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Other | 1/28/2020 | 1/29/2020 | 1/29/2020 | P | PEND |
Dave Hannah
|
|
|
Need to have the framing clips to the steel inspected please. Phone #: ###-#### Inspection requested via web by Andy Pense work in progresss
|
BLD-Other | 1/28/2020 | 1/29/2020 | 1/29/2020 | A | DONE |
Dave Hannah
|
|
|
Need to have the Fire proofing inspected on the 2nd floor. Please get a hold of Mr. Mike Koci or my self when on site. Thank you. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Concrete | 1/17/2020 | 1/21/2020 | 1/23/2020 | A | PASS |
Dave Hannah
|
|
|
SOG Bar inspection pre pour. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Concrete | 12/16/2019 | 12/19/2019 | 12/19/2019 | A | PEND |
Dave Hannah
|
|
|
concrete placement 2nd level east. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Concrete | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PEND |
Dave Hannah
|
|
|
please come out and do a pre pour inspection. Phone #: ###-#### Inspection requested via web by Andy Pense east half second fl ok after spec inspection sign off
|
BLD-Footing | 10/21/2019 | 10/25/2019 | 10/25/2019 | A | PEND |
Mike Jordan
|
|
|
GL-A continuous footings need to be inspected. Phone #: ###-#### Inspection requested via web by Andy Pense. Ok pending special inspection.
|
BLD-Foundation | 10/21/2019 | 10/23/2019 | 10/23/2019 | A | PASS |
Dave Hannah
|
|
|
GL-1 walls need to be inspected. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Footing | 10/17/2019 | 10/18/2019 | 10/18/2019 | P | PASS |
Jim Storey
|
|
|
GL-A spread footings. Please see on site superintendent to confirm. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Foundation | 10/14/2019 | 10/17/2019 | 10/17/2019 | A | PART |
Jim Storey
|
|
|
Continuous Perimeter footings. Phone #: ###-#### Inspection requested via web by Andy Pense 1 grid line wall ok parallel to idaho road/ no one in office no log seen.
|
BLD-Foundation | 10/8/2019 | 10/9/2019 | 10/9/2019 | P | PEND |
Dave Hannah
|
|
|
Please call Andy Pense ###-#### if there are and comments or concerns.
Shear Walls and Piers. Phone #: ###-#### Inspection requested via web by Andy Pense ok to place concrete after spec inpc sign offs
|
BLD-Footing | 10/8/2019 | 10/8/2019 | 10/9/2019 | P | PASS |
Dave Hannah
|
|
|
Please call Andy Pense ###-#### if there are and comments or concerns.
Continuous Footings. Phone #: ###-#### Inspection requested via web by Andy Pense ok to place concrete after spec inpc sign offs
|
BLD-Footing | 10/4/2019 | 10/7/2019 | 10/7/2019 | A | PEND |
Dave Hannah
|
|
|
Please get with Andy Pense with any concerns or comments thank you. We need to have a footing inspection on the material man hoist footing as well as the elevator footing.
Thank you. Phone #: ###-#### Inspection requested via web by Andy Pense ok to place concrete after spec insp final sign off is oked
|
BLD-Footing | 9/30/2019 | 10/2/2019 | 10/3/2019 | A | PASS |
Dave Hannah
|
|
|
Brace frame footing inspection at Grid 5.2. Large mat footing in middle of project. Please call Mike when in route. Thanks! Phone #: ###-#### Inspection requested via web by Mike Koci ok to place concrete after spec inspection sign offs
|
BLD-Footing | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PASS |
Dave Hannah
|
|
|
Footing inspection at Gridline 1 and 3 along gridline H. The southeast section of the building. Please call Mike when in route. Thanks! Phone #: ###-#### Inspection requested via web by Mike Koci
|
BLD-Footing | 9/27/2019 | 9/30/2019 | 10/1/2019 | P | PASS |
Dave Hannah
|
|
|
Inspection for Tower crane mat footing - please call Mike when headed to the site. Thanks! Phone #: ###-#### Inspection requested via web by Mike Koci
|
BLD-Footing | 9/20/2019 | 9/25/2019 | 9/25/2019 | A | PEND |
Dave Hannah
|
|
|
For the core footing Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Footing | 9/19/2019 | 9/23/2019 | 9/24/2019 | A | PART |
Dave Hannah
|
|
|
Inspection of crane footing. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Footing | 9/20/2019 | 9/24/2019 | 9/24/2019 | A | PART |
Dave Hannah
|
|
|
spread footings on grids 9, 10 ; 11, from A to H Phone #: ###-#### Inspection requested via web by Andy Pense
|
Issue PAID IN FULL permit | | | 8/29/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 8/26/2019 | | |
|
|
|
|
Plan assigned to (JHB) | 6/25/2019 | 6/25/2019 | 8/26/2019 | | PASS |
Joe Bruce
|
|
|
08/19 (3rd Rev) 07/08 (502) 11th & Idaho - Foundation/Super Structure - **Project Managment Ron Hill**
|
Routing PW Drainage | 8/12/2019 | | 8/26/2019 | | PASS |
Brian Murphy
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/26/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/26/2019 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 8/12/2019 | | 8/15/2019 | | PASS |
Joe Bruce
|
|
|
Received Easement for footings from ACHD - Signed/Recorded.
|
Routing Off Site - STRUCTURAL | 8/12/2019 | | 8/14/2019 | | PASS |
Joe Bruce
|
|
|
Jacobs
|
Plan resubmittals received | | | 8/12/2019 | | DONE |
Joe Bruce
|
|
|
Received structural revisions. Will upload ACHD license agreement and letter for stormwater drainage from ACHD for approval. **JHB**
|
Plan resubmittals received | | | 8/2/2019 | | FAIL |
Joe Bruce
|
|
|
Sent resubmit/upload task back to Devin per email request.
|
Routing - FIRE | 7/25/2019 | 7/25/2019 | 8/1/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan resubmittals requested | | | 8/1/2019 | | DONE |
Joe Bruce
|
|
|
Sent email to applicant.
|
Routing - PLAN CHECK | 7/25/2019 | | 7/31/2019 | | FAIL |
Joe Bruce
|
|
|
Need a formal letter from ACHD regarding the license agreement for footings in the ROW.
|
Routing Off Site - STRUCTURAL | 7/25/2019 | | 7/31/2019 | | FAIL |
Joe Bruce
|
|
|
Jacobs Engineering
|
Routing - Design Review | 7/25/2019 | | 7/29/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLUMBING | 7/25/2019 | | 7/26/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC
|
Routing PW Sewer Design | 7/25/2019 | | 7/26/2019 | | PASS |
DeAnn Brown
|
|
|
|
Routing - PLANNING | 7/26/2019 | | 7/26/2019 | | PASS |
Sue Cummings
|
|
|
|
Plan resubmittals received | | | 7/25/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 7/24/2019 | | FAIL |
Joe Bruce
|
|
|
Resubmitted drawings had the following items that need to be corrected:
1) The newly submitted electrical and plumbing drawings have a 4”x2” space for the city approval stamp, however the engineer has place their stamp in this box. The stamping area needs to be kept clear for the city approval stamp.
2) There are no revised structural drawings uploaded.
3) There are no supplemental structural calculations uploaded.
4) Sheet G01-05 was not named the same as the previous file and did not version. There are (2) two G01-05 drawings in this folder.
|
Route to Impact Fee Review | 7/16/2019 | 7/19/2019 | 7/17/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 6/25/2019 | 6/25/2019 | 7/16/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing Off Site - STRUCTURAL | 6/25/2019 | | 7/16/2019 | | FAIL |
Joe Bruce
|
|
|
Jacobs Engineering
|
1st review completed | | | 7/16/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 7/16/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 6/25/2019 | | 7/10/2019 | | FAIL |
Joe Bruce
|
|
|
Spoke with Devin regarding plan review report and emailed him a copy. **JHB**
|
Routing PW Solid Waste | 6/25/2019 | | 7/2/2019 | | PASS |
Peter J. McCullough
|
|
|
Letter stating that owner is responsible for moving dumpsters to acessible location to be kept with file.
|
Routing PW Environmental | 6/25/2019 | | 7/2/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLANNING | 6/25/2019 | | 6/26/2019 | | PASS |
Karla Nelson
|
|
|
Meets all current planning standards. Compliance with DR conditions of approval is required.
|
Routing - Addressing | 6/21/2019 | | 6/26/2019 | | PASS |
Doug Chausow
|
|
|
They would like a new address assigned. New address is: 1104 W Idaho St
|
Intake Approval | | | 6/25/2019 | | PASS |
|
|
|
|
Routing - PLUMBING | 6/25/2019 | | 6/25/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 6/25/2019 | | 6/25/2019 | | FAIL |
Andrea Tuning
|
|
|
The proposed streetscape plan does not match what was reviewed or approved through the Design Review application. The applicant should utilize the urban concrete streetscape detail.
The pedestrian crossings do not provide the required 10-foot throat.
There is a trash receptacle and large mechanical area proposed in the northwest corner of the site. Trash was requried to be located internally to the building and the pedestrian walkway on the west side of the building was required to be unobstructed. This was also required to obtain floor area ratio for the building.
Widen the overhead door opening on the west elevation from the refuse room to be a minimum of 10-feet wide.
|
Routing - PUBLIC WORKS | 6/25/2019 | | 6/25/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/25/2019 | | 6/25/2019 | | PASS |
Michael Zawacki
|
|
|
RP needed.
Site prep inspection required.
|
Routing PW Street Lights | 6/25/2019 | | 6/25/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 6/25/2019 | | 6/25/2019 | | PASS |
DeAnn Brown
|
|
|
|
Intake Approval | | | 6/24/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following for the approval of the Prescreem:
1. Verify the Snow Load in the structural calculations.
2. Only the Cover Sheet for Planning and Zoning Letters of Approval was uploaded into Documents. Please provide the others. (Two of the Specified Dcuments are on a large sheet in the Drawing File).
3. G00-01 is not stamped and signed.
|
Application received | | | 6/7/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 7 2019 10:57AM
|
Routing PW Drainage | 6/25/2019 | | | | FAIL |
Brian Murphy
|
|
|
need achd letter plus stra report and stustural report
|
Routing PW Drainage | 7/25/2019 | | | | FAIL |
Brian Murphy
|
|
|
NEED ACHD OK
|