BLD-Final | 7/28/2020 | 7/29/2020 | 7/29/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Bruno
|
BLD-Blower Door Test Results | 7/29/2020 | 7/29/2020 | 7/29/2020 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.2
|
BLD-Aging Inspection | 7/29/2020 | 7/29/2020 | 7/29/2020 | | DEFR |
Brandon Shaw
|
|
|
|
PubWorks Occupancy Approval | 7/16/2020 | 7/16/2020 | 7/16/2020 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
|
BLD-Energy code compliance | 3/16/2020 | 3/17/2020 | 3/17/2020 | A | PASS |
Jim Storey
|
|
|
Please call Robert at ###-#### prior to inspection. Thanks. Phone #: ###-#### Inspection requested via web by Robert Bruno
|
BLD-Framing/Rough-in | 3/10/2020 | 3/11/2020 | 3/11/2020 | P | PEND |
Brandon Shaw
|
|
|
See PLM19-04214... R/I pass, Roof drains are undersized. Need to be 3" & tested. Framing rough-in ok to insulate, leave roof drains uncovered until plumbing rough-in has approved cover...
|
BLD-Conference | 3/4/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Brandon Shaw
|
|
|
Stevie Phone #: ###-####
|
BLD-Wall Bracing | 2/24/2020 | 2/25/2020 | 2/25/2020 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Bruno
|
BLD-Other | 2/18/2020 | 2/19/2020 | 2/19/2020 | A | PASS |
Tony Young
|
|
|
Please call Robert before so he can meet you. ###-#### Phone #: ###-#### Inspection requested via web by Robert Bruno// soffit base layer of fire rated plywood ok
|
BLD-Foundation | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Brandon Shaw
|
|
|
Ready for 1st thing inspection Phone #: ###-#### Inspection requested via web by Ben Sears
|
OVERRIDE | | | 1/2/2020 | | |
|
|
|
|
Plan assigned to (J_N) | 11/19/2019 | 11/19/2019 | 1/2/2020 | | DONE |
Jenny Nelson
|
|
|
Failed hillside. RDP plan mod
|
CHANGE STATUS TO (ISS) | | | 1/2/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/2/2020 | | DONE |
|
|
|
plan mod approved
|
Routing PW Grading-Hillside | 12/31/2019 | | 12/31/2019 | | PASS |
Melissa Jannusch
|
|
|
PLAN MOD APPROVED A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Routing PW Grading-Hillside | 12/27/2019 | | 12/27/2019 | | FAIL |
Melissa Jannusch
|
|
|
See changemarks in eplan
|
Routing PW Grading-Hillside | 11/19/2019 | | 11/27/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Routing - PLANNING | 11/25/2019 | | 11/25/2019 | | PASS |
Karla Nelson
|
|
|
|
Routing - PLAN CHECK | 11/19/2019 | | 11/22/2019 | | PASS |
Jenny Nelson
|
|
|
plan mod
|
Routing - PLANNING | 11/19/2019 | | 11/20/2019 | | PASS |
Sue Cummings
|
|
|
plan mod. Sue sent this to Karla
|
Plan assigned to (RDP) | 11/8/2019 | 11/8/2019 | 11/19/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing - PUBLIC WORKS | 11/19/2019 | | 11/19/2019 | | PASS |
Candy A. Nichols
|
|
|
plan mod
|
Plan Modification Accepted | | | 11/8/2019 | | DONE |
|
|
|
Jean Garman from Brunobuilt, inc requested a plan mod. The modification is to change the straight retaining wall to include a 3 foot jog to create the planter. The planter will be 30 feet wide at center of wall. The engineer of record has already approved the design as likely being stronger than current design. We are ready to upload documents. Time is of the essence on this project.
|
BLD-Foundation | 11/4/2019 | 11/5/2019 | 11/5/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Ben Sears
|
BLD-Footing | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Brandon Shaw
|
|
|
Back retaining wall...
|
BLD-Foundation | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Foundation | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Foundation | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Brandon Shaw
|
|
|
South West retaining wall and driveway rertaing walls...
|
BLD-Footing | 9/2/2019 | 9/3/2019 | 9/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
PubWorks Subgrade Approval | 8/21/2019 | 8/21/2019 | 8/21/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
Issue PAID IN FULL permit | | | 7/24/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/24/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/18/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 7/18/2019 | | DONE |
|
|
|
MET
|
Plan assigned to (RDP) | 6/12/2019 | 6/12/2019 | 7/17/2019 | | DONE |
Rob Patrick
|
|
|
07/01 sfd L2 ePlan...07/01 Failed; Sheet A-5.1 requires signature on stamp.
|
Routing - PLAN CHECK | 7/17/2019 | | 7/17/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing PW Grading-Hillside | 7/16/2019 | | 7/16/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Plan Reviewer's activity | | | 7/8/2019 | | |
Rob Patrick
|
|
|
Ready to go if Melissa Passes it.
|
Routing - PLANNING | 7/8/2019 | | 7/8/2019 | | PASS |
Karla Nelson
|
|
|
Looks ok, the back wall is just over 6', the measurement is just outside of the 10' side setback. The wall can be no higher than 6' in the side yard setback.
|
1st review completed | | | 7/1/2019 | | FAIL |
Rob Patrick
|
|
|
Sheet A-5.1 requires signature on stamp.
|
Routing - PLAN CHECK | 6/12/2019 | | 7/1/2019 | | FAIL |
Rob Patrick
|
|
|
Sheet A-5.1 requires signature on stamp.
|
Routing PW Grading-Hillside | 6/13/2019 | | 6/25/2019 | | FAIL |
Melissa Jannusch
|
|
|
see changemarks in ePlan
|
Route to Impact Fee Review | 6/12/2019 | 6/15/2019 | 6/13/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/12/2019 | 6/12/2019 | 6/13/2019 | | PASS |
Lee G Meredith
|
|
|
06/26-2313 S Via Privada Ln 404 eplan
Sprinklers not required.
|
Routing - Erosion and Sediment | 6/12/2019 | | 6/13/2019 | | PASS |
Michael Zawacki
|
|
|
Site prep inspection required.
Extra precaution needed to prevent dirt from entering rock drainage in rear of lot.
|
Routing - PUBLIC WORKS | 6/12/2019 | | 6/13/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - MECHANICAL | 6/12/2019 | | 6/13/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/12/2019 | | 6/13/2019 | | FAIL |
Karla Nelson
|
|
|
Wall cannot exceed 3' in 20' front yard setback. Patio encroaching into front yard cannot exceed 1' in height.
|
Routing - Addressing | 6/12/2019 | | 6/12/2019 | | PASS |
Doug Chausow
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/12/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/12/2019 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 6/12/2019 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/12/2019 | | DONE |
|
|
|
|
Application received | | | 6/10/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 10 2019 5:05PM
|