Permit Information
Permit NumberBLD19-02151
StatusFinaled
Name SCOTT HEDRICK CONSTRUCTION
Site Address 7200 W BARRISTER DR
Project NameADA Sheriff Evidence Expansion
Customer Number 
ePlanReviewYes
Description
(ADA COUNTY SHERIFF - FREEZER / COOLER) Special inspections are required, see form #310 for details. Permit for the construction of a new standalone exterior cooler / freezer 16'-0 x 16'-0" x 9'-0". Work to include: remove approximately 1000 s.f. asphalt and about 500 s.f. grass area, new 4” concrete slab, (2) new condensing units, (1) new diesel generator, electrical work exterior and in basement of main building, plumbing work, and mechanical work, new metal landing and ramp for means of egress per sketch. Structural engineering has been provided. Approval is contingent on adhering to the approved plans, engineering, local codes and ordinances. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  5/7/2020 DONE
2nd notice
Print Statement  4/3/2020 DONE
1st notice
Print Statement  2/20/2020 DONE
First Notice 1/3/20202/7/2020 DONE
mailed 2-10-20
BLD-Final12/23/201912/24/201912/24/2019APASS
DetailsMike Jordan
Mike- PLEASE CALL 30 MIN PRIOR FOR SECURITY ACCESS Phone #: ###-####
Print Occupancy Form  12/24/2019 DONE
Permanent Occupancy  12/24/2019 DONE
CHANGE STATUS TO (ISS)  12/23/2019 DONE
this permit was on Final Status but there was no inspection showing that the Final was done, put back in ISS status and schedule the final inspection
Plan Reviewer's activity  12/16/2019 DONE
DetailsMichael Hanson
Removed plumbing from the required signatures.
FIRE-Final Inspection12/11/201912/12/201912/12/2019APASS
DetailsTroy Cobbley
Life safety passed.Mike Phone #: ###-####
Meeting  10/9/2019 DONE
per Michael Hansen okay to open task on Eplan for client to upload sketch not a plan mod
Plan Reviewer's activity  10/9/2019 DONE
DetailsMichael Hanson
Met with applicant to discuss the landings and ramps for access to the freezer/refrigerator. We developed a sketch which I have approved as code compliant means of egress. Applicant will upload to eplan and add to the approved drawing set.
BLD-Foundation10/2/201910/2/201910/2/2019PPASS
DetailsMike Jordan
Please call ahead so I can meet Inspector in parking lot and escort back to site inside the compound at West gate. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band. Ok to proceed. Architect/engineer of record to provide letter stating they are accepting the in place work for the conrete anchors.
BLD-Foundation10/1/201910/2/201910/2/2019APEND
DetailsMike Jordan
Inspection is for anchoring new cooler to slab. Project is at Ada County Sheriffs compound on Barrister, just inside the automated gate at the West end of parking lot. I have a project meeting this morning in adjacent County office, from 8:45 to 9:45. Hopefully we could have Inspection before, or soon after meeting, so work for the day can proceed.
I can meet Inspector in parking lot, and escort him into the site.
Thank you. Phone #: ###-#### Inspection requested via web by Gary Band. Anchors have been installed with no special inspection. Engineer of record to accept in place work or determine next steps.
BLD-Foundation10/1/201910/1/201910/1/2019ACANC
DetailsMike Jordan
Mike any chance we could get this early so we can proceed today?
Work is inside the west gate w/ intercom @ elect gate Phone #: ###-#### >> Inspection requested via web by Gary Band Inspection cancelled from web by: Gary Band
OVERRIDE  9/26/2019  
Issue PAID IN FULL permit  9/26/2019 DONE
Print Occupancy Form  9/26/2019 DONE
Print Occupancy Form  9/26/2019 DONE
Plan assigned to (M_H)8/6/2019 9/26/2019 DONE
DetailsMichael Hanson
1st review completed - 09/16 #502 L3 ePlan - Sheriff Cooler/Freezer
Routing - PLAN CHECK9/26/2019 9/26/2019 PASS
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  9/26/2019 DONE
DetailsMichael Hanson
Routing - Erosion and Sediment9/26/2019 9/26/2019 PASS
DetailsAndy J. Long
ESC plan waiver approved. Need to list certified RP
Permit Ready to Issue  9/26/2019 DONE
Need
ACHD
GC Form
Revised Cert of Value

Met
RP
Route to Impact Fee Review9/16/20199/19/20199/23/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE8/6/20198/6/20199/23/2019 PASS
DetailsErika Akin
No comments attached. Standalone freezer and diesel generator installed outside. Inspector to field verify fire extinguisher within 75 foot travel distance.
1st review completed  9/16/2019 DONE
DetailsMichael Hanson
Routing - PLAN CHECK8/6/2019 9/16/2019 FAIL
DetailsMichael Hanson
See changemarks in ePlan for corrections required.
Routing PW Drainage8/7/2019 8/21/2019 PASS
DetailsBrian Murphy
existing system see erosion letterand arch.
Routing PW Environmental8/7/2019 8/14/2019 PASS
DetailsRick Christenson
Routing - MECHANICAL8/6/2019 8/12/2019 PASS
DetailsTroy James
Field verify for code compliance.
Routing - PLANNING8/6/2019 8/8/2019 PASS
DetailsKarla Nelson
CZC19-00169
Routing - PUBLIC WORKS8/6/2019 8/7/2019 PASS
DetailsAngela Hardy
Intake Approval  8/6/2019 PASS
Routing - Design Review8/6/2019 8/6/2019 PASS
DetailsKatelyn Menuge
CZC19-00169
Routing - Addressing8/6/2019 8/6/2019 PASS
DetailsDoug Chausow
Intake Approval  8/5/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
Thank you for the uploaded cooler design plans but the cooler plans are required per the checklist submittal standards to be a minimum 18” x 24” sheet size, required per the ePlan submittal standards to be uploaded as an individual file not as a packet, required per the ePlan submittal standards to have a file naming standard to allow reviewing department know what the file is, and required per the ePlan submittal standards to reserve the bottom right corner for City electronic stamps. (Leave a blank 4” x 2” space located 3” off the right sheet edge to allow for the title block.)
To view the ePlan submittal standards go to https://www.cityofboise.org/media/7025/electronic_submittal_standards.pdf
Intake Approval  6/21/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
1. The engineering calculations are required prior to commencement of review to verify properly sized footing/foundation and reinforcement per design since the majority of the project work hinges on the concrete work the calculations are required. Provide structural calculations for wind, seismic and roof snow loading for the new cooler/freezer structure, calculations required to be stamped/signed/dated by an Idaho licensed engineer.
Application received  6/11/2019 DONE
Application submitted via PDS Online on Jun 11 2019 6:45AM
Intake Approval  6/11/2019 FAIL
DetailsJavier Guzman
Provide and upload the following:
1. Site specific fire flow at hydrants letter from Suez Water or other public water provider
2. Provide structural calculations for wind, seismic and roof snow loading for the new structure, calculations required to be stamped/signed/dated by an Idaho licensed engineer
3. Verification of Legal Lot or Parcel form signed and approved by PDS Subdivision Staff, form can be found at https://www.cityofboise.org/media/3756/211_verificationlegallot_application.pdf
4. A completed Special Inspection form 310 (see proposed anchor ESR report) stamped/signed/dated by an Idaho licensed engineer
5. Provide information as to what is being stored in the Cooler/Freezer, if food an approved provide Central District Health Department approvals (see checklist)
6. Code Analysis/Building Data on front sheet of plans which includes: Code year, occupancy group(s), construction type(s), floor areas for all floors & building total floor area, building height, fire suppression system (specify NFPA code applicable)
7. Generator specs
8. Cooler/Freezer specs to verify it meets the requirements of the 2015 IECC section 403.2.16