Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD19-02167
StatusFinaled
Name AN NGUYEN
Site Address 3365 S FEDERAL WAY
Project NameCrystal Body Works Spa
Customer Number 
ePlanReviewYes
Description
**PLAN MOD #2 PUT THE WASHER AND DRYER (ventless dryer) BACK IN THE PROJECT, PLUMBING AND DUCTING ADDED BACK** 11/15/2019 MDH **PLAN MOD TO REMOVE WASHER AND DRYER FROM PROJECT, PLUMBING AND DUCTING REMOVED. MDH** (CRYSTAL BODY WORKS SPA) Permit to remodel an existing 1,093 sqft. tenant space within a 6,875 sqft. total building area. Work to include: demo non-bearing interior walls, construct new non-bearing interior walls to create 5 massage rooms, 1 check-in area, 1 office, minor electrical / mechanical work, plumbing work includes new water heater / service sink and washer box. This building is not fire sprinkled. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/12/20207/8/2020 DONE
mailed 7-9-2020 with 3rd & final follow up
Third Follow up  7/8/2020 DONE
fianl
Third Notice 4/8/20205/7/2020 DONE
mailed 5-8-2020 with second follow up
Second Follow up  5/7/2020 DONE
Third Notice 3/10/20204/3/2020 DONE
mailed 4-6-20 with first follow up letter
First Follow up  4/3/2020 DONE
Third Notice 2/11/20203/5/2020 DONE
mailed 3-6-20
Third Notice 1/4/20202/6/2020 DONE
mailed 2-7-20
Second Notice 12/5/201912/30/2019 DONE
mailed 1-1-20
First Notice 11/25/201911/25/2019 DONE
mailed 12-2-19
BLD-Final11/15/201911/15/201911/15/2019PPASS
DetailsMike Jordan
An Phone #: ###-####
Permanent Occupancy  11/15/2019 DONE
Plan assigned to (M_H)11/13/2019 11/15/2019 DONE
DetailsMichael Hanson
2nd plan mod
Routing - PLAN CHECK11/15/2019 11/15/2019 PASS
DetailsMichael Hanson
1 hour plan mode review fee
Permit Ready to Issue  11/15/2019 DONE
DO NOT ISS- plan mod approved
Print Occupancy Form  11/15/2019 DONE
CHANGE STATUS TO (ISS)  11/15/2019 DONE
CHANGE STATUS TO (ISS)  11/13/2019 DONE
Plan Modification Accepted  11/13/2019 DONE
Glenn Walker from ADP Architects requested a plan mod - adding a dryer vent. Sheets A2.0 and P-1.1
Permit Ready to Issue  11/6/2019 DONE
DO NOT REISSUE- plan mod approved
Route to Impact Fee Review11/4/201911/7/201911/5/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (M_H)11/4/2019 11/5/2019 DONE
DetailsMichael Hanson
11/08 Plan Mod - Removed W/D box
Routing - PLAN CHECK11/5/2019 11/5/2019 PASS
DetailsMichael Hanson
Plan mod review - 1 hour review fee
Plan Modification Accepted  11/4/2019 DONE
plan mod submitted by Glen Walker, ADP Architects. Tenant did not install the washer and dryer. Sheet A2.0
BLD-Final11/1/201911/1/201911/1/2019PPART
DetailsJim Storey
Call ahead // An Phone #: ###-#### ele water heater// dryer not vented need mech/ counter not in place.
BLD-Final10/28/201910/29/201910/29/2019PDEFR
DetailsBrandon Shaw
Conference...
FIRE-Final Inspection10/28/201910/29/201910/29/2019APASS
DetailsJim Page
No fire sprinklers, no fire alarms, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.

call when on the way // An Phone #: ###-####
BLD-Wall Bracing8/26/20198/26/20198/26/2019PPASS
DetailsBrandon Shaw
OK to cover...
BLD-Wall Bracing8/20/20198/20/20198/20/2019PFAIL
DetailsBrandon Shaw
Per approved plans- Walls 1A and 2A to be in proper locations with approved wall heights.
See Wall bracing detail...
Remove screws from top track, to T-bar bracing...
Print Occupancy Form  7/29/2019 DONE
Issue PAID IN FULL permit  7/29/2019 DONE
Plan assigned to (M_H)6/13/2019 6/28/2019 DONE
DetailsMichael Hanson
07/02 #518 L2 ePlan - Crystal Body Spa
Routing - PLAN CHECK6/13/2019 6/28/2019 PASS
DetailsMichael Hanson
1st review completed  6/28/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  6/28/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  6/28/2019 DONE
MET-Need
GC Form
MET
Revised Value
7-9-19 emailed Glenn Walder the fees due
Routing - PLUMBING6/13/2019 6/17/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PUBLIC WORKS6/13/2019 6/14/2019 PASS
DetailsAngela Hardy
Routing - Addressing6/13/2019 6/14/2019 PASS
DetailsDoug Chausow
Intake Approval  6/13/2019 PASS
DetailsMichael Hanson
Prescreen approved by M_H
Application received  6/11/2019 DONE
Application submitted via PDS Online on Jun 11 2019 12:52PM
Third Notice 7/13/2020