Third Notice | | 5/12/2020 | 7/8/2020 | | DONE |
|
|
|
mailed 7-9-2020 with 3rd & final follow up
|
Third Follow up | | | 7/8/2020 | | DONE |
|
|
|
fianl
|
Third Notice | | 4/8/2020 | 5/7/2020 | | DONE |
|
|
|
mailed 5-8-2020 with second follow up
|
Second Follow up | | | 5/7/2020 | | DONE |
|
|
|
|
Third Notice | | 3/10/2020 | 4/3/2020 | | DONE |
|
|
|
mailed 4-6-20 with first follow up letter
|
First Follow up | | | 4/3/2020 | | DONE |
|
|
|
|
Third Notice | | 2/11/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Third Notice | | 1/4/2020 | 2/6/2020 | | DONE |
|
|
|
mailed 2-7-20
|
Second Notice | | 12/5/2019 | 12/30/2019 | | DONE |
|
|
|
mailed 1-1-20
|
First Notice | | 11/25/2019 | 11/25/2019 | | DONE |
|
|
|
mailed 12-2-19
|
BLD-Final | 11/15/2019 | 11/15/2019 | 11/15/2019 | P | PASS |
Mike Jordan
|
|
|
An Phone #: ###-####
|
Permanent Occupancy | | | 11/15/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 11/13/2019 | | 11/15/2019 | | DONE |
Michael Hanson
|
|
|
2nd plan mod
|
Routing - PLAN CHECK | 11/15/2019 | | 11/15/2019 | | PASS |
Michael Hanson
|
|
|
1 hour plan mode review fee
|
Permit Ready to Issue | | | 11/15/2019 | | DONE |
|
|
|
DO NOT ISS- plan mod approved
|
Print Occupancy Form | | | 11/15/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/15/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/13/2019 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/13/2019 | | DONE |
|
|
|
Glenn Walker from ADP Architects requested a plan mod - adding a dryer vent. Sheets A2.0 and P-1.1
|
Permit Ready to Issue | | | 11/6/2019 | | DONE |
|
|
|
DO NOT REISSUE- plan mod approved
|
Route to Impact Fee Review | 11/4/2019 | 11/7/2019 | 11/5/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan assigned to (M_H) | 11/4/2019 | | 11/5/2019 | | DONE |
Michael Hanson
|
|
|
11/08 Plan Mod - Removed W/D box
|
Routing - PLAN CHECK | 11/5/2019 | | 11/5/2019 | | PASS |
Michael Hanson
|
|
|
Plan mod review - 1 hour review fee
|
Plan Modification Accepted | | | 11/4/2019 | | DONE |
|
|
|
plan mod submitted by Glen Walker, ADP Architects. Tenant did not install the washer and dryer. Sheet A2.0
|
BLD-Final | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PART |
Jim Storey
|
|
|
Call ahead // An Phone #: ###-#### ele water heater// dryer not vented need mech/ counter not in place.
|
BLD-Final | 10/28/2019 | 10/29/2019 | 10/29/2019 | P | DEFR |
Brandon Shaw
|
|
|
Conference...
|
FIRE-Final Inspection | 10/28/2019 | 10/29/2019 | 10/29/2019 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area of work complete.
call when on the way // An Phone #: ###-####
|
BLD-Wall Bracing | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to cover...
|
BLD-Wall Bracing | 8/20/2019 | 8/20/2019 | 8/20/2019 | P | FAIL |
Brandon Shaw
|
|
|
Per approved plans- Walls 1A and 2A to be in proper locations with approved wall heights. See Wall bracing detail... Remove screws from top track, to T-bar bracing...
|
Print Occupancy Form | | | 7/29/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/29/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 6/13/2019 | | 6/28/2019 | | DONE |
Michael Hanson
|
|
|
07/02 #518 L2 ePlan - Crystal Body Spa
|
Routing - PLAN CHECK | 6/13/2019 | | 6/28/2019 | | PASS |
Michael Hanson
|
|
|
|
1st review completed | | | 6/28/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
MET-Need
GC Form
MET
Revised Value
7-9-19 emailed Glenn Walder the fees due
|
Routing - PLUMBING | 6/13/2019 | | 6/17/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 6/13/2019 | | 6/14/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Addressing | 6/13/2019 | | 6/14/2019 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 6/13/2019 | | PASS |
Michael Hanson
|
|
|
Prescreen approved by M_H
|
Application received | | | 6/11/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 11 2019 12:52PM
|
Third Notice | | 7/13/2020 | | | |
|
|
|
|