Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD19-02176
StatusFinaled
Name TRESIDIO HOMES
Site Address 1870 S KIMBALL PL
Project NameMC 18-1
Customer Number 
ePlanReviewYes
Description
**PRESCRIPTIVE ENERGY REQUIREMENTS** Permit for the construction of a new 3385 sq. ft., two story (first story 2642 sq. ft., second story 743 sq. ft.) single family dwelling with 4 bedrooms, 4.5 bathrooms, approximately 223 sq. ft. of covered patio/porch and a 917 sq. ft. attached garage per the approved plans and any notations. R-1C/DA zoning and setbacks per planning. JJN
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/4/201912/5/201912/5/2019APASS
DetailsMike Jordan
call for garage access code // Anthony Phone #: ###-####
DOC - Permit Finaled12/5/201912/5/201912/5/2019PPASS
DetailsMike Jordan
BLD-Ceiling Grid Inspection9/5/20199/6/20199/6/2019ACANC
DetailsMike Jordan
Anthony Phone #: ###-####
BLD-Energy code compliance9/6/20199/6/20199/6/2019APASS
DetailsMike Jordan
Anthony Phone #: ###-####. Majority of framing issues were resolved. A letter from the engineer of record is required noting that the rear portal frame header is sufficient prior to issuing a cert. of occupancy.
BLD-Framing/Rough-in9/5/20199/6/20199/6/2019APASS
DetailsMike Jordan
Anthony Phone #: ###-####
BLD-Framing/Rough-in9/3/20199/4/20199/4/2019PFAIL
DetailsMike Jordan
Anthony Phone #: ###-####. Add double 2x6 header over doorway by main entry. Add aditional stud under beam, east wall. Replace the cut LIB in master bath. Justify the header for Single portal frame in master bedroom. Ok to insulate.
BLD-Wall Bracing8/9/20198/12/20198/12/2019APASS
DetailsMike Jordan
Anthony Phone #: ###-####
BLD-Foundation7/18/20197/18/20197/18/2019PPASS
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing7/16/20197/17/20197/17/2019APART
DetailsMike Jordan
Ricardo Phone #: ###-####
Issue PAID IN FULL permit  7/11/2019 DONE
emailed both dallin@tresidio.com; katie@tresidio.com to sign and send back attached building and esc permits
Inspection Record Card- Bld  7/11/2019 DONE
OVERRIDE  6/25/2019  
Plan assigned to (J_N)6/13/20196/13/20196/25/2019 DONE
DetailsJenny Nelson
06/26 sfd L1 ePlan
Routing - PLAN CHECK6/13/2019 6/25/2019 PASS
DetailsJenny Nelson
1st review completed  6/25/2019 DONE
DetailsJenny Nelson
PLANS/APPL TAKEN TO FRONT DESK  6/25/2019 DONE
DetailsJenny Nelson
Permit Ready to Issue  6/25/2019 DONE
Route to Impact Fee Review6/13/20196/16/20196/14/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - Addressing6/13/2019 6/14/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/13/2019 6/14/2019 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  6/13/2019 DONE
Intake Approval  6/13/2019 PASS
Recd Pcfee & Taken To Pln CK  6/13/2019 DONE
Routing - MECHANICAL6/13/2019 6/13/2019 PASS
DetailsTroy James
Routing - PLANNING6/13/2019 6/13/2019 PASS
DetailsJeff Lowe
Application received  6/11/2019 DONE
Application submitted via PDS Online on Jun 11 2019 4:39PM