Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-02193
StatusFinaled
Name BLACKROCK HOMES LLC
Site Address 2576 E WARM SPRINGS AVE
Project Name38-1 WSV1
Customer NumberGATE CITY
ePlanReviewYes
Description
***W.U.I. FOOTHILLS ZONE A; CLASS "A" ROOF AND NON-COMBUSTIBLE CONSTRUCTION REQUIRED*** Permit for the construction of a new 2481 sq. ft., two story (first story 1679 sq. ft., second story 802 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 333 sq. ft. of covered patio/porch and a 555 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. R-1C zoning and setbacks per planning.***RDP*** ***SPRINKLERS ARE NOT REQUIRED*** LGM A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/25/20202/26/20202/26/2020APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
DOC - Permit Finaled2/26/20202/26/20202/26/2020PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results2/21/20202/25/20202/25/2020ADONE
DetailsBrandon Shaw
ACH50- 4.6
BLD-Final2/21/20202/25/20202/25/2020ANR
DetailsBrandon Shaw
Need Ele final...
BLD-Energy code compliance12/12/201912/18/201912/18/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in12/16/201912/17/201912/17/2019APASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Framing/Rough-in12/12/201912/16/201912/16/2019APART
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Clint Wall ok to insulate but c/n on site truss bracing
BLD-Wall Bracing11/20/201911/20/201911/20/2019PPASS
DetailsBrandon Shaw
Eder Phone #: ###-####
BLD-Foundation7/31/20198/1/20198/1/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing7/25/20197/26/20197/26/2019APASS
DetailsDave Hannah
victor Phone #: ###-####
PubWorks Subgrade Approval7/24/20197/24/20197/24/2019 DONE
DetailsMelissa Jannusch
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.

Issue PAID IN FULL permit  7/15/2019 DONE
Inspection Record Card- Bld  7/15/2019 DONE
OVERRIDE  6/24/2019  
Plan assigned to (RDP)6/12/20196/12/20196/24/2019 DONE
DetailsRob Patrick
06/25 sfd L1 ePlan
Routing - PLAN CHECK6/12/2019 6/24/2019 PASS
DetailsRob Patrick
1st review completed  6/24/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  6/24/2019 DONE
DetailsRob Patrick
Override - Parcel Holds  6/24/2019  
Permit Ready to Issue  6/24/2019 DONE
Route to Impact Fee Review6/12/20196/15/20196/13/2019 PASS
DetailsShannon Cade
Initial residential review of new SFD permits requested for now.
Routing - FIRE6/12/20196/12/20196/13/2019 PASS
DetailsLee G Meredith
06/26 2576 E Warm Springs 402 Res ePlan

Sprinklers are not required.
Routing - MECHANICAL6/12/2019 6/13/2019 PASS
DetailsChad Schwendiman
Routing - PLANNING6/12/2019 6/13/2019 PASS
DetailsSue Cummings
Routing - Addressing6/12/2019 6/13/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/12/2019 6/13/2019 PASS
DetailsMorgan Webb
Application received  6/12/2019 DONE
Application submitted via PDS Online on Jun 12 2019 1:56PM
Plans ACCEPTED BY PLAN TECH  6/12/2019 DONE
Intake Approval  6/12/2019 PASS
Override - Parcel Holds  6/12/2019  
Recd Pcfee & Taken To Pln CK  6/12/2019 DONE