Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02201
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 190 E BANNOCK ST
Project NameSt. Lukes new CT machine
Customer Number 
ePlanReviewYes
Description
(ST. LUKE'S - CT MACHINE REPLACEMENTS) Special inspections are required see #310 form for details. This building is fully fire sprinkled due to occupancy type and high rise requirements. Certificate of compliance will be issued upon completion. Permit to remodel an existing 444 sq.ft. CT machine room. Work to include: removal of old CT machine and associated equipment, new CT machine and associated equipment, new boom mounted to the ceiling per structural engineering, new flooring, new wall finish, new cabinetry, minor mechanical, and minor electrical. All new interior finish shall meet 2015 IBC chapter 8 requirements. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Structural engineering has been provided. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  7/29/2020 DONE
DetailsMichael Hanson
Removed the mechanical inspection requirement per Curtis Weedop with St. Lukes.
Letter of compliance/Occupancy  7/29/2020 DONE
BLD-Final7/22/20207/22/20207/22/2020PPASS
DetailsJim Storey
Kelly *screened* Phone #: ###-####
DOC - Permit Finaled7/22/20207/22/20207/22/2020PPASS
DetailsJim Storey
FIRE-Final Inspection7/22/20207/22/20207/22/2020PPASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Kelly *screened* Phone #: ###-####
Issue PAID IN FULL permit  9/4/2019 DONE
Inspection Record Card- Bld  9/4/2019 DONE
Telephone call  8/22/2019 DONE
MET

emailed Dana@insightarchitects.com that we still need the GC and rev cert of val so we can add the remainder of the fees before the permit can be issued
Routing - FIRE7/31/20197/31/20198/21/2019 PASS
DetailsMark Scharfen
08/21-St. Luke's CT Replacement IFC review complete. Uploaded rev_fire 08.21.2019.pdf
1st review completed  8/21/2019 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  8/21/2019 DONE
DetailsMichael Hanson
Permit Ready to Issue  8/21/2019 DONE
all met: Dana@insightarchitects.com

Need GC
Need Rev Val
Plan assigned to (M_H)7/31/2019 8/21/2019 DONE
DetailsMichael Hanson
08/21 #520 L3 ePlan - St. Lukes CT
Routing - PLAN CHECK7/31/2019 8/20/2019 PASS
DetailsMichael Hanson
Routing - MECHANICAL7/31/2019 8/5/2019 PASS
DetailsTroy James
Routing - Addressing7/31/2019 7/31/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS7/31/2019 7/31/2019 PASS
DetailsAngela Hardy
Intake Approval  7/25/2019 PASS
Plan Reviewer's activity  6/17/2019  
To be routed as a 520 major T.I. due to it's location in a I occupancy. Fire flow on file.
Intake Approval  6/14/2019 FAIL
DetailsMichael Hanson
This permit will be routed as a 520 major T.I. due to it's location in a I occupancy. Please provide the 520 checklist and the additional documentation denoted in the 520 checklist.
Application received  6/13/2019 DONE
Application submitted via PDS Online on Jun 13 2019 9:44AM
First Notice7/22/20207/22/2020   
DetailsJim Storey