BLD-Blower Door Test Results | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | DONE |
Jim Storey
|
|
|
4.6
|
BLD-Final | 11/19/2019 | 11/19/2019 | 11/19/2019 | A | PASS |
Jim Storey
|
|
|
Access is 9378 Phone #: ###-#### Inspection requested via web by jarrod nelson must have landing at door top of stairs.
|
DOC - Permit Finaled | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 9/17/2019 | 9/17/2019 | 9/17/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by jarrod nelson
|
BLD-Framing/Rough-in | 9/17/2019 | 9/17/2019 | 9/17/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by jarrod nelson
|
BLD-Framing/Rough-in | 9/10/2019 | 9/11/2019 | 9/11/2019 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by jarrod nelson ok to insulate c/n on site
|
BLD-Wall Bracing | 8/15/2019 | 8/15/2019 | 8/16/2019 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by jarrod nelson
|
BLD-Foundation | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Dave Hannah
|
|
|
Matt Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/29/2019 | | DONE |
|
|
|
|
BLD-Footing | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | NR |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
OVERRIDE | | | 7/24/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 7/24/2019 | 7/24/2019 | 7/24/2019 | | DONE |
Rob Patrick
|
|
|
|
Routing - PLAN CHECK | 7/24/2019 | | 7/24/2019 | | PASS |
Rob Patrick
|
|
|
|
Routing - PLANNING | 7/24/2019 | | 7/24/2019 | | PASS |
Sue Cummings
|
|
|
|
Permit Ready to Issue | | | 7/24/2019 | | DONE |
|
|
|
PLAN MOD - DO NOT REISSUE
|
Plan Modification Accepted | | | 7/24/2019 | | DONE |
|
|
|
plan mod per Joshua from Riverwood Homes. Site plan required. Sheet A1.1.
|
BLD-Footing | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | NR |
Jim Storey
|
|
|
Matt Phone #: ###-####
|
Inspection Record Card- Bld | | | 6/27/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/27/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/26/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/26/2019 | 6/26/2019 | 6/26/2019 | | PASS |
Josh Bogle
|
|
|
06/27 sfd L1 ePlan
|
Plan assigned to (RDP) | 6/14/2019 | 6/14/2019 | 6/26/2019 | | DEFR |
Rob Patrick
|
|
|
06/27 sfd L1 ePlan
|
Routing - PLAN CHECK | 6/14/2019 | | 6/26/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/26/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/26/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/14/2019 | 6/17/2019 | 6/17/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 6/14/2019 | | 6/17/2019 | | PASS |
Angela Hardy
|
|
|
|
Application received | | | 6/14/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 14 2019 9:26AM
|
Plans ACCEPTED BY PLAN TECH | | | 6/14/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/14/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/14/2019 | | PASS |
|
|
|
|
Routing - MECHANICAL | 6/14/2019 | | 6/14/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/14/2019 | | 6/14/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 6/14/2019 | | 6/14/2019 | | PASS |
Doug Chausow
|
|
|
|