Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02213
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2968 S OLD HICKORY WAY
Project NameLOT 12 BLOCK 1 WOLF TREE SQUAR
Customer Number 
ePlanReviewYes
Description
*** W.U.I. VALLEY INTERIOR LOT; CLASS"A" ROOF REQUIRED *** Permit for the construction of a new 2450 sq. ft., two story (first story 1410 sq. ft., second story 1040 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 124 sq. ft. of covered patio/porch and a 433 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. SP-01 zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/30/201912/31/201912/31/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Gus Brandon
DOC - Permit Finaled12/31/201912/31/201912/31/2019PPASS
DetailsDave Hannah
BLD-Blower Door Test Results12/31/201912/31/201912/31/2019PPASS
DetailsDave Hannah
4.2
BLD-Final12/30/201912/30/201912/30/2019PNR
DetailsBrandon Shaw
Need Plm...
BLD-Blower Door Test Results12/30/201912/30/201912/30/2019PDONE
DetailsBrandon Shaw
ACH50- 4.2
BLD-Energy code compliance10/1/201910/4/201910/4/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD-Framing/Rough-in10/1/201910/1/201910/1/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD-Framing/Rough-in9/27/201910/1/201910/1/2019ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Gus Brandon no plans or truss engineering .
BLD-Wall Bracing9/11/20199/12/20199/12/2019APASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Gus Brandon
BLD-Foundation8/6/20198/7/20198/7/2019PPASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing8/6/20198/6/20198/6/2019PPASS
DetailsBrandon Shaw
Work in progress...
Issue PAID IN FULL permit  7/25/2019 DONE
emailed bhhdrafting@boisehunterhomes.com to sign permitand swend back
Inspection Record Card- Bld  7/25/2019 DONE
OVERRIDE  7/3/2019  
Plan assigned to (RDP)6/14/20196/14/20197/3/2019 DONE
DetailsRob Patrick
07/03 sfd L2 ePlan
Routing - PLAN CHECK6/14/2019 7/3/2019 PASS
DetailsRob Patrick
1st review completed  7/3/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  7/3/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  7/3/2019 DONE
Route to Impact Fee Review6/14/20196/17/20196/17/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Routing - MECHANICAL6/14/2019 6/17/2019 PASS
DetailsTroy James
Routing - PLANNING6/14/2019 6/17/2019 PASS
DetailsEthan Mansfield
Total height from adjacent grade to top of fence must be no higher than 6 feet.
Routing - Addressing6/14/2019 6/17/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/14/2019 6/17/2019 PASS
DetailsAngela Hardy
Application received  6/14/2019 DONE
Application submitted via PDS Online on Jun 14 2019 1:56PM
Intake Approval  6/14/2019 FAIL
NEED
CROSS SECTION
STAIR DETAILS
Plans ACCEPTED BY PLAN TECH  6/14/2019 DONE
Intake Approval  6/14/2019 PASS
customer has been informed that cross section and stair section need to be provided in the future for prescreens
Recd Pcfee & Taken To Pln CK  6/14/2019 DONE