Print Statement | | | 12/5/2019 | | DONE |
|
|
|
|
First Notice | | 11/16/2019 | 11/26/2019 | | DONE |
|
|
|
mailed 12-2-19
|
BLD-Final | 11/5/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Dave Hannah
|
|
|
I am requesting a Final Building inspection for Permanent Occupancy. Please call me 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
FIRE-Final Inspection | 11/6/2019 | 11/6/2019 | 11/6/2019 | P | PASS |
Jim Page
|
|
|
Fire sprinkler inspection is complete, fire alarm inspection is complete, hood suppression system inspection are complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
|
FIRE-Final Inspection | 11/5/2019 | 11/6/2019 | 11/6/2019 | A | FAIL |
Jim Page
|
|
|
FIR permit for fire alarms needs to be inspected and finaled before life fire safety inspection can be completed.
I am requesting a Fire/Life Safety inspection for final. Please call me 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
Permanent Occupancy | | | 11/6/2019 | | DONE |
|
|
|
|
BLD-Final | 10/31/2019 | 11/1/2019 | 11/1/2019 | A | PART |
Dave Hannah
|
|
|
Please call me 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Greg Hedin ok for tco
|
Temporary Occupancy | 11/1/2019 | 1/30/2020 | 11/1/2019 | | DONE |
Brittany Hill
|
|
|
|
Zoning Approval | 11/1/2019 | 11/1/2019 | 11/1/2019 | | PASS |
Katelyn Menuge
|
|
|
|
FIRE-Final Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | PART |
Jim Page
|
|
|
Partial final for life fire safety inspection complete, hood suppression inspections are complete, fire sprinkler inspection is complete, fire alarm inspection is partially complete, see notes under FIR19-00596 for fire alarm comments, fire extinguishers are placed with current inspection tags. Per conversation with Ron Johnson with Boise Fire, a 30 day TCO is authorized for employee training only. Emergency lighting to be installed on patio as discussed per city approved drawings and final inspection for fire alarms are the last remaining items for life fire safety.
|
BLD-Conference | 10/31/2019 | 10/31/2019 | 10/31/2019 | A | DONE |
Dave Hannah
|
|
|
Request conference with Dave Hanna at Tupelo Honey to discuss building final this morning. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Ceiling Grid Inspection | 10/25/2019 | 10/25/2019 | 10/25/2019 | P | PASS |
Mike Jordan
|
|
|
Re inspection for Ceiling grid requested. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Ceiling Grid Inspection | 10/19/2019 | 10/21/2019 | 10/21/2019 | A | NR |
Dave Hannah
|
|
|
Please call 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
FIRE-Conference | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | DONE |
Jim Page
|
|
|
Fire conference is complete, discussed life safety items for a future TCO for training, will need a follow up conference before requested TCO date to look over items required.
please call me 1/2 hour before meeting. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Conference | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | DONE |
Dave Hannah
|
|
|
please call me 1/2 hour before meeting. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Energy code compliance | 9/7/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Dave Hannah
|
|
|
Walk-through for framing inspection to insulate/cover. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Framing/Rough-in | 9/7/2019 | 9/9/2019 | 9/9/2019 | A | PASS |
Dave Hannah
|
|
|
Walk-through for framing inspection to cover. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Framing/Rough-in | 8/27/2019 | 8/27/2019 | 8/29/2019 | P | PART |
Dave Hannah
|
|
|
Request framing inspection to one-side sheetrock. Phone #: ###-#### Inspection requested via web by Greg Hedin ok to one side
|
Permit Ready to Issue | | | 7/25/2019 | | DONE |
|
|
|
MET TREVORG@RADIXCONSTRUCTION.COM
NEED-
GC
Revised Certificate of Value
|
Issue PAID IN FULL permit | | | 7/25/2019 | | DONE |
|
|
|
emailed both erone@radixconstruction.com; johnd@radixconstruction.com so one of them can sign the building permit and send it back-also attached the sign off card
|
Print Occupancy Form | | | 7/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/25/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/25/2019 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/25/2019 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 6/20/2019 | 7/16/2019 | 7/24/2019 | | PASS |
Carl Westfall
|
|
|
(1st done) 07/09/19 (L-3 - 15 days) (eplan - 76 sheets) Tupelo Honey (waiting for plumbing)
|
Routing - PLUMBING | 7/24/2019 | | 7/24/2019 | | PASS |
Daryl Spivey
|
|
|
1) Install gas per 2012 IFGC. 2) Install approved backflow protection as required by ISPC. 3) Per plans and ISPC.
|
Routing - PLAN CHECK | 7/23/2019 | | 7/24/2019 | | PASS |
Carl Westfall
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/22/2019 | | 7/23/2019 | | FAIL |
Carl Westfall
|
|
|
Sent back for corrections without routing to other agencies. Make sure it is route under the 3rd review.
|
Plan resubmittals requested | | | 7/23/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/23/2019 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/22/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 7/16/2019 | 7/19/2019 | 7/17/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - FIRE | 6/20/2019 | 6/20/2019 | 7/16/2019 | | PASS |
Mark Scharfen
|
|
|
07.16.2019-Completed fire review. Uploaded rev_fire 07.16.2019.pdf.
|
1st review completed | | | 7/16/2019 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 7/16/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/20/2019 | | 7/15/2019 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Routing - MECHANICAL | 7/11/2019 | | 7/11/2019 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 6/24/2019 | | 7/2/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLUMBING | 6/20/2019 | | 7/1/2019 | | FAIL |
Dan Ediger
|
|
|
See Changemark
|
Routing - MECHANICAL | 6/20/2019 | | 6/25/2019 | | FAIL |
Troy James
|
|
|
|
Routing Off Site - C.D.H | 6/20/2019 | | 6/24/2019 | | PASS |
Carl Westfall
|
|
|
Scott Paradis
|
Routing - PUBLIC WORKS | 6/20/2019 | | 6/24/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 6/20/2019 | | 6/24/2019 | | PASS |
Andy J. Long
|
|
|
No ESC permit required. No exterior excavation or disturbance, contractor will contain any washout from concrete placement equipment. See ESC17-01790 for overall shell improvements/exterior work.
|
Routing - PLANNING | 6/20/2019 | | 6/21/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 6/20/2019 | | 6/21/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - Design Review | 6/20/2019 | | 6/20/2019 | | PASS |
Katelyn Menuge
|
|
|
DRH19-00215
|
Intake Approval | | | 6/19/2019 | | PASS |
|
|
|
|
Application received | | | 6/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 17 2019 11:16AM
|