Permit Information
Permit NumberBLD19-02223
StatusFinaled
Name RADIX CONSTRUCTION INC
Site Address 150 N 8TH ST Unit: 200
Project NameTupelo Honey
Customer Number 
ePlanReviewYes
Description
(TUPELO HONEY – RESTAURANT – CAPITOL TERRACE – 2ND STORY) (DRH19-00215) The fire sprinkler system is used for high rise and for fire area. Interior nonstructural demolition work was done under permit BLD19-02116. To remodel a shell tenant space for a new restaurant/bar tenant. “Piper Pub” formerly occupied a portion of this tenant space. This tenant space has a total floor area of about 6,492 square feet (about 4,742 square feet interior and 1,750 square feet exterior balcony). Work is to include interior nonbearing walls, interior low height walls, two toilet rooms accessible to the disabled, raised booth seating, horizontal sliding exterior windows, an overhead glass door, a new office with a ceiling, a new vestibule with a ceiling at an exterior door, wood shiplap siding, side-hinged swinging doors, interior double-acting doors, three Type I grease hoods, a Type II dishwasher hood, a 108 square foot walk-in coolers and freezer, an 82 square foot beer cooler, stamped concrete toping floor finish, suspended acoustical ceilings, framed steel mesh soffits, kitchen equipment, a bar, bar equipment, an adjustable accessible drinking surface at the bar, chairs, tables, booths, and finishes. Existing roof structural members are required to be strengthened. Special Inspection is required for welding and for the application of fire-resistance materials. The required fire-resistance-rated construction (i.e. 2-hrs for floors and 1.5-hrs for roofs) is required to be restored where removed or damaged. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 (including the installation of quick-response heads) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  12/5/2019 DONE
First Notice 11/16/201911/26/2019 DONE
mailed 12-2-19
BLD-Final11/5/201911/6/201911/6/2019PPASS
DetailsDave Hannah
I am requesting a Final Building inspection for Permanent Occupancy. Please call me 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Greg Hedin
FIRE-Final Inspection11/6/201911/6/201911/6/2019PPASS
DetailsJim Page
Fire sprinkler inspection is complete, fire alarm inspection is complete, hood suppression system inspection are complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
FIRE-Final Inspection11/5/201911/6/201911/6/2019AFAIL
DetailsJim Page
FIR permit for fire alarms needs to be inspected and finaled before life fire safety inspection can be completed.

I am requesting a Fire/Life Safety inspection for final. Please call me 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Greg Hedin
Permanent Occupancy  11/6/2019 DONE
BLD-Final10/31/201911/1/201911/1/2019APART
DetailsDave Hannah
Please call me 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Greg Hedin ok for tco
Temporary Occupancy11/1/20191/30/202011/1/2019 DONE
DetailsBrittany Hill
Zoning Approval11/1/201911/1/201911/1/2019 PASS
DetailsKatelyn Menuge
FIRE-Final Inspection10/31/201910/31/201910/31/2019PPART
DetailsJim Page
Partial final for life fire safety inspection complete, hood suppression inspections are complete, fire sprinkler inspection is complete, fire alarm inspection is partially complete, see notes under FIR19-00596 for fire alarm comments, fire extinguishers are placed with current inspection tags. Per conversation with Ron Johnson with Boise Fire, a 30 day TCO is authorized for employee training only. Emergency lighting to be installed on patio as discussed per city approved drawings and final inspection for fire alarms are the last remaining items for life fire safety.
BLD-Conference10/31/201910/31/201910/31/2019ADONE
DetailsDave Hannah
Request conference with Dave Hanna at Tupelo Honey to discuss building final
this morning. Phone #: ###-#### Inspection requested via web by Greg Hedin
BLD-Ceiling Grid Inspection10/25/201910/25/201910/25/2019PPASS
DetailsMike Jordan
Re inspection for Ceiling grid requested. Phone #: ###-#### Inspection requested via web by Greg Hedin
BLD-Ceiling Grid Inspection10/19/201910/21/201910/21/2019ANR
DetailsDave Hannah
Please call 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Greg Hedin
FIRE-Conference10/2/201910/3/201910/3/2019ADONE
DetailsJim Page

Fire conference is complete, discussed life safety items for a future TCO for training, will need a follow up conference before requested TCO date to look over items required.

please call me 1/2 hour before meeting. Phone #: ###-#### Inspection requested via web by Greg Hedin
BLD-Conference10/2/201910/3/201910/3/2019ADONE
DetailsDave Hannah

please call me 1/2 hour before meeting. Phone #: ###-#### Inspection requested via web by Greg Hedin
BLD-Energy code compliance9/7/20199/9/20199/9/2019PPASS
DetailsDave Hannah
Walk-through for framing inspection to insulate/cover. Phone #: ###-#### Inspection requested via web by Greg Hedin
BLD-Framing/Rough-in9/7/20199/9/20199/9/2019APASS
DetailsDave Hannah
Walk-through for framing inspection to cover. Phone #: ###-#### Inspection requested via web by Greg Hedin
BLD-Framing/Rough-in8/27/20198/27/20198/29/2019PPART
DetailsDave Hannah
Request framing inspection to one-side sheetrock. Phone #: ###-#### Inspection requested via web by Greg Hedin ok to one side
Permit Ready to Issue  7/25/2019 DONE
MET TREVORG@RADIXCONSTRUCTION.COM
NEED-
GC
Revised Certificate of Value
Issue PAID IN FULL permit  7/25/2019 DONE
emailed both erone@radixconstruction.com; johnd@radixconstruction.com so one of them can sign the building permit and send it back-also attached the sign off card
Print Occupancy Form  7/25/2019 DONE
Print Occupancy Form  7/25/2019 DONE
Print Occupancy Form  7/25/2019 DONE
(F) Reprint permit  7/25/2019 DONE
Plan assigned to (CJW)6/20/20197/16/20197/24/2019 PASS
DetailsCarl Westfall
(1st done) 07/09/19 (L-3 - 15 days) (eplan - 76 sheets) Tupelo Honey (waiting for plumbing)
Routing - PLUMBING7/24/2019 7/24/2019 PASS
DetailsDaryl Spivey
1) Install gas per 2012 IFGC. 2) Install approved backflow protection as required by ISPC. 3) Per plans and ISPC.
Routing - PLAN CHECK7/23/2019 7/24/2019 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  7/24/2019 DONE
Routing - PLAN CHECK7/22/2019 7/23/2019 FAIL
DetailsCarl Westfall
Sent back for corrections without routing to other agencies. Make sure it is route under the 3rd review.
Plan resubmittals requested  7/23/2019 DONE
Plan resubmittals received  7/23/2019 DONE
Plan resubmittals received  7/22/2019 DONE
Route to Impact Fee Review7/16/20197/19/20197/17/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE6/20/20196/20/20197/16/2019 PASS
DetailsMark Scharfen
07.16.2019-Completed fire review. Uploaded rev_fire 07.16.2019.pdf.
1st review completed  7/16/2019 DONE
Plan resubmittals requested  7/16/2019 DONE
Routing - PLAN CHECK6/20/2019 7/15/2019 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - MECHANICAL7/11/2019 7/11/2019 PASS
DetailsTroy James
Routing PW Environmental6/24/2019 7/2/2019 PASS
DetailsRick Christenson
Routing - PLUMBING6/20/2019 7/1/2019 FAIL
DetailsDan Ediger
See Changemark
Routing - MECHANICAL6/20/2019 6/25/2019 FAIL
DetailsTroy James
Routing Off Site - C.D.H6/20/2019 6/24/2019 PASS
DetailsCarl Westfall
Scott Paradis
Routing - PUBLIC WORKS6/20/2019 6/24/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment6/20/2019 6/24/2019 PASS
DetailsAndy J. Long
No ESC permit required. No exterior excavation or disturbance, contractor will contain any washout from concrete placement equipment. See ESC17-01790 for overall shell improvements/exterior work.
Routing - PLANNING6/20/2019 6/21/2019 PASS
DetailsNicolette Womack
Routing - Addressing6/20/2019 6/21/2019 PASS
DetailsDoug Chausow
Routing - Design Review6/20/2019 6/20/2019 PASS
DetailsKatelyn Menuge
DRH19-00215
Intake Approval  6/19/2019 PASS
Application received  6/17/2019 DONE
Application submitted via PDS Online on Jun 17 2019 11:16AM