Second Notice | | 3/15/2020 | 3/11/2020 | | DONE |
|
|
|
This permit finaled on the web by Charlene Meadows
|
First Notice | | 2/15/2020 | 3/5/2020 | | DONE |
|
|
|
mailed 3-6-20
|
Permanent Occupancy | | | 2/5/2020 | | DONE |
|
|
|
|
BLD-Final | 2/4/2020 | 2/4/2020 | 2/4/2020 | P | PASS |
Tony Young
|
|
|
final out TMP permit - Brian Phone #: ###-####,, no card on site to sign
|
Telephone call | | | 2/4/2020 | | DONE |
|
|
|
called and spoke with Brian Ellsworth and they said the door was fixed. final inspection scheduled for 2/4/20 pm
|
Print Occupancy Form | | | 2/4/2020 | | DONE |
|
|
|
|
Telephone call | | | 1/14/2020 | | DONE |
|
|
|
emailed and mailed TCO courtesy letter letting EKC know what they need to do to final this permit
|
BLD-Aging Inspection | 1/1/2020 | 1/1/2020 | 1/7/2020 | | PEND |
Tony Young
|
|
|
|
Temporary Occupancy | 11/4/2019 | 2/2/2020 | 11/4/2019 | | DONE |
Judith Amador
|
|
|
|
BLD-Final | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PART |
Tony Young
|
|
|
Dale Phone #: ###-####.. temp occupancy ok to get moved in,, needs to fix front door
|
FIRE-Final Inspection | 11/1/2019 | 11/1/2019 | 11/1/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Building inspector is going to take front door hardware.
Dale Phone #: ###-####
|
BLD-Final | 10/31/2019 | 11/1/2019 | 11/1/2019 | A | NR |
Tony Young
|
|
|
Dale Phone #: ###-####.. needs trades
|
FIRE-Final Inspection | 10/31/2019 | 10/31/2019 | 10/31/2019 | P | CANC |
Jim Page
|
|
|
FIR permit for fire sprinklers needs to be finaled before life fire safety inspection can be performed, this request is cancelled and will need to be rescheduled. If the FIR permit for fire sprinkler is not finaled with or before next fire life safety inspection request then the disposition for the inspection will be a fail. Dale Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 10/14/2019 | 10/15/2019 | 10/15/2019 | A | PART |
Tony Young
|
|
|
Dale Phone #: ###-####, existing grid, , ok after trades,,
|
BLD-Framing/Rough-in | 9/19/2019 | 9/19/2019 | 9/20/2019 | P | PASS |
Dave Hannah
|
|
|
Dale Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/22/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/22/2019 | | DONE |
|
|
|
|
Telephone call | | | 8/22/2019 | | DONE |
|
|
|
Accidentally added full valuation instead of the difference. Adjusted valuation accordingly. I emailed the GC (Cheralee Keyes w/EKC) of how to request a refund.
|
Plan assigned to (JHB) | 7/8/2019 | 7/8/2019 | 7/31/2019 | | PASS |
Joe Bruce
|
|
|
08/02 (2nd Rev) 07/30 (L3) Rush Bowls, ePlan (Bldg)
|
Plan resubmittals received | | | 7/31/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 7/31/2019 | | 7/31/2019 | | PASS |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/31/2019 | | DONE |
|
|
|
all met: brandon@ekcconstruction.com
NEED
GC FORM
REVISED VALUE
|
Route to Impact Fee Review | 7/30/2019 | 8/2/2019 | 7/30/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/30/2019 | | FAIL |
Joe Bruce
|
|
|
|
Plan resubmittals requested | | | 7/30/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing - FIRE | 7/8/2019 | 7/8/2019 | 7/29/2019 | | PASS |
Mark Scharfen
|
|
|
07.29.2019-Completed fire review, uploaded rev-fire 07.29.2019.pdf.
|
Routing - PLAN CHECK | 7/8/2019 | | 7/29/2019 | | FAIL |
Joe Bruce
|
|
|
Uploaded plan review report into Agency Comments Folder for items that require a resubmittal.
|
Routing PW Environmental | 7/9/2019 | | 7/16/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 7/8/2019 | | 7/9/2019 | | PASS |
Troy James
|
|
|
Ventilation is met by openable doors.
|
Routing - PLUMBING | 7/8/2019 | | 7/9/2019 | | PASS |
Dan Ediger
|
|
|
Per ISPC
|
Routing - PLANNING | 7/8/2019 | | 7/9/2019 | | PASS |
Nicolette Womack
|
|
|
Exterior Changes require DR.
|
Routing - Addressing | 7/8/2019 | | 7/9/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 7/8/2019 | | 7/9/2019 | | PASS |
Angela Hardy
|
|
|
|
Intake Approval | | | 7/3/2019 | | PASS |
|
|
|
|
Intake Approval | | | 7/2/2019 | | FAIL |
Michael Hanson
|
|
|
This permit will be voided.
The applicant is responsible for uploading all documentation required for plan review on the new permit number.
Prior to submitting on the other permit number revise drawings to allow for the required city stamping area in the bottom right corner of each sheet. Additional information available at cityofboise.org (Boise City electronic standards)
|
Telephone call | | | 7/2/2019 | | DONE |
|
|
|
Dennis Taggert called and asked me to void BLD19-02458-he created it by mistake-changed permit app numbers from 518 to 520 which i uploaded into the docs as revised permit app
|
Intake Approval | | | 6/19/2019 | | FAIL |
Michael Hanson
|
|
|
This project does not fit the scope of work for a 518 minor tenant improvement due to the change of use. Please provide the 520 checklist and the additional documents required for a major tenant improvement. A electrical COMCheck will be required please provide that as well.
|
Application received | | | 6/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 17 2019 12:05PM
|