BLD-Final | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Tell Riley
|
|
|
Tim Phone #: ###-####
|
DOC - Permit Finaled | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Tell Riley
|
|
|
|
DOC - Permit Finaled | 9/26/2019 | 9/26/2019 | 9/26/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Energy code compliance | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | PASS |
Tell Riley
|
|
|
Tim Phone #: ###-####
|
BLD-Framing/Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Tell Riley
|
|
|
Tim Phone #: ###-####//electrical passed//framing ok//
|
BLD-Wall Bracing | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | PASS |
Tell Riley
|
|
|
Tim Phone #: ###-####
|
BLD-Footing | 7/8/2019 | 7/8/2019 | 7/8/2019 | A | PASS |
Tell Riley
|
|
|
footing depth ok//spoke with contractor he will add rebar per plans//ok to pour//see previous partial inspection//
|
BLD-Foundation | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PART |
Tell Riley
|
|
|
Tim Phone #: ###-####//finish rebar install per plan change//rebar onsite//
|
BLD-Footing | 6/25/2019 | 6/25/2019 | 6/25/2019 | P | FAIL |
Tell Riley
|
|
|
Tim Phone #: ###-####//correction notice//footing/foundation needs to extend 24" below grade for frost depth//
|
Routing Walk-In (BLD) | 6/25/2019 | 6/25/2019 | 6/25/2019 | A | DONE |
Josh Bogle
|
|
|
possible plan mod
|
Routing - PLAN CHECK | 6/25/2019 | | 6/25/2019 | | PASS |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/25/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/25/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/25/2019 | | DONE |
|
|
|
plan mod
|
BLD-Footing | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | NR |
Tell Riley
|
|
|
Tim Phone #: ###-####//no plans on site//concrete contractor will re-schedule inspection//
|
Routing Walk-In (Zoning) | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
KayCee Babb
|
|
|
|
Routing Walk-In (BLD) | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/17/2019 | | 6/17/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/17/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/17/2019 | | DONE |
Josh Bogle
|
|
|
|
Permit Ready to Issue | | | 6/17/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/17/2019 | | DONE |
|
|
|
|
Application received | | 6/17/2019 | | | |
|
|
|
|