BLD-Final | 12/24/2019 | 12/24/2019 | 12/24/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 12/24/2019 | 12/24/2019 | 12/24/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 12/24/2019 | 12/24/2019 | 12/24/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.79
|
PubWorks Occupancy Approval | 12/24/2019 | 12/24/2019 | 12/24/2019 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Ceiling Grid Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Brandon Shaw
|
|
|
soffett // Les Phone #: ###-####
|
BLD-Energy code compliance | 10/2/2019 | 10/3/2019 | 10/3/2019 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 9/30/2019 | 10/1/2019 | 10/1/2019 | A | PART |
Jim Storey
|
|
|
Les Phone #: ###-#### c/n a-7 bracing web 1/3 points at entry/ stud under single plate to header.// bg1 brace interior end top cord.
ok to insulate.
|
BLD-Wall Bracing | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress... Hold downs and strap to be installed before framing rough-in...
|
BLD-Wall Bracing | 8/20/2019 | 8/21/2019 | 8/20/2019 | A | CANC |
Brandon Shaw
|
|
|
shear // Les Phone #: ###-####-called in wrong permit number
|
BLD-Foundation | 7/26/2019 | 7/26/2019 | 7/26/2019 | P | PASS |
Jim Storey
|
|
|
11am if possible please Phone #: ###-#### Inspection requested via web by Kyle Seick
|
BLD-Footing | 7/25/2019 | 7/25/2019 | 7/25/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
PubWorks Subgrade Approval | 7/25/2019 | 7/25/2019 | 7/25/2019 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
OVERRIDE | | | 7/9/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 6/19/2019 | 6/19/2019 | 7/9/2019 | | DONE |
Jenny Nelson
|
|
|
07/08 sfd L2 ePlan. 1st complete, calcs blank pages
|
Issue PAID IN FULL permit | | | 7/9/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/9/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/9/2019 | | 7/9/2019 | | PASS |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/9/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 7/9/2019 | | DONE |
|
|
|
|
1st review completed | | | 7/3/2019 | | DONE |
Jenny Nelson
|
|
|
|
Routing - PLAN CHECK | 6/19/2019 | | 7/3/2019 | | FAIL |
Jenny Nelson
|
|
|
|
Routing PW Grading-Hillside | 6/19/2019 | | 6/25/2019 | | PASS |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-#### with questions.
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.
|
Route to Impact Fee Review | 6/19/2019 | 6/22/2019 | 6/20/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - FIRE | 6/19/2019 | 6/19/2019 | 6/20/2019 | | PASS |
Lee G Meredith
|
|
|
07/02-2433 S Trapper Residential ePlain 404
Sprinklers are not required.
|
Plans ACCEPTED BY PLAN TECH | | | 6/19/2019 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/19/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/19/2019 | | PASS |
|
|
|
|
Routing - MECHANICAL | 6/19/2019 | | 6/19/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/19/2019 | | 6/19/2019 | | PASS |
Sue Cummings
|
|
|
|
Routing - Addressing | 6/19/2019 | | 6/19/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/19/2019 | | 6/19/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 6/19/2019 | | 6/19/2019 | | PASS |
Michael Zawacki
|
|
|
Foothills home.
|
Application received | | | 6/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 17 2019 3:11PM
|