First Notice | 7/18/2019 | 7/18/2019 | 8/5/2019 | | DONE |
Mike Jordan
|
|
|
mailed 8-5-2019
|
BLD-Final | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | DONE |
Mike Jordan
|
|
|
Nick Phone #: ###-####
|
DOC - Permit Finaled | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Mike Jordan
|
|
|
|
Meeting | | | 7/2/2019 | | DONE |
|
|
|
emailed a reminder to Tracy to please print and sign on the building permit and email it back to permits@cityofboise.org
|
Issue PAID IN FULL permit | | | 7/1/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/1/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/28/2019 | | 6/28/2019 | | PASS |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/28/2019 | | DONE |
|
|
|
|
Plan assigned to (M_H) | 6/20/2019 | | 6/28/2019 | | DONE |
Michael Hanson
|
|
|
2nd review completed - 06/25 #518 L1 ePlan - Crumbl Cookies Awnings
|
Routing - PLAN CHECK | 6/27/2019 | | 6/27/2019 | | FAIL |
Michael Hanson
|
|
|
Engineering sheet modified but engineer stamp and date not updated. Phone call with Tracy B. regarding updating the stamp and date for final resubmittal and approval.
|
Route to Impact Fee Review | 6/21/2019 | 6/24/2019 | 6/24/2019 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - Design Review | 6/24/2019 | | 6/24/2019 | | PASS |
KayCee Babb
|
|
|
Per revised Front Awning Specs submitted 6-24-19, showing a 3' overhang for the awning located above the main entry.
|
Routing - PLAN CHECK | 6/24/2019 | | 6/24/2019 | | FAIL |
Michael Hanson
|
|
|
|
Plan Reviewer's activity | | | 6/21/2019 | | DONE |
Michael Hanson
|
|
|
Emailed applicant advising to make sure to update engineering if changing design per DR.
|
Routing - PLAN CHECK | 6/20/2019 | | 6/21/2019 | | FAIL |
Michael Hanson
|
|
|
design changed after this review 06/24
|
1st review completed | | | 6/21/2019 | | FAIL |
Michael Hanson
|
|
|
See comments from design review.
|
Routing - Design Review | 6/20/2019 | | 6/20/2019 | | FAIL |
KayCee Babb
|
|
|
Awning over the main entry needs to be a minimum of 3' in depth. CZC19-00160.
|
Intake Approval | | | 6/19/2019 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 6/18/2019 | | FAIL |
Michael Hanson
|
|
|
Please provide the required 518 checklist completed and signed. Plans indicate in-field welding which requires a #310 special inspections form unless the welding occurs in a facility by a certified welder. If welding is to occur in a facility with a certified welder please indicate this on the drawings to satisfy this requirement.
|
Application received | | | 6/17/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 17 2019 5:25PM
|