Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberBLD19-02243
StatusIssued
Name DATUM CONSTRUCTION LLC DBA DATUM CO
Site Address 3107 N COLE RD
Project NameIdaho Asian Plaza
Customer NumberBLD19-04058 FOUND ONLY
ePlanReviewYes
Description
(IDAHO ASIAN PLAZA) (DRH19-00038) SPECIAL INSPECTIONS REQUIRED. **PLAN MODIFICATION- PUBLIC WORKS CHANGES TO SITE- 12-23-19** Permit for exterior Site improvements and to construct a new decorative, entry feature; modify the exterior of the building with roof and exterior decorations; Site improvements. Scope of work includes; No Occupancy is being altered. A certificate of completion is to be issued upon final inspection and approval of the project. The building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department***BJM***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Zoning Approval6/24/20206/24/20206/24/2020 PASS
DetailsKayCee Babb
BLD-Final4/28/20204/28/20204/28/2020PNR
DetailsTell Riley
screened // Cody Phone #: ###-####//need to update project description as not all work was completed as described//need zoning approval//need final inspection report from MTI//
BLD-Final4/23/20204/23/20204/23/2020PNR
DetailsTell Riley
Cody Phone #: ###-####//meet with Cody on items needed for final//
Inspection Record Card- Bld  1/10/2020 DONE
CHANGE STATUS TO (ISS)  1/10/2020 DONE
OVERRIDE  1/8/2020  
Plan assigned to (BJM)12/16/201912/16/20191/8/2020 DONE
DetailsBrian McGowan
12/27- Idaho Asian Plaza- plan mod
Routing - PUBLIC WORKS12/23/2019 1/8/2020 PASS
DetailsMorgan Webb
Plan Mod to Plumbing, Waste Vent and CTP Utility
Permit Ready to Issue  1/8/2020 DONE
DO NOT ISSUE- plan mod
Routing - PLAN CHECK1/7/2020 1/7/2020 PASS
DetailsBrian McGowan
Routing PW Environmental12/27/2019 1/6/2020 PASS
DetailsRick Christenson
PLAN MOD
Routing - PLUMBING12/30/2019 12/30/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC
CHANGE STATUS TO (REV)  12/23/2019 DONE
Plan mod was submitted
Plan Modification Accepted  12/16/2019 DONE
Glenn Walker emailed requesting a plan mod workflow started to add a great interceptor. Sheets: P0.0, P1.1, C4
Issue PAID IN FULL permit  12/11/2019 DONE
Inspection Record Card- Bld  12/11/2019 DONE
Telephone call  12/10/2019 DONE
Emailed Glenn Walker asking him to confirm the discrepancy in values and letting him know we still need an RP on this one.
Meeting  12/10/2019 DONE
Spoke with Brian McGowan regarding this permit and the revised values provided by Datum Construction is appropriate. The work that was initially included in this permit was done under BLD19-04058 foundation only, and the work done with associated ESC19-00830 was done under ESC19-00389 with GRD19-00023.
Meeting  12/9/2019 DONE
forward email to Joe on requesting an extension on this project.
Extend Review Timeline  12/9/2019 DONE
1st approved 180 day extension per joe. see documents
Meeting  12/6/2019 DONE
sent an email to gwalker@adpboise.com and marcus_ct_tam@yahoo.com informing permit is going to expire in 9 days and suggested sending an extension request if permit is not going to be picked up soon (permitting process took a bit longer)
OVERRIDE  12/3/2019  
Plan assigned to (BJM)9/13/20199/18/201912/3/2019 DONE
DetailsBrian McGowan
11/11- 1st Review Complete- 502 Idaho Asian Plaza
PLANS/APPL TAKEN TO FRONT DESK  12/3/2019 DONE
DetailsBrian McGowan
Permit Ready to Issue  12/3/2019 DONE
met: gwalker@adpboise.com
Need GC
Need Revised Value

RP not needed - ESC19-00830 voided per Michael Z - see docs in ESC: NEED RP
Routing - FIRE11/29/201911/29/201911/29/2019 PASS
DetailsJoe Bruce
Attached plan review report to case.
Routing - PLAN CHECK11/29/2019 11/29/2019 PASS
DetailsBrian McGowan
Routing - Design Review11/8/2019 11/8/2019 PASS
DetailsKatelyn Menuge
Route to Impact Fee Review10/25/201910/28/201910/28/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  10/24/2019 DONE
DetailsBrian McGowan
Routing - PLAN CHECK9/18/2019 10/24/2019 FAIL
DetailsBrian McGowan
Routing - FIRE9/13/20199/18/201910/18/2019 FAIL
DetailsErika Akin
Applicant needs to upload site plan
Routing Off Site - STRUCTURAL9/18/2019 10/10/2019 PASS
DetailsBrian McGowan
AHJ
Routing PW Environmental9/19/2019 9/20/2019 PASS
DetailsRick Christenson
GREASE INTERCEPTOR SHOWN 1500 Gallon
Routing - PUBLIC WORKS9/18/2019 9/19/2019 PASS
DetailsMorgan Webb
Routing - Erosion and Sediment9/18/2019 9/18/2019 PASS
DetailsMichael Zawacki
Listed RP is not in system.
Site prep inspection required before parking lot work.
Routing - Design Review9/18/2019 9/18/2019 FAIL
DetailsKatelyn Menuge
See Changemarks
Routing - PLUMBING9/18/2019 9/18/2019 PASS
DetailsDaryl Spivey
Per plan and ISPC.
Routing - PLANNING9/18/2019 9/18/2019 PASS
DetailsKarla Nelson
Current planning ok, 22 bike parking spaces do need to be provided on site as specified by DRH19-00038.
Routing - Addressing9/18/2019 9/18/2019 PASS
DetailsDoug Chausow
Intake Approval  9/13/2019 PASS
DetailsJulie Romig
Intake Approval  6/20/2019 FAIL
Need: 3. Leave 4"x2" blank space in the lower right hand corner, 3" off the right sheet edge, on every sheet for the city permit stamp.
Application received  6/18/2019 DONE
Application submitted via PDS Online on Jun 18 2019 8:16AM
Intake Approval  6/18/2019 FAIL
DetailsJulie Romig
Need: 1. Owner signature on Form 310.
2. Provide architect's stamp/signature on all architectural drawings.
3. Leave 4"x2" blank space in the lower right hand corner, 3" off the right sheet edge, on every sheet for the city permit stamp.