BLD-Final | 12/4/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
DOC - Permit Finaled | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 10/31/2019 | 11/1/2019 | 11/1/2019 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 10/28/2019 | 10/29/2019 | 10/29/2019 | P | PASS |
Jim Storey
|
|
|
dAVID Phone #: ###-#### need hvac// ok to insulate.
|
BLD-Conference | 9/16/2019 | 9/16/2019 | 9/16/2019 | P | PASS |
Jim Storey
|
|
|
David Phone #: ###-####
|
BLD-Footing | 8/26/2019 | 8/26/2019 | 8/26/2019 | P | PASS |
Jim Storey
|
|
|
through alley ... no dogs // David Phone #: ###-####
|
OVERRIDE | | | 6/20/2019 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/20/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
Ethan Mansfield
|
|
|
600 SF Accessory Structure, not ADU.
|
Routing Walk-In (BLD) | 6/20/2019 | 6/20/2019 | 6/20/2019 | A | FAIL |
Josh Bogle
|
|
|
took in - waiting on ES report from insulator
|
Plan assigned to (JAB) Josh | 6/20/2019 | 6/20/2019 | 6/20/2019 | | PASS |
Josh Bogle
|
|
|
6/26 office, paper - 1st done
|
Routing - PLAN CHECK | 6/20/2019 | | 6/20/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/20/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/20/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 6/20/2019 | | DONE |
|
|
|
Parcel owner is being GC and RP
|
Routing - PLAN CHECK | 6/20/2019 | | 6/20/2019 | | FAIL |
Josh Bogle
|
|
|
ES report needed for spray foam in non-vented attic assembly
|
Plan resubmittals received | | | 6/20/2019 | | FAIL |
Josh Bogle
|
|
|
|
Issue PAID IN FULL permit | | | 6/20/2019 | | DONE |
|
|
|
|
1st review completed | | | 6/20/2019 | | DONE |
|
|
|
|
Application received | | 6/20/2019 | | | |
|
|
|
|