BLD-Final | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | PASS |
Tell Riley
|
|
|
Chris Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 1/22/2020 | 1/22/2020 | 1/22/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | FAIL |
Tell Riley
|
|
|
Chris Phone #: ###-####//CN posted//plans show R 30 under floor insulation,, appears to be less than R30 installed, possibly original insulation//provide r 30 or plan review approval of existing//
|
Routing - MECHANICAL | 10/18/2019 | | 10/18/2019 | | PASS |
Troy James
|
|
|
New manual j report.
|
BLD-Foundation | 8/8/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Tell Riley
|
|
|
1pm pour // MARK Phone #: ###-####
|
BLD-Footing | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Tell Riley
|
|
|
Mark Phone #: ###-####//property lines have been pinned and setbacks are ok per approved plans//footings installed per plans//
|
BLD-Foundation | 7/24/2019 | 7/25/2019 | 7/25/2019 | A | CANC |
Tell Riley
|
|
|
wall ...130 pour // mark Phone #: ###-####
|
BLD-Footing | 7/23/2019 | 7/24/2019 | 7/24/2019 | A | FAIL |
Tell Riley
|
|
|
mARK- POURING AT 1:30 Phone #: ###-####//need to provide property pins for setback verification//
|
Issue PAID IN FULL permit | | | 6/25/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 6/24/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/20/2019 | 6/20/2019 | 6/24/2019 | | PASS |
Josh Bogle
|
|
|
6/26 foundation, paper
|
Routing - PLAN CHECK | 6/21/2019 | | 6/24/2019 | | PASS |
Josh Bogle
|
|
|
|
Telephone call | | | 6/24/2019 | | DONE |
|
|
|
Called GC to let them know permit is ready and to inform them of fees.
|
1st review completed | | | 6/24/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/24/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/24/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/24/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy no
|
Permit Ready to Issue | | | 6/24/2019 | | DONE |
|
|
|
|
Routing - Addressing | 6/20/2019 | | 6/21/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/20/2019 | | 6/21/2019 | | PASS |
Angela Hardy
|
|
|
|
Route to Impact Fee Review | 6/20/2019 | 6/25/2019 | 6/20/2019 | | PASS |
Shannon Cade
|
|
|
|
Routing Walk-In (Zoning) | 6/20/2019 | 6/20/2019 | 6/20/2019 | A | PASS |
KayCee Babb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/20/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/20/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/20/2019 | | DONE |
|
|
|
|
Application received | | 6/20/2019 | | | |
|
|
|
|