Letter of compliance/Occupancy | | | 2/5/2020 | | DONE |
|
|
|
|
BLD-Final | 1/29/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Brandon Shaw
|
|
|
Clive; bang on front door, addition is in the back. Phone #: ###-####
|
DOC - Permit Finaled | 1/30/2020 | 1/30/2020 | 1/30/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 1/22/2020 | 1/23/2020 | 1/23/2020 | P | FAIL |
Brandon Shaw
|
|
|
Per R 314-allteration/additions...
|
BLD-Final | 12/16/2019 | 12/17/2019 | 12/17/2019 | A | NR |
Brandon Shaw
|
|
|
Need Mech finals...
|
BLD-Energy code compliance | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | PASS |
Brandon Shaw
|
|
|
Clive Phone #: ###-####-call for access if you can't get in-they have the directions
|
BLD-Framing/Rough-in | 9/10/2019 | 9/10/2019 | 9/10/2019 | P | PASS |
Brandon Shaw
|
|
|
OK to insulate...
|
BLD-Framing/Rough-in | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PASS |
Brandon Shaw
|
|
|
Wall bracing...
|
BLD-Foundation | 7/19/2019 | 7/22/2019 | 7/22/2019 | P | PASS |
Jim Storey
|
|
|
Chris - foundation wall Phone #: ###-####
|
BLD-Footing | 7/18/2019 | 7/19/2019 | 7/19/2019 | A | PASS |
Jim Storey
|
|
|
Chris Phone #: ###-####
|
Issue PAID IN FULL permit | | | 7/3/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/1/2019 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 6/20/2019 | 6/20/2019 | 7/1/2019 | | PASS |
Josh Bogle
|
|
|
06/26 addition, paper - 1st done
|
Plan resubmittals received | | | 7/1/2019 | | DONE |
|
|
|
Two copies of each Sheet 1,2 and 3 stamped and taken to plan reviewer.
|
Routing - PLAN CHECK | 7/1/2019 | | 7/1/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 7/1/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 7/1/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2019 | | DONE |
Josh Bogle
|
|
|
ESC yes - Energy yes
|
Permit Ready to Issue | | | 7/1/2019 | | DONE |
|
|
|
met: NEED RP
|
Telephone call | | | 7/1/2019 | | DONE |
|
|
|
emailed doug@culpanandcompany.com with fees and to let them know we need an RP
|
Routing - PLAN CHECK | 6/21/2019 | | 6/25/2019 | | FAIL |
Josh Bogle
|
|
|
PRELIMINARY - NOT FOR CONSTRUCTION
|
1st review completed | | | 6/25/2019 | | FAIL |
Josh Bogle
|
|
|
|
Routing - MECHANICAL | 6/20/2019 | | 6/21/2019 | | PASS |
Troy James
|
|
|
|
Routing Walk-In (Zoning) | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
Ethan Mansfield
|
|
|
|
Routing Walk-In (BLD) | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | PASS |
Josh Bogle
|
|
|
took in for level two review, routed to Mech and PC
|
Application received | | 6/20/2019 | | | |
|
|
|
|