Permit Information
Permit NumberBLD19-02301
StatusFinaled
Name CULPAN & COMPANY
Site Address 2230 S ILLINOIS AVE
Project NameThometz addition
Customer Number 
ePlanReviewNo
Description
Permit for an 800sq' addition that adds a Master Suite and some bonus space. All work per plans, notations, attachments, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance/Occupancy  2/5/2020 DONE
BLD-Final1/29/20201/30/20201/30/2020PPASS
DetailsBrandon Shaw
Clive; bang on front door, addition is in the back. Phone #: ###-####
DOC - Permit Finaled1/30/20201/30/20201/30/2020PPASS
DetailsBrandon Shaw
BLD-Final1/22/20201/23/20201/23/2020PFAIL
DetailsBrandon Shaw
Per R 314-allteration/additions...
BLD-Final12/16/201912/17/201912/17/2019ANR
DetailsBrandon Shaw
Need Mech finals...
BLD-Energy code compliance9/12/20199/13/20199/13/2019APASS
DetailsBrandon Shaw
Clive Phone #: ###-####-call for access if you can't get in-they have the directions
BLD-Framing/Rough-in9/10/20199/10/20199/10/2019PPASS
DetailsBrandon Shaw
OK to insulate...
BLD-Framing/Rough-in8/12/20198/12/20198/12/2019PPASS
DetailsBrandon Shaw
Wall bracing...
BLD-Foundation7/19/20197/22/20197/22/2019PPASS
DetailsJim Storey
Chris - foundation wall Phone #: ###-####
BLD-Footing7/18/20197/19/20197/19/2019APASS
DetailsJim Storey
Chris Phone #: ###-####
Issue PAID IN FULL permit  7/3/2019 DONE
OVERRIDE  7/1/2019  
Plan assigned to (JAB) Josh6/20/20196/20/20197/1/2019 PASS
DetailsJosh Bogle
06/26 addition, paper - 1st done
Plan resubmittals received  7/1/2019 DONE
Two copies of each Sheet 1,2 and 3 stamped and taken to plan reviewer.
Routing - PLAN CHECK7/1/2019 7/1/2019 PASS
DetailsJosh Bogle
Inspection Record Card- Bld  7/1/2019 DONE
DetailsJosh Bogle
Case Summary (BLD)  7/1/2019 DONE
DetailsJosh Bogle
PLANS/APPL TAKEN TO FRONT DESK  7/1/2019 DONE
DetailsJosh Bogle
ESC yes - Energy yes
Permit Ready to Issue  7/1/2019 DONE
met: NEED RP
Telephone call  7/1/2019 DONE
emailed doug@culpanandcompany.com with fees and to let them know we need an RP
Routing - PLAN CHECK6/21/2019 6/25/2019 FAIL
DetailsJosh Bogle
PRELIMINARY - NOT FOR CONSTRUCTION
1st review completed  6/25/2019 FAIL
DetailsJosh Bogle
Routing - MECHANICAL6/20/2019 6/21/2019 PASS
DetailsTroy James
Routing Walk-In (Zoning)6/20/20196/20/20196/20/2019PPASS
DetailsEthan Mansfield
Routing Walk-In (BLD)6/20/20196/20/20196/20/2019PPASS
DetailsJosh Bogle
took in for level two review, routed to Mech and PC
Application received 6/20/2019