Permit Information
Permit NumberBLD19-02308
StatusFinaled
Name CBH HOMES
Site Address 5988 S STURGEON WAY
Project NameLOT 19 BLK 03 FORK SOUTH SUB
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 2054 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 40 sq. ft. of covered patio/porch and a 669 sq. ft. attached garage per the approved plans and any notations. Prescriptive Energy Compliance. R-1C zoning and setbacks per planning. ***RDP***
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/11/20202/12/20202/12/2020PPASS
DetailsMike Jordan
Garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled2/12/20202/12/20202/12/2020PPASS
DetailsMike Jordan
All issues have been resolved.
BLD-Final2/4/20202/4/20202/4/2020PFAIL
DetailsMike Jordan
garage door code is 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle. Provide handrail for front stairs. Complete fill and grading. Clean up trash from crawl spcae and complte vapor barrier.
BLD-Energy code compliance12/4/201912/5/201912/5/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in12/4/201912/5/201912/5/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in12/4/201912/4/201912/4/2019PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Energy code compliance12/4/201912/4/201912/4/2019PCANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Joel Hirtle Inspection cancelled from web by: Joel Hirtle
BLD-Framing/Rough-in12/2/201912/3/201912/3/2019PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Nail D4G 2ply truss per the engineering. Provide purlins on top chords of B3 and B4 trusses at overbuild were roof sheathing has been left off. Ok to insulate. Correction notice posted.
BLD-Wall Bracing11/20/201911/20/201911/20/2019PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Foundation11/1/201911/4/201911/4/2019PPART
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing10/31/201911/1/201911/1/2019PPART
DetailsMike Jordan
dane Phone #: ###-####
Routing - MECHANICAL10/17/2019 10/18/2019 PASS
DetailsChad Schwendiman
Plan Modification Accepted  10/17/2019 DONE
plan mod for manual J
Inspection Record Card- Bld  10/2/2019 DONE
attached sign off card in e plan approved docs
Issue PAID IN FULL permit  10/2/2019 DONE
emailed permitting@cbhhomes.com to sign permits and send back
OVERRIDE  7/3/2019  
Plan assigned to (RDP)6/21/20196/21/20197/3/2019 DONE
DetailsRob Patrick
07/04 sfd L1 ePlan
Routing - PLAN CHECK6/21/2019 7/3/2019 PASS
DetailsRob Patrick
1st review completed  7/3/2019 DONE
DetailsRob Patrick
PLANS/APPL TAKEN TO FRONT DESK  7/3/2019 DONE
DetailsRob Patrick
Permit Ready to Issue  7/3/2019 DONE
met
Route to Impact Fee Review6/21/20196/24/20196/24/2019 PASS
DetailsEric Bilimoria
Initial residential review of new SFD permits requested for now.
Application received  6/21/2019 DONE
Application submitted via PDS Online on Jun 21 2019 7:11AM
Plans ACCEPTED BY PLAN TECH  6/21/2019 DONE
Recd Pcfee & Taken To Pln CK  6/21/2019 DONE
Intake Approval  6/21/2019 PASS
Routing - MECHANICAL6/21/2019 6/21/2019 PASS
DetailsTroy James
Routing - PLANNING6/21/2019 6/21/2019 PASS
DetailsSue Cummings
Routing - Addressing6/21/2019 6/21/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS6/21/2019 6/21/2019 PASS
DetailsAngela Hardy