Letter of compliance/Occupancy | | | 9/23/2019 | | DONE |
|
|
|
|
Letter of compliance/Occupancy | | | 9/18/2019 | | DONE |
|
|
|
|
BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | PASS |
Tell Riley
|
|
|
Kevin Phone #: ###-####//all trades finals complete//smoke and carbon monoxide detectors installed with fire alarm system//
|
DOC - Permit Finaled | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 9/12/2019 | 9/13/2019 | 9/13/2019 | A | NR |
Tell Riley
|
|
|
Kevin Phone #: ###-####//need to have plans onsite for inspection//call in for re-isnpection//
|
BLD-Framing/Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 | A | PASS |
Tell Riley
|
|
|
Kevin-Phone #: ###-####//need smoke and CO detectors prior to final//sprinkler sysem will be installed within rooms at ceiling level//cover walls and patches only//
|
BLD-Framing/Rough-in | 6/27/2019 | 6/28/2019 | 6/28/2019 | P | NR |
Tell Riley
|
|
|
KEVIN Phone #: ###-####///needs electrical rough prior to framing inspection///
|
Routing Walk-In (BLD) | 6/21/2019 | 6/21/2019 | 6/21/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/21/2019 | | 6/21/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/21/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/21/2019 | | DONE |
|
|
|
|
Application received | | 6/21/2019 | | | |
|
|
|
|