Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD19-02313
StatusIssued
Name GUHO CORP
Site Address 121 S 9TH ST Unit: 501
Project NameCCDC, Suite #501 Entry Remodel
Customer Number 
ePlanReviewYes
Description
(CAPITOL CITY DEVELOPMENT CORPORATION) **(Ste. 501)** To modify location of entry door & window assembly within a 5,594 square foot area located on the fifth floor. Work to include the demolition of existing coat closet, demo entry door, demo non-bearing interior partition wall, new entry door, sidelites with tempered glazing, and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully fire sprinklered per NFPA 13 with a fire alarm system as regulated by the Fire Department because it has occupied floors more than 55 feet above the street, to substitute for rated corridors, to allow unprotected openings at the alley, to allow one stair enclosure to pass through a nonrated lobby on the 1st story, etc. Any alterations or modifications to the sprinkler system and/or fire alarm system shall be per NFPA #13 as regulated by the fire department. **JHB**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in8/15/20198/19/20198/19/2019APASS
DetailsDave Hannah
Tom Phone #: ###-####
Issue PAID IN FULL permit  8/1/2019 DONE
Inspection Record Card- Bld  8/1/2019 DONE
Route to Impact Fee Review7/15/20197/18/20197/16/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Plan assigned to (JHB)7/9/20197/9/20197/15/2019 PASS
DetailsJoe Bruce
(1st Rev Comp) 07/15 (L2) CCDC, ePlan
Routing - PLAN CHECK7/9/2019 7/15/2019 FAIL
DetailsJoe Bruce
1st review completed  7/15/2019 FAIL
DetailsJoe Bruce
Plan resubmittals requested  7/15/2019 DONE
DetailsJoe Bruce
Called applicant to communicate corrections required for a resubmittal.
Plan resubmittals received  7/15/2019 DONE
DetailsJoe Bruce
Routing - PLAN CHECK7/15/2019 7/15/2019 PASS
DetailsJoe Bruce
PLANS/APPL TAKEN TO FRONT DESK  7/15/2019 DONE
Permit Ready to Issue  7/15/2019 DONE
all met-7-31-19 emailed brady@guhocorp.com the fees due CAN
NEED GC
Need rev cert of val
Routing - Addressing7/9/2019 7/10/2019 PASS
DetailsDoug Chausow
Ste 501
Intake Approval  7/9/2019 PASS
DetailsMichael Hanson
Prescreen approved by M_H.
Intake Approval  7/5/2019 FAIL
DetailsMichael Hanson
07/05 - Thank you for the resubmittals. I am returning and once you upload the 304 and resubmit I will approve this prescreen.
Intake Approval  7/2/2019 FAIL
DetailsMichael Hanson
Please provide the following:
1. Completed 304 form
2. Individually uploaded construction drawings named and oriented per the Boise City drawings standards
3. Minimum size 18" x 24"
4. Wall bracing detail. (Demonstrate how attaching new wall to current structure)
Application received  6/21/2019 DONE
Application submitted via PDS Online on Jun 21 2019 10:24AM