Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD19-02314
StatusIssued
Name CM COMPANY
Site Address 720 E PARK BLVD
Project NameSt. Luke's
Customer Number 
ePlanReviewYes
Description
(ST LUKES – WASHINGTON GROUP PLAZA - SITE IMPROVEMENTS) PLAN MODIFICATION #2 //3-30-2020 FOR PHASE 3 AND 4 CONSTRUCTION AREAS (ORIGINALLY DESCRIBED AS 'PRIORITY AREA 4 & 5' IN ORIGINAL PERMIT APPLICATION, REFER TO LETTER INCLUDED FOR ADDITIONAL INFORMATION AND EXPLANATION). PHASE 3 AND 4 WORK TO INCLUDE: INCREASED SURFACE REPAIR AREAS WITH REVISED LAYOUT PLANS, GRADING AND LANDSCAPE REPAIR PLUS ADDITION OF LIGHTING REPAIRS. THE REMAINING PRIORITY AREA 1 AND PRIORITY AREA 3 WILL BE SUBMITTED AS A FUTURE AND FINAL PLAN MODIFICATION. Jg// PLAN MODIFICATION #1 //11-27-2019 TO AREA 1 BY CHANGING AN EXISTING STAIR TO A RAMP W/HANDRAILS, CONCRETE WORK, MODIFY GRADING/LANDSCAPING TO ACOMADATE STRUCTURAL DESIGN REPAIR WORK, ADDITIONAL SIDEWALK REPAIR WORK AND ELECTRICAL WORK, IN AREA 2 BY MODIFYING HANDRAIL DESIGN AT RAMP AND ELECTRICAL WORK. NOTE: SPECIAL INSPECTION REQUIRED SEE ATTACHED 310 FORM. jg// Permit for exterior site improvement work at various areas around plaza buildings. Approval is contingent upon the approved plans on file, DRH19-00279 and plan review report. Work to include: select removal of asphalt paving and concrete work, select removal and replacement of parking lot striping, select removal of curb and gutter, removal of select trees, removal of select stairs, removal of select brick pavers, select removal/relocation and select new accessible parking spaces and accessible parking signs, removal and replacement of bike rack, select new curb/gutter concrete work, select new concrete flat work, select new accessible pedestrian concrete ramp, select new concrete stairs, select new pedestrian ramp and stair handrail, select new guardrail. Note: This is a scope of work permit only; A Letter of Completion is to be issued when done. Some buildings are fully fire sprinklered and alarmed. Any alterations to the sprinkler or alarm systems of those buildings shall comply with NFPA 13 and 72 as regulated by the fire department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection6/29/20206/29/20206/30/2020 PEND
DetailsDave Hannah
BLD-Aging Inspection6/30/20206/30/20206/30/2020 PEND
DetailsDave Hannah
CHANGE STATUS TO (ISS)  4/22/2020 DONE
OVERRIDE  4/21/2020  
Plan assigned to (JG)3/12/20203/12/20204/21/2020 PASS
DetailsJavier Guzman
04/10 2nd rev plan mod #2 St. Luke's, pend DR
Routing - Design Review4/6/2020 4/21/2020 PASS
DetailsJosh Wilson
ok per DRH20-00146
PLANS/APPL TAKEN TO FRONT DESK  4/21/2020 DONE
Permit Ready to Issue  4/21/2020 DONE
DONT ISSE- PLAN MOD #2 approved
Routing - PLAN CHECK4/6/2020 4/6/2020 PASS
DetailsJavier Guzman
Routing - PLAN CHECK3/12/2020 3/30/2020 PASS
DetailsJavier Guzman
Routing - Design Review3/19/2020 3/26/2020 FAIL
DetailsJosh Wilson
Design Review modification required
Routing PW Drainage3/23/2020 3/25/2020 PASS
DetailsJason C. Taylor
No review required. Jason Taylor ###-####
Routing - Erosion and Sediment3/19/2020 3/24/2020 PASS
DetailsMichael Zawacki
See entry in Plan reviewer's activity notes
Routing PW Street Lights3/23/2020 3/23/2020 PASS
DetailsTom Marshall
Routing - PUBLIC WORKS3/19/2020 3/23/2020 PASS
DetailsMorgan Webb
See entry in Plan reviewer's activity notes
Plan Reviewer's activity  3/19/2020 DONE
DetailsJavier Guzman
Phase 3 & 4: Increased surface repair areas with revised layout plans, grading and landscape repair plus addition of lighting repairs. Originally described as 'priority area 4 & 5' in original permit application 19-02314. This is a stand-alone packagefor phase 3 and 4 construction areas, which are not under construction yet. The remaining priority area 1 (North side)and priority area 3 will be submitted as a future and final plan modification.
BLD-Final12/27/201912/30/201912/30/2019APEND
DetailsDave Hannah
area 1 & 2 // Bruce Phone #: ###-#### ok after elec is finaled
CHANGE STATUS TO (ISS)  12/2/2019 DONE
plan mod
OVERRIDE  11/29/2019  
Permit Ready to Issue  11/29/2019 DONE
**DO NOT REISSUE - PLAN MOD**
Plan assigned to (JG)11/4/201911/4/201911/27/2019 PASS
DetailsJavier Guzman
11/27 Plan Mod St. Luke's ePlan
Routing - PLAN CHECK11/19/2019 11/27/2019 PASS
DetailsJavier Guzman
Routing PW Drainage11/19/2019 11/27/2019 CANC
DetailsBrian Murphy
Per PW Brian Murphy no review required for the plan Mod
Routing - Design Review11/19/2019 11/21/2019 PASS
DetailsJosh Wilson
Routing - PUBLIC WORKS11/19/2019 11/19/2019 PASS
DetailsMorgan Webb
CHANGE STATUS TO (REV)  11/4/2019 DONE
Telephone call  11/4/2019 DONE
Called Kerstin who submitted the 522 and a 306. I started the plan mod, but the 306 on showed how much they wanted to add to the project value, not the total value. I called her and let her know that we would need her to resubmit the 306 with the total value.
Plan Modification Accepted  11/4/2019 DONE
Kerstin Dettrich from The Land Group requested a plan mod. Additional sidewalk repair, revised grading (no stormwater changes); Revised handrail design at ramp; Electrical repair plans.
C0.60 & C0.61 Revised Site Details, C1.00 Revised Priority 1 Demolition Plan. C1.10 Priority 1 Revised layout & materials, C1.20 Priority 1 Revised Grading, C2.20 Revised Priority 2 Grading. CS0.63 New Structural Details Sheet, E1;, E2, E3 New Electrical Lighting (Repair) Sheets
Issue PAID IN FULL permit  8/15/2019 DONE
Inspection Record Card- Bld  8/15/2019 DONE
OVERRIDE  7/31/2019  
Plan assigned to (JG)7/10/20197/10/20197/31/2019 PASS
DetailsJavier Guzman
2nd rev comp, 07/31 L3 St Lukes Exterior Improvements, ePlan
Routing - PLAN CHECK7/31/2019 7/31/2019 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  7/31/2019 DONE
Permit Ready to Issue  7/31/2019 DONE
MET SEANS@CMCOMPANY.COM
Need GC
Need Rev Val
Route to Impact Fee Review7/24/20197/27/20197/25/2019 PASS
DetailsShannon Cade
Review requested for Commercial Permit
Routing - PLAN CHECK7/10/2019 7/24/2019 FAIL
DetailsJavier Guzman
1st review completed  7/24/2019 FAIL
DetailsJavier Guzman
Routing - FIRE7/10/20197/10/20197/18/2019 PASS
DetailsErika Akin
Pedestrian, parking site improvements and pavement striping. No change to exisiting FD access. No fire life safety inspection required.
Routing - PLANNING7/17/2019 7/17/2019 PASS
DetailsNicolette Womack
Routing PW Drainage7/10/2019 7/11/2019 PASS
DetailsBrian Murphy
ACHD
Routing - Design Review7/10/2019 7/11/2019 PASS
DetailsJosh Wilson
Intake Approval  7/10/2019 PASS
DetailsBrian McGowan
Prescreen approved by BJM
Routing PW Street Lights7/10/2019 7/10/2019 PASS
DetailsTom Marshall
Routing PW Solid Waste7/10/2019 7/10/2019 PASS
DetailsEvan Carpenter
No changes to solid waste.
Plan Reviewer's activity  7/10/2019 DONE
DetailsJoe Bruce
Sent email to applicant notifying them that the application is being routed at a Major TI (520).
Routing - PUBLIC WORKS7/10/2019 7/10/2019 PASS
DetailsAngela Hardy
Routing - Erosion and Sediment7/10/2019 7/10/2019 PASS
DetailsMichael Zawacki
Intake Approval  7/3/2019 FAIL
DetailsBrian McGowan
Please provide the following for your Prescreen to be approved;

1. Planning and Zoning Letters of approval for exterior Site work.
Please contact Andrea Tuning @ ###-#### for further information if needed.
Intake Approval  6/28/2019 FAIL
DetailsBrian McGowan
Please provide the following for your Prescreen to be approved;

1. ESC Plan or accepted Waiver Letter. If no waiver letter, please provide the additional reports as required in the Submittal Checklist.
2. Planning and Zoning Letters of approval for exterior Site work.
Intake Approval  6/27/2019 FAIL
DetailsBrian McGowan
Please provide the following for your Prescreen to be approved;

1. ESC Plan or accepted Waiver Letter.
2. Planning and Zoning Letters of approval for exterior Site work.
Intake Approval  6/24/2019 FAIL
DetailsBrian McGowan
Please provide the following for your Prescreen to be approved:
1. A completed Submittal Checklist. Provide the information as required/needed from the Checklist.
2. The Code Analysis on the Cover Sheet must list Boise City current Code requirements.
3. Verify all the Sheets are stamped and signed by the Engineer as required.
Application received  6/21/2019 DONE
Application submitted via PDS Online on Jun 21 2019 10:39AM