BLD-Aging Inspection | 6/29/2020 | 6/29/2020 | 6/30/2020 | | PEND |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 6/30/2020 | 6/30/2020 | 6/30/2020 | | PEND |
Dave Hannah
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/22/2020 | | DONE |
|
|
|
|
OVERRIDE | | | 4/21/2020 | | |
|
|
|
|
Plan assigned to (JG) | 3/12/2020 | 3/12/2020 | 4/21/2020 | | PASS |
Javier Guzman
|
|
|
04/10 2nd rev plan mod #2 St. Luke's, pend DR
|
Routing - Design Review | 4/6/2020 | | 4/21/2020 | | PASS |
Josh Wilson
|
|
|
ok per DRH20-00146
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/21/2020 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/21/2020 | | DONE |
|
|
|
DONT ISSE- PLAN MOD #2 approved
|
Routing - PLAN CHECK | 4/6/2020 | | 4/6/2020 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 3/12/2020 | | 3/30/2020 | | PASS |
Javier Guzman
|
|
|
|
Routing - Design Review | 3/19/2020 | | 3/26/2020 | | FAIL |
Josh Wilson
|
|
|
Design Review modification required
|
Routing PW Drainage | 3/23/2020 | | 3/25/2020 | | PASS |
Jason C. Taylor
|
|
|
No review required. Jason Taylor ###-####
|
Routing - Erosion and Sediment | 3/19/2020 | | 3/24/2020 | | PASS |
Michael Zawacki
|
|
|
See entry in Plan reviewer's activity notes
|
Routing PW Street Lights | 3/23/2020 | | 3/23/2020 | | PASS |
Tom Marshall
|
|
|
|
Routing - PUBLIC WORKS | 3/19/2020 | | 3/23/2020 | | PASS |
Morgan Webb
|
|
|
See entry in Plan reviewer's activity notes
|
Plan Reviewer's activity | | | 3/19/2020 | | DONE |
Javier Guzman
|
|
|
Phase 3 & 4: Increased surface repair areas with revised layout plans, grading and landscape repair plus addition of lighting repairs. Originally described as 'priority area 4 & 5' in original permit application 19-02314. This is a stand-alone packagefor phase 3 and 4 construction areas, which are not under construction yet. The remaining priority area 1 (North side)and priority area 3 will be submitted as a future and final plan modification.
|
BLD-Final | 12/27/2019 | 12/30/2019 | 12/30/2019 | A | PEND |
Dave Hannah
|
|
|
area 1 & 2 // Bruce Phone #: ###-#### ok after elec is finaled
|
CHANGE STATUS TO (ISS) | | | 12/2/2019 | | DONE |
|
|
|
plan mod
|
OVERRIDE | | | 11/29/2019 | | |
|
|
|
|
Permit Ready to Issue | | | 11/29/2019 | | DONE |
|
|
|
**DO NOT REISSUE - PLAN MOD**
|
Plan assigned to (JG) | 11/4/2019 | 11/4/2019 | 11/27/2019 | | PASS |
Javier Guzman
|
|
|
11/27 Plan Mod St. Luke's ePlan
|
Routing - PLAN CHECK | 11/19/2019 | | 11/27/2019 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Drainage | 11/19/2019 | | 11/27/2019 | | CANC |
Brian Murphy
|
|
|
Per PW Brian Murphy no review required for the plan Mod
|
Routing - Design Review | 11/19/2019 | | 11/21/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing - PUBLIC WORKS | 11/19/2019 | | 11/19/2019 | | PASS |
Morgan Webb
|
|
|
|
CHANGE STATUS TO (REV) | | | 11/4/2019 | | DONE |
|
|
|
|
Telephone call | | | 11/4/2019 | | DONE |
|
|
|
Called Kerstin who submitted the 522 and a 306. I started the plan mod, but the 306 on showed how much they wanted to add to the project value, not the total value. I called her and let her know that we would need her to resubmit the 306 with the total value.
|
Plan Modification Accepted | | | 11/4/2019 | | DONE |
|
|
|
Kerstin Dettrich from The Land Group requested a plan mod. Additional sidewalk repair, revised grading (no stormwater changes); Revised handrail design at ramp; Electrical repair plans.
C0.60 & C0.61 Revised Site Details, C1.00 Revised Priority 1 Demolition Plan. C1.10 Priority 1 Revised layout & materials, C1.20 Priority 1 Revised Grading, C2.20 Revised Priority 2 Grading. CS0.63 New Structural Details Sheet, E1;, E2, E3 New Electrical Lighting (Repair) Sheets
|
Issue PAID IN FULL permit | | | 8/15/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/15/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/31/2019 | | |
|
|
|
|
Plan assigned to (JG) | 7/10/2019 | 7/10/2019 | 7/31/2019 | | PASS |
Javier Guzman
|
|
|
2nd rev comp, 07/31 L3 St Lukes Exterior Improvements, ePlan
|
Routing - PLAN CHECK | 7/31/2019 | | 7/31/2019 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/31/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/31/2019 | | DONE |
|
|
|
MET SEANS@CMCOMPANY.COM
Need GC
Need Rev Val
|
Route to Impact Fee Review | 7/24/2019 | 7/27/2019 | 7/25/2019 | | PASS |
Shannon Cade
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 7/10/2019 | | 7/24/2019 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 7/24/2019 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 7/10/2019 | 7/10/2019 | 7/18/2019 | | PASS |
Erika Akin
|
|
|
Pedestrian, parking site improvements and pavement striping. No change to exisiting FD access. No fire life safety inspection required.
|
Routing - PLANNING | 7/17/2019 | | 7/17/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing PW Drainage | 7/10/2019 | | 7/11/2019 | | PASS |
Brian Murphy
|
|
|
ACHD
|
Routing - Design Review | 7/10/2019 | | 7/11/2019 | | PASS |
Josh Wilson
|
|
|
|
Intake Approval | | | 7/10/2019 | | PASS |
Brian McGowan
|
|
|
Prescreen approved by BJM
|
Routing PW Street Lights | 7/10/2019 | | 7/10/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Solid Waste | 7/10/2019 | | 7/10/2019 | | PASS |
Evan Carpenter
|
|
|
No changes to solid waste.
|
Plan Reviewer's activity | | | 7/10/2019 | | DONE |
Joe Bruce
|
|
|
Sent email to applicant notifying them that the application is being routed at a Major TI (520).
|
Routing - PUBLIC WORKS | 7/10/2019 | | 7/10/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 7/10/2019 | | 7/10/2019 | | PASS |
Michael Zawacki
|
|
|
|
Intake Approval | | | 7/3/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following for your Prescreen to be approved;
1. Planning and Zoning Letters of approval for exterior Site work.
Please contact Andrea Tuning @ ###-#### for further information if needed.
|
Intake Approval | | | 6/28/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following for your Prescreen to be approved;
1. ESC Plan or accepted Waiver Letter. If no waiver letter, please provide the additional reports as required in the Submittal Checklist.
2. Planning and Zoning Letters of approval for exterior Site work.
|
Intake Approval | | | 6/27/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following for your Prescreen to be approved;
1. ESC Plan or accepted Waiver Letter.
2. Planning and Zoning Letters of approval for exterior Site work.
|
Intake Approval | | | 6/24/2019 | | FAIL |
Brian McGowan
|
|
|
Please provide the following for your Prescreen to be approved:
1. A completed Submittal Checklist. Provide the information as required/needed from the Checklist.
2. The Code Analysis on the Cover Sheet must list Boise City current Code requirements.
3. Verify all the Sheets are stamped and signed by the Engineer as required.
|
Application received | | | 6/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 21 2019 10:39AM
|