BLD-Blower Door Test Results | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Final | 1/21/2020 | 1/22/2020 | 1/22/2020 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Final | 1/20/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
DOC - Permit Finaled | 1/21/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/20/2020 | 1/21/2020 | 1/21/2020 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Blower Door Test Results | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | NR |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Gus Brandon
|
BLD-Final | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | FAIL |
Brandon Shaw
|
|
|
Need to post blower door results... Need PLM final...
|
BLD-Final | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | NR |
Brandon Shaw
|
|
|
Need Plm final...
|
BLD-Energy code compliance | 10/16/2019 | 10/21/2019 | 10/21/2019 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT... OK to cover...
|
BLD-Framing/Rough-in | 10/15/2019 | 10/16/2019 | 10/16/2019 | A | FAIL |
Brandon Shaw
|
|
|
As previously noted-m see wall bracing, need Engineering approval for over drive nails in PHF, right side panel... All hold down and straps to be as per plans... Per plans- (2) 2x6 to be installed, with squash blocks, at all point loads, see plans... Per plans- (4) 1.75x5 LvL king studs and (2) 2x6 DF, at 16" o.c...
|
BLD-Wall Bracing | 9/26/2019 | 9/27/2019 | 9/27/2019 | P | PEND |
Brandon Shaw
|
|
|
Over driven nails at right side of garage, PHF, need engineering approval...
|
BLD-Foundation | 8/11/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Brandon Shaw
|
|
|
As late as possible Phone #: 2054207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 8/8/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 8/7/2019 | 8/8/2019 | 8/8/2019 | P | NR |
Brandon Shaw
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Idaho concrete
|
Issue PAID IN FULL permit | | | 7/26/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/26/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/1/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 6/21/2019 | 6/21/2019 | 7/1/2019 | | DONE |
Jenny Nelson
|
|
|
07/03 sfd L1 ePlan
|
Routing - PLAN CHECK | 6/21/2019 | | 7/1/2019 | | PASS |
Jenny Nelson
|
|
|
|
Telephone call | | | 7/1/2019 | | DONE |
|
|
|
emailed bhhdrafting@boisehunterhomes.com that not all fees are paid and to email permits@cityofboise.org when paid so who's ever turn it is can issue
|
1st review completed | | | 7/1/2019 | | DONE |
Jenny Nelson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/1/2019 | | DONE |
Jenny Nelson
|
|
|
|
Permit Ready to Issue | | | 7/1/2019 | | DONE |
|
|
|
|
Route to Impact Fee Review | 6/21/2019 | 6/24/2019 | 6/24/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - MECHANICAL | 6/21/2019 | | 6/24/2019 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 6/21/2019 | | 6/24/2019 | | PASS |
Ethan Mansfield
|
|
|
Total height of retaining wall and fence cannot exceed 6 feet without fence variance.
|
Routing - Addressing | 6/21/2019 | | 6/24/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PUBLIC WORKS | 6/21/2019 | | 6/24/2019 | | PASS |
Angela Hardy
|
|
|
|
Application received | | | 6/21/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 21 2019 1:25PM
|
Plans ACCEPTED BY PLAN TECH | | | 6/21/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/21/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/21/2019 | | DONE |
|
|
|
|