BLD-Wall cover | 8/11/2020 | 8/12/2020 | 8/12/2020 | A | PASS |
Jim Storey
|
|
|
Please come reinspect 4th floor bathroom for lid cover. 5th and 6th floor for lid cover in bathrooms. Phone #: ###-#### Inspection requested via web by Andy Pense east and main shaft assemblies and penatrations ok// 4 and 5 th ceillings ok shaft protection ok. rfi for coloum protction empeded by horrazontal tube steel must meet 2 hr struc. prorection.
|
BLD-Wall cover | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PART |
Dave Hannah
|
|
|
please come inspect the 3rd and 4th floor bathrooms for lid cover. Phone #: ###-#### Inspection requested via web by Andy Pense ok to cover lids
|
BLD-Wall cover | 8/4/2020 | 8/4/2020 | 8/4/2020 | P | NR |
Dave Hannah
|
|
|
Please come inspect mechanical shaft on the East. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Wall cover | 8/3/2020 | 8/3/2020 | 8/3/2020 | P | PART |
Dave Hannah
|
|
|
Please come verify work complete to cover stair 2 first floor 2 hour. First floor loggia for cover in the lobby as well. Thank you. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Wall cover | 7/29/2020 | 7/29/2020 | 7/29/2020 | A | PASS |
Dave Hannah
|
|
|
Please come inspect the ceiling of the North notch. Please come inspect the 3rd and 4th floors for progress and ceiling cover. Progress on the West wall first floor. Progress on stair 2, 2 hour assembly. Phone #: ###-#### Inspection requested via web by Andy Pense
|
Permit Ready to Issue | | | 7/23/2020 | | DONE |
|
|
|
Plan Mod
|
CHANGE STATUS TO (ISS) | | | 7/23/2020 | | DONE |
|
|
|
|
BLD-Other | 7/22/2020 | 7/22/2020 | 7/22/2020 | P | PASS |
Jim Storey
|
|
|
*Screened* Interior wall cover, Andy Phone #: ###-#### restarms floor penatrations and walls 5 and 6 ok to cover// reviewed stair 2# penatrations ok wip
|
Plan assigned to (Joe) | 7/16/2020 | 7/16/2020 | 7/22/2020 | | PASS |
Joe Bruce
|
|
|
Plan Mod #2
|
Routing - PLAN CHECK | 7/21/2020 | | 7/22/2020 | | PASS |
Joe Bruce
|
|
|
Plan Mod #2
|
BLD-Wall cover | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | PASS |
Mike Jordan
|
|
|
Andy *screened* Phone #: ###-####. Elevator shaft walls for cars 3 and 4 on 10th. floor. Fire proofing patch back on west coloumn north notch. Stair 2 shaft walls floor 6 to 10. main mech shaft floor 3.
|
BLD-Wall cover | 7/14/2020 | 7/15/2020 | 7/17/2020 | A | PART |
Dave Hannah
|
|
|
Please come inspect the following; Stair 1 and stair 2 for cover, 2 Hr. electrical box in the communication room south shaft wall. North notch East column all the way up to level 10. Fire caulk in the bathrooms 2-3 at the floors, main shaft for cover. Thanks, Please call if you have any questions. Phone #: ###-#### Inspection requested via web by Andy Pense
|
Plan Modification Accepted | | | 7/16/2020 | | DONE |
|
|
|
Plan Mod #2 - Revisions to 2hr separation wall. Sheets affected A11-01 & A61-05
|
Plan Reviewer's activity | | | 7/16/2020 | | DONE |
Joe Bruce
|
|
|
Regarding the plan mod #2 - Please provide the licensed design professional architect stamp and signature on the revised plan mod sheets.
|
CHANGE STATUS TO (ISS) | | | 7/13/2020 | | DONE |
|
|
|
|
Plan assigned to (Joe) | 7/1/2020 | 7/1/2020 | 7/7/2020 | | PASS |
Joe Bruce
|
|
|
|
Routing - PLAN CHECK | 7/7/2020 | | 7/7/2020 | | PASS |
Joe Bruce
|
|
|
Plan mod passed - Changed 2-hour wall from U411 to W440
|
Permit Ready to Issue | | | 7/7/2020 | | DONE |
|
|
|
plan mod approved
DO NOT RE ISSUE
|
Route to Impact Fee Review | 7/1/2020 | 7/4/2020 | 7/6/2020 | | PASS |
Travis P Black
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 7/1/2020 | | DONE |
|
|
|
Adding an additional UL assembly for the construction of a 2hr- wall
|
BLD-Wall cover | 6/30/2020 | 6/30/2020 | 6/30/2020 | A | DONE |
Dave Hannah
|
|
|
Please come and inspect the South notch bay East column. Thanks. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 6/30/2020 | 6/30/2020 | 6/30/2020 | P | PART |
Dave Hannah
|
|
|
column east end of south notch ok to cover
|
BLD-Wall cover | 6/26/2020 | 6/26/2020 | 6/26/2020 | P | PART |
Jim Storey
|
|
|
Please come inspect the South notch East side for cover. Contact Andy Pense ###-#### thanks Phone #: ###-#### Inspection requested via web by Andy Pense web patch ok idaho st flange stil nees coverage of fireproofing.
|
BLD-Wall cover | 6/24/2020 | 6/24/2020 | 6/24/2020 | A | PART |
Dave Hannah
|
|
|
Please come inspect the first floor walls for cover. Inspect the 10th floor shaft liner. Phone #: ###-#### Inspection requested via web by Andy Pense first floor north corrador ok
|
BLD-Wall cover | 6/15/2020 | 6/16/2020 | 6/16/2020 | A | PART |
Dave Hannah
|
|
|
Please come inspect the South Notch East wall 2-9. Call Andy with any questions. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Wall cover | 6/11/2020 | 6/12/2020 | 6/12/2020 | A | PEND |
Dave Hannah
|
|
|
Come inspect the south west notch framing for cover. Thanks. Call Andy Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Wall cover | 6/4/2020 | 6/5/2020 | 6/5/2020 | A | PASS |
Dave Hannah
|
|
|
Please come inspect the insulation in the electrical room level 1. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 6/3/2020 | 6/3/2020 | 6/4/2020 | P | PASS |
Dave Hannah
|
|
|
Penthouse framing inspection to cover. Please get with Mike Koci Or Andy Pense. Thanks Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Framing/Rough-in | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PASS |
Dave Hannah
|
|
|
Please come inspect the shaft wall in the elevator pit 3,4. Also South exterior framing for cover. Phone #: ###-#### Inspection requested via web by Andy Pense
|
BLD-Wall cover | 5/18/2020 | 5/18/2020 | 5/18/2020 | P | PASS |
Jim Storey
|
|
|
west cuttin wall minrial wool ok to cover.
|
BLD-Framing/Rough-in | 3/19/2020 | 3/19/2020 | 3/19/2020 | P | PART |
Dave Hannah
|
|
|
Inspect NE section of exterior framing on 3,4 ; 5th flrs. Please call when onsite. Thanks! Phone #: ###-#### Inspection requested via web by Mike Koci section on north side ok
|
FIRE-Conference | 2/20/2020 | 2/20/2020 | 2/20/2020 | A | DONE |
Jim Page
|
|
|
Temporary standpipe has been placed and is in service.
|
FIRE-Conference | 2/13/2020 | 2/13/2020 | 2/13/2020 | A | DONE |
Jim Page
|
|
|
Discussed temporary standpipe approximately 2 weeks ago with site foreman with ESI, temp standpipe has net been installed as of this entry, per section 3313.1 of the 2015 IFC states that a temporary standpipe is required when construction reaches 40 feet, project is past the 40 foot height measurement. ESI superintendent has been notified that the temporary standpipe needs to be installed and operational by 21FEB2020 or a stop work will be placed on project until temporary standpipe is installed. This has been discussed with and supported by Joe Bruce, Fire section supervisor as well as Romeo Gervais, Boise City Fire Marshall.
|
Issue PAID IN FULL permit | | | 11/13/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/13/2019 | | DONE |
|
|
|
|
Routing - FIRE | 10/25/2019 | 10/25/2019 | 10/30/2019 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Plan assigned to (JHB) | 7/9/2019 | 7/9/2019 | 10/30/2019 | | PASS |
Joe Bruce
|
|
|
(2nd Rev Comp) 08/19 (502) 11th & Idaho, ePlan **Project Management Ron Hill**
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/30/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/30/2019 | | DONE |
|
|
|
MET
|
Routing - PLAN CHECK | 10/25/2019 | | 10/28/2019 | | PASS |
Joe Bruce
|
|
|
See plan review report uploaded on 10.28.19 **JHB**
|
Routing PW Street Lights | 10/25/2019 | | 10/25/2019 | | PASS |
Tom Marshall
|
|
|
|
Plan resubmittals received | | | 10/25/2019 | | DONE |
Joe Bruce
|
|
|
|
Plan resubmittals received | | | 10/24/2019 | | FAIL |
Joe Bruce
|
|
|
Received resubmittal in ePlan from Devin on 10/23/19.
|
Plan resubmittals requested | | | 10/24/2019 | | DONE |
Joe Bruce
|
|
|
Please correct the following items before we can process your resubmittal:
1) The following resubmitted pages are missing the registered design professional stamp & signature: G00-01, A11-01, A11-02, A11-03, A12-01, A12-02, A12-03, A30-02, A61-04, E31-04, E31-05. Please resubmit and provide the stamp/signature by the architect and/or engineer on these pages.
2) Form #308 is missing the owner's (Scott Schoenherr) signature on the 1st page. Please have Scott sign and date this form to acknowledge the commissioning agency for the IECC.
|
Routing - FIRE | 10/4/2019 | 10/4/2019 | 10/18/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - Design Review | 10/4/2019 | | 10/17/2019 | | PASS |
Josh Wilson
|
|
|
|
Routing - PLAN CHECK | 10/4/2019 | | 10/14/2019 | | FAIL |
Joe Bruce
|
|
|
|
Routing PW Street Lights | 10/4/2019 | | 10/7/2019 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Sewer Design | 10/4/2019 | | 10/4/2019 | | PASS |
DeAnn Brown
|
|
|
Sewer connection approved under BLD19-02122. Current application is only for interior plumbing changes.
|
Routing - FIRE | 7/9/2019 | 7/9/2019 | 8/19/2019 | | FAIL |
Erika Akin
|
|
|
Attached comments to case and emailed architect
|
Routing - PLAN CHECK | 7/9/2019 | | 8/19/2019 | | FAIL |
Joe Bruce
|
|
|
Plan Review Report contains comments that require a resubmittal.
|
Plan resubmittals requested | | | 8/19/2019 | | DONE |
Joe Bruce
|
|
|
|
1st review completed | | | 8/19/2019 | | DONE |
Joe Bruce
|
|
|
|
Routing Off Site - STRUCTURAL | 7/9/2019 | | 8/13/2019 | | PASS |
Joe Bruce
|
|
|
Structural Review under BLD19-02122
|
Routing - MECHANICAL | 7/9/2019 | | 7/19/2019 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 7/9/2019 | | 7/19/2019 | | FAIL |
Josh Wilson
|
|
|
Provide copy of executed license agreement with ACHD for canopies within R.O.W.
|
Routing PW Sewer Design | 7/10/2019 | | 7/18/2019 | | FAIL |
DeAnn Brown
|
|
|
Please provide site civil plans that show sewer connection to the public sewer system.
|
Routing - PLANNING | 7/9/2019 | | 7/17/2019 | | PASS |
Nicolette Womack
|
|
|
|
Routing PW Environmental | 7/10/2019 | | 7/16/2019 | | PASS |
Rick Christenson
|
|
|
|
Routing PW Solid Waste | 7/10/2019 | | 7/12/2019 | | PASS |
Evan Carpenter
|
|
|
|
Routing - PLUMBING | 7/9/2019 | | 7/12/2019 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing PW Drainage | 7/10/2019 | | 7/11/2019 | | PASS |
Brian Murphy
|
|
|
DRAINAGE REVIEW UNDER FOUNDATION PERMIT
|
Routing PW Geothermal | 7/10/2019 | | 7/11/2019 | | PASS |
Jon R. Gunnerson
|
|
|
Contact PW to connect onto geothermal heating district. Jon Gunnerson ###-####
|
Routing PW Street Lights | 7/10/2019 | | 7/10/2019 | | FAIL |
Tom Marshall
|
|
|
|
Routing - Addressing | 7/9/2019 | | 7/10/2019 | | PASS |
Doug Chausow
|
|
|
Address changed: 1104 W Idaho St
7/17 Address changed: 1100 W Idaho St
|
Routing - PUBLIC WORKS | 7/9/2019 | | 7/10/2019 | | PASS |
Angela Hardy
|
|
|
|
Routing - Erosion and Sediment | 7/9/2019 | | 7/10/2019 | | PASS |
Michael Zawacki
|
|
|
Please refer to ESC19-00779 issued with foundation and super structure permit.
|
Intake Approval | | | 7/9/2019 | | PASS |
Carl Westfall
|
|
|
Prescreen approved by CJW
|
Plan Reviewer's activity | | | 7/8/2019 | | PASS |
|
|
|
Plan intake review approved
|
Intake Approval | | | 6/26/2019 | | FAIL |
|
|
|
(6-26-19) Refer to the circled items in the plan intake checklist. Resolve each item as directed. CJW
|
Application received | | | 6/24/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 24 2019 11:31AM
|
BLD-Wall cover | 8/13/2020 | 8/14/2020 | | A | |
Dave Hannah
|
|
|
Please come inspect the 6th floor for lid for cover. Inspect framing on stair 1 and stair 2. Inspect mechanical shaft liner for cover levels 7-8-9. Inspect the lobby soft for cover, Electrical is in on the East side of the curtain wall lobby. Phone #: ###-#### >> Inspection requested via web by Andy Pense
|