BLD-Conference | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Hannah Maurer
|
DOC - Permit Finaled | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Mike Jordan
|
|
|
Deck is completed. Could only inspect what was visible at this time.
|
Routing Walk-In (BLD) | 6/25/2019 | 6/25/2019 | 6/25/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/25/2019 | | 6/25/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/25/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/25/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/25/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | FAIL |
Josh Bogle
|
|
|
talked about structural minimums
|
Routing - PLAN CHECK | 6/24/2019 | | 6/24/2019 | | FAIL |
Josh Bogle
|
|
|
|
1st review completed | | | 6/24/2019 | | FAIL |
Josh Bogle
|
|
|
|
Meeting | | | 6/24/2019 | | DONE |
|
|
|
Informed Hannah Maurer we will need either a letter from Maxwell Gobel allowing her to pick up the building permit and have him sign the application or have Maxwell pick the permit up himself. Since his name is the only one listed as a parcel owner.
|
Application received | | 6/24/2019 | | | |
|
|
|
|