BLD-Aging Inspection | 7/24/2020 | 7/24/2020 | 7/27/2020 | | PASS |
Tell Riley
|
|
|
wip
|
BLD-Framing/Rough-in | 3/11/2020 | 3/12/2020 | 3/12/2020 | P | PASS |
Tell Riley
|
|
|
Kirk Phone #: ###-####//corrections made//insulation ok as well, cavity filled with r13 wall insulation//
|
BLD-Framing/Rough-in | 3/5/2020 | 3/9/2020 | 3/9/2020 | P | PART |
Tell Riley
|
|
|
Kirk Phone #: ###-####//need to addd bearing as discussed for rafter tails on bearing walls and beam over bathtub//provide information on insulation used to determine the r values//
|
BLD-Conference | 1/9/2020 | 1/10/2020 | 1/10/2020 | A | DONE |
Tell Riley
|
|
|
Kirk Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2020 | 1/9/2020 | 1/9/2020 | P | NR |
Tell Riley
|
|
|
Kirk Phone #: ###-####//used inspection request as conference//discussed structural issues and will be meeting again//need mechanical, plumbing and electrical isnpected prior to framing//
|
Routing - PLAN CHECK | 10/15/2019 | | 10/15/2019 | | PASS |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 10/15/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 10/15/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Issue PAID IN FULL permit | | | 10/15/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/15/2019 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 9/17/2019 | | 9/17/2019 | | FAIL |
Josh Bogle
|
|
|
needs flor plans (before/after) and structural details for under each bearing location
|
Routing Walk-In (BLD) | 6/25/2019 | 6/25/2019 | 6/25/2019 | A | FAIL |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/25/2019 | | 6/25/2019 | | FAIL |
Josh Bogle
|
|
|
needs plans, engineering for site-built beam
|
1st review completed | | | 6/25/2019 | | FAIL |
Josh Bogle
|
|
|
|
Intake Approval | | | 6/25/2019 | | PASS |
Josh Bogle
|
|
|
|
Application received | | 6/25/2019 | | | |
|
|
|
|