Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD19-02369
StatusIssued
Name RANDELL CONCRETE
Site Address 10499 W FAIRVIEW AVE
Project NameAce Hardware Propane Dispenser
Customer Number 
ePlanReviewYes
Description
(ACE HARDWARE PROPANE TANK INSTALL) This is a scope of work only permit a certificate of completion shall be issued upon final inspection approval. Permit to install a 1,999 gallon propane tank. Work to include: 8'-0" W x 7'-0" H x 1'-0" D reinforced concrete footing, (10) bollards, (1) dispensing cabinet, (1) propane tank, and (2) "NO PARKING" signs. Structural engineering has been provided. Approval is contingent on adhering to the approved plans, engineering, local codes and ordinances. MDH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Concrete1/27/20201/28/20201/28/2020APASS
DetailsMike Jordan
Call ahead // Randy Phone #: ###-####. Slab and bollards ok. Noted to contractor that special inspection is required.
Issue PAID IN FULL permit  1/24/2020 DONE
(F) Reprint permit  1/24/2020 DONE
Inspection Record Card- Bld  1/24/2020 DONE
Meeting  1/16/2020 DONE
sent fees to eric and reminded him we will need an rp for issuance as well
Routing - FIRE11/13/201911/18/20191/2/2020 PASS
DetailsErika Akin
Attached comments to case. Please note that an operational permit from Boise Fire is required prior to final.
1st review completed  1/2/2020 DONE
DetailsMichael Hanson
PLANS/APPL TAKEN TO FRONT DESK  1/2/2020 DONE
DetailsMichael Hanson
Permit Ready to Issue  1/2/2020 DONE
***RANDELL WITH RANDELL CONCRETE MUST SIGN THE PERMIT. ERIC OLSON CANNOT***
met
Need
RP
Randell Concrete applied for an ESC waiver. Routed to Michael - see Michael Z.

MET
GC Form
Revised Value
Plan assigned to (M_H)11/18/2019 1/2/2020 DONE
DetailsMichael Hanson
12/24 #502 L3 ePlan - Ace Hardware Propane Dispenser - pending fire review
Routing - PLAN CHECK11/18/2019 12/26/2019 PASS
DetailsMichael Hanson
Routing - PLANNING11/18/2019 11/25/2019 PASS
DetailsKarla Nelson
Routing - PUBLIC WORKS11/18/2019 11/19/2019 PASS
DetailsMorgan Webb
NO NEW PLUMBING
Routing - Erosion and Sediment11/18/2019 11/18/2019 PASS
DetailsMichael Zawacki
Routing - Design Review11/18/2019 11/18/2019 PASS
DetailsKayCee Babb
Per CZC19-00263.
Routing - Addressing11/18/2019 11/18/2019 PASS
DetailsDoug Chausow
Intake Approval  11/13/2019 PASS
DetailsCarl Westfall
Intake approved and fees paid
Plan Reviewer's activity  11/12/2019 PASS
(11-12-19) Plan intake review approved
Intake Approval  10/7/2019 FAIL
(10-7-19) Refer to the circled items in this Plan Intake Checklist that do not have an "OK" in the circle. Resolve each item as directed. Each drawing in the drawings folder must be uploaded individually. Each is required to be full size. Each is required to be stamped by the Structural Engineer. Called and explained requirement to the applicant. CJW
Intake Approval  9/10/2019 FAIL
(9-10-19) Refer to the circled items in the Plan Intake Checklist that do not have an "OK" in the circle. Resolve each item as directed. CJW
Intake Approval  8/6/2019 FAIL
(8-6-19) Refer to the circled items in the Plan Intake Checklist. Resolve each item as directed. CJW
Intake Approval  7/11/2019 FAIL
Fill out and upload Plan Intake Form 502. Make sure all applicable documents are uploaded. CJW
Application received  6/25/2019 DONE
Application submitted via PDS Online on Jun 25 2019 1:36PM