Permit Information
Permit NumberBLD19-02374
StatusFinaled
Name LARSON TOWER SPECIALISTS
Site Address 2051 N 35TH ST
Project NameVerizon Wireless
Customer Number 
ePlanReviewYes
Description
(VERIZON WIRELESS) Permit for the modifications to the existing cellular tower with work to include the removal of (3) panel antennas, adding (3) antennas, adding a OVP and adding (1) 6x12 hybrid cable. No changes to the height of the tower and No changes to interior of existing equipment structure. Structural engineering and plans provided. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/15/20201/15/20201/15/2020PPASS
DetailsDave Hannah
Hello, this inspection is for a minor upgrade to the Verizon antennas on the cell tower at the address on the permit. Unfortunately, we will not be able to be on-site with you during the inspection. However, please don''t hesitate to call if you run into any access issues, or have any questions about the project or the work we did. Thank you!! Phone #: ###-#### Inspection requested via web by Matt Hodgen
DOC - Permit Finaled1/15/20201/15/20201/15/2020PPASS
DetailsDave Hannah
Telephone call  1/10/2020 DONE
Emailed Brandon and Trinidee again asking for a signed permit.
(F) Reprint permit  12/30/2019 DONE
Telephone call  12/30/2019 DONE
emailed contractor requesting a signed permit again.
Issue PAID IN FULL permit  8/23/2019 DONE
Plan assigned to (JG)7/3/20197/3/20197/12/2019 PASS
DetailsJavier Guzman
07/12 L2 Verizon antenna ePlan
Routing - PLAN CHECK7/3/2019 7/12/2019 PASS
DetailsJavier Guzman
1st review completed  7/12/2019 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  7/12/2019 DONE
Permit Ready to Issue  7/12/2019 DONE
MET KALEB@LASRSONTOWER.COM
Need GC
Need Rev Val
Routing - PLANNING7/3/2019 7/3/2019 PASS
DetailsSue Cummings
Intake Approval  7/1/2019 PASS
DetailsJavier Guzman
Intake Approval  6/26/2019 FAIL
DetailsMichael Hanson
Engineering equipment schedule must match submitted construction drawings. Revise and resubmit either so that they match.
Application received  6/25/2019 DONE
Application submitted via PDS Online on Jun 25 2019 3:57PM
First Notice1/15/20201/15/2020   
DetailsDave Hannah