Telephone call | | | 12/30/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with Greg Hedin ###-####. Evermore Prints should be moving out of space this week. New tenant should be preparing to move in. **JHB**
|
Telephone call | | | 11/14/2019 | | DONE |
Joe Bruce
|
|
|
Spoke with Greg Hedin ###-####. Evermore Prints is using this space temporarily as their existing space in this building is vacant for the installation of Tupelo Honey's plumbing/sewer above. Evermore Prints will be moving back into their space by the end of November. See permit BLD13-01272 for existing tenant space. **JHB**
|
BLD-Ceiling Grid Inspection | 10/23/2019 | 10/24/2019 | 10/24/2019 | A | NR |
Jim Storey
|
|
|
Please call me 30 minutes prior to inspection. Thanks Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Final | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | CANC |
Dave Hannah
|
|
|
Please call me to confirm we are ready. Phone #: ###-#### >> Inspection requested via web by Greg Hedin Inspection cancelled from web by: Greg Hedin
|
BLD-Final | 8/22/2019 | 8/26/2019 | 8/26/2019 | A | CANC |
Dave Hannah
|
|
|
Request Final Inspection for C of O, AM if possible. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Final | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PART |
Dave Hannah
|
|
|
Please call me to confirm my fire life safety/fire alarm inspections are complete. Phone #: ###-#### Inspection requested via web by Greg Hedin ok for tco
|
FIRE-Final Inspection | 8/6/2019 | 8/6/2019 | 8/6/2019 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete, fire sprinkler inspection is complete, fire alarm inspection for space is complete but fire alarm system has items that need to be resloved before fire alarm permit will be finaled, fire exitnguisher will be placed in discussed location and has a current inspection tag. TCO authorized for 30 days contingent on the fire alarm issues being resloved.
|
BLD-Final | 8/2/2019 | 8/5/2019 | 8/5/2019 | A | CANC |
Dave Hannah
|
|
|
Request final pending Fire alarm/Life Safety final Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Final | 8/1/2019 | 8/2/2019 | 8/2/2019 | P | CANC |
Dave Hannah
|
|
|
Please call me when you plan to be on site. Thank you. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
FIRE-Final Inspection | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | FAIL |
Jim Page
|
|
|
Fire alarms did not pass inspection, life fire safety inspection was stopped at fire alarm failure, as of this entry the whole building did not have fire alarm notification.
Please call me to schedule inspection. i need to let my subcontractor know when you will be on site. Thank you Phone #: ###-#### Inspection requested via web by Greg Hedin
|
FIRE-Sprinkler Rough-in | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | CANC |
Jim Page
|
|
|
Fire sprinkler inspections need to happen under FIR permit associated with the fire sprinklers, this request is cancelled.
Please call me to schedule inspection. i need to let my subcontractor know when you will be on site. Thank you Phone #: ###-#### Inspection requested via web by Greg Hedin
|
FIRE-Alarm Testing | 8/1/2019 | 8/2/2019 | 8/2/2019 | A | CANC |
Jim Page
|
|
|
Fire alarm testing needs to be done under FIR permit for fire alarms, this request is cancelled.
Please call me to schedule inspection. i need to let my subcontractor know when you will be on site. Thank you Phone #: ###-#### Inspection requested via web by Greg Hedin
|
BLD-Framing/Rough-in | 7/23/2019 | 7/23/2019 | 7/24/2019 | P | PASS |
Dave Hannah
|
|
|
Framing inspection for cover requested. MEP inspections complete. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
FIRE-Conference | 7/23/2019 | 7/23/2019 | 7/23/2019 | P | DONE |
Jim Page
|
|
|
Fire conference is complete, fire sprinkler and fire alarm modifications will be required for tenant space. Modifications to both fire sprinkler system and fire alarm systems requires a permit, no modifications are to be made or completed without a permit.
Request conference on sprinkler add/ relocate at this T.I. space. Phone #: ###-#### Inspection requested via web by Greg Hedin
|
Issue PAID IN FULL permit | | | 7/10/2019 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/10/2019 | | DONE |
|
|
|
|
Plan assigned to (JHB) | 6/27/2019 | 6/27/2019 | 7/8/2019 | | PASS |
Joe Bruce
|
|
|
07/10 (L1) Evermore Prints, ePlan
|
1st review completed | | | 7/8/2019 | | DONE |
Joe Bruce
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/8/2019 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/8/2019 | | DONE |
|
|
|
all met-emailed Radix to the fees due-trevorg@radixconstruction.com
Need GC
Need Rev Val
|
Routing - Addressing | 6/27/2019 | | 7/3/2019 | | PASS |
Doug Chausow
|
|
|
|
Routing - PLAN CHECK | 6/27/2019 | | 7/1/2019 | | PASS |
Joe Bruce
|
|
|
|
Intake Approval | | | 6/27/2019 | | PASS |
Michael Hanson
|
|
|
Prescreen approved by M_H.
|
Application received | | | 6/25/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 25 2019 4:55PM
|