BLD-Final | 1/14/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//corrections made final complete//
|
DOC - Permit Finaled | 1/15/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Tell Riley
|
|
|
|
BLD-Blower Door Test Results | 1/14/2020 | 1/14/2020 | 1/14/2020 | A | DONE |
Tell Riley
|
|
|
4.8 ACH 50
|
BLD-Final | 1/13/2020 | 1/14/2020 | 1/14/2020 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//CN posted on electrical panel--need to seal gyp board behind and around furnace--need to fix smoke detector in 1st floor bedroom, battery not installed/or dead//
|
BLD-Energy code compliance | 10/21/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD-Framing/Rough-in | 10/18/2019 | 10/21/2019 | 10/21/2019 | A | PASS |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//ok to insulate//
|
Routing - MECHANICAL | 10/17/2019 | | 10/17/2019 | | PASS |
Troy James
|
|
|
Revised manual j report
|
BLD-Wall Bracing | 10/1/2019 | 10/3/2019 | 10/3/2019 | P | PART |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//check holddowns that need replaced at framing//
|
BLD-Wall Bracing | 9/30/2019 | 10/1/2019 | 10/1/2019 | P | NR |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//not all braced panels installed//hold downs not nailed//portal frames not complete//
|
BLD-Wall Bracing | 9/30/2019 | 9/30/2019 | 9/30/2019 | P | CANC |
Tell Riley
|
|
|
Phone #: ###-#### >> Inspection requested via web by James Jackson Inspection cancelled from web by: James Jackson
|
BLD-Footing | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Tell Riley
|
|
|
Sergio Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/1/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/1/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/30/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 6/26/2019 | 6/26/2019 | 7/30/2019 | | DONE |
Rob Patrick
|
|
|
07/09 sfd L1 ePlan...07/08 Failed...07/22 Failed...07/29 Failed
|
Routing - PLANNING | 7/30/2019 | | 7/30/2019 | | PASS |
Ethan Mansfield
|
|
|
Ensure all structures are outside of 20' easement.
|
Routing - PLAN CHECK | 7/30/2019 | | 7/30/2019 | | PASS |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 7/30/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/29/2019 | | 7/29/2019 | | FAIL |
Rob Patrick
|
|
|
Satir detail needs addressed
|
Routing - PLAN CHECK | 7/22/2019 | | 7/22/2019 | | FAIL |
Rob Patrick
|
|
|
Stair detail needs completed
|
Routing - PLANNING | 7/22/2019 | | 7/22/2019 | | FAIL |
Ethan Mansfield
|
|
|
There are 2 stacked 10' easements noted on Eronel Sub plat. Building must be located entirely outside of those easements (20' from front property line).
|
1st review completed | | | 7/8/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Routing - PLAN CHECK | 6/26/2019 | | 7/8/2019 | | FAIL |
Rob Patrick
|
|
|
Corrections Req'd
|
Route to Impact Fee Review | 6/26/2019 | 6/29/2019 | 6/27/2019 | | PASS |
Shannon Cade
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PUBLIC WORKS | 6/26/2019 | | 6/27/2019 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 6/26/2019 | | 6/27/2019 | | PASS |
Laura Hunter
|
|
|
|
Routing - PLANNING | 6/26/2019 | | 6/27/2019 | | FAIL |
Ethan Mansfield
|
|
|
There are 2 stacked 10' easements noted on Eronel Sub plat. Building must be located entirely outside of those easements (20' from front property line).
|
Routing - MECHANICAL | 6/26/2019 | | 6/27/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Application received | | | 6/26/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 26 2019 10:29AM
|
Recd Pcfee & Taken To Pln CK | | | 6/26/2019 | | DONE |
|
|
|
|
Intake Approval | | | 6/26/2019 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/26/2019 | | DONE |
|
|
|
|
Routing - PLANNING | 7/26/2019 | | | | FAIL |
|
|
|
All structures must be located outside of 20 feet from the front property line per notes 7 and 10 of Eronel Sub Plat.
|