BLD-Final | 2/27/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Jim Storey
|
|
|
kLENT Phone #: ###-####
|
DOC - Permit Finaled | 2/28/2020 | 2/28/2020 | 2/28/2020 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 11/19/2019 | 11/19/2019 | 11/19/2019 | P | FAIL |
Jim Storey
|
|
|
Clint Phone #: ###-#### c/n posted// need hvac/ truss engineering stamped/air seal// garage not built per plan portal frames// header size/ hold downs w/straps and nail pattern.
|
BLD-Foundation | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | NR |
Jim Storey
|
|
|
ZACK- POURING AT 2PM Phone #: ###-####
|
OVERRIDE | | | 9/12/2019 | | |
|
|
|
|
BLD-Footing | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | PASS |
Jim Storey
|
|
|
Zack Phone #: ###-####
|
Routing Walk-In (BLD) | 9/12/2019 | 9/12/2019 | 9/12/2019 | P | DONE |
Michael Hanson
|
|
|
|
Plan Modification Accepted | | | 9/12/2019 | | DONE |
|
|
|
2nd plan mod- 3 large plans (applicant talked with Michael H.)
|
Plan assigned to (M_H) | 9/12/2019 | | 9/12/2019 | | DONE |
Michael Hanson
|
|
|
2nd plan mod- 3 large plans, talked with Michael H.
|
Routing - PLAN CHECK | 9/12/2019 | | 9/12/2019 | | PASS |
Michael Hanson
|
|
|
1 HOUR PLAN MOD FEE
|
Case Summary (BLD) | | | 9/12/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 9/12/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/12/2019 | | DONE |
|
|
|
|
BLD-Other | 7/11/2019 | 7/12/2019 | 7/12/2019 | A | PART |
Jim Storey
|
|
|
lift // KALEB Phone #: ###-#### lift in living rm ok
|
BLD-Framing/Rough-in | 7/3/2019 | 7/9/2019 | 7/9/2019 | A | PASS |
Jim Storey
|
|
|
Kaleb Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 7/3/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 7/2/2019 | | |
|
|
|
|
Telephone call | | | 7/2/2019 | | DONE |
|
|
|
spoke with Karen- informed fees due for plan mod
|
Plan assigned to (M_H) | 7/1/2019 | | 7/2/2019 | | DONE |
Michael Hanson
|
|
|
07/05 plan mod - residential lift
|
Routing - PLAN CHECK | 7/2/2019 | | 7/2/2019 | | PASS |
Michael Hanson
|
|
|
1 HOUR PLAN MOD FEE
|
Case Summary (BLD) | | | 7/2/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 7/2/2019 | | DONE |
|
|
|
DO NOT ISSUE- plan mod
|
Plan Modification Accepted | | | 7/1/2019 | | DONE |
|
|
|
adding a lift
|
OVERRIDE | | | 6/26/2019 | | |
|
|
|
|
Routing Walk-In (Zoning) | 6/26/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Ethan Mansfield
|
|
|
Garage in rear of proprety has been permitted, which covers 2 parking spaces in back.
|
Routing Walk-In (BLD) | 6/26/2019 | 6/26/2019 | 6/26/2019 | A | PASS |
Michael Hanson
|
|
|
|
Routing - PLAN CHECK | 6/26/2019 | | 6/26/2019 | | PASS |
Michael Hanson
|
|
|
|
Plan assigned to (M_H) | 6/26/2019 | | 6/26/2019 | | DONE |
Michael Hanson
|
|
|
|
1st review completed | | | 6/26/2019 | | DONE |
Michael Hanson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/26/2019 | | DONE |
Michael Hanson
|
|
|
|
Inspection Record Card- Bld | | | 6/26/2019 | | DONE |
Michael Hanson
|
|
|
|
Case Summary (BLD) | | | 6/26/2019 | | DONE |
Michael Hanson
|
|
|
|
Permit Ready to Issue | | | 6/26/2019 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/26/2019 | | DONE |
|
|
|
|
Application received | | 6/26/2019 | | | |
|
|
|
|