BLD-Final | 7/15/2019 | 7/15/2019 | 7/15/2019 | A | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 7/15/2019 | 7/15/2019 | 7/15/2019 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Other | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | CANC |
Mike Jordan
|
|
|
steps // Paul Phone #: ###-####
|
Issue PAID IN FULL permit | | | 6/28/2019 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/27/2019 | 6/27/2019 | 6/27/2019 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 6/27/2019 | 6/27/2019 | 6/27/2019 | A | DONE |
Josh Bogle
|
|
|
|
Routing - PLAN CHECK | 6/27/2019 | | 6/27/2019 | | PASS |
Josh Bogle
|
|
|
|
1st review completed | | | 6/27/2019 | | DONE |
Josh Bogle
|
|
|
|
Inspection Record Card- Bld | | | 6/27/2019 | | DONE |
Josh Bogle
|
|
|
|
Case Summary (BLD) | | | 6/27/2019 | | DONE |
Josh Bogle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/27/2019 | | DONE |
Josh Bogle
|
|
|
ESC no - Energy no
|
Permit Ready to Issue | | | 6/27/2019 | | DONE |
|
|
|
met-need letter from parcel owner-please make sure it's on their letterhead and that the person sending the letter notes in there that they are part of the trust
|
Telephone call | | | 6/27/2019 | | DONE |
|
|
|
parcel owner sent email BUT it didn't have the letter head or the person sending it wasn't on the GIS site as parcel owner-emailed them back stating they need to have the letter on their letter head as well as it needs to show the correct name or that they are part of the trust-also gave them a GC form to sign since they have to email back anyway
|
Application received | | 6/27/2019 | | | |
|
|
|
|